Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD11-00407
StatusFinaled
Name GUHO CORP
Site Address 312 S 9TH ST
Project NameCITY CENTRE GARAGE
Customer Number 
ePlanReviewNo
Description
(CITY CENTRE GARAGE STAIR REPLACEMENT PROJECT) (8-16-11 PLAN MODIFICATION TO CHANGE THE BARRIER DESIGN AT THE LOW HEADROOM CONDITION AT THE STREET LEVEL.) Fire sprinklers used to meet high rise provisions. To remove and replace 2 existing 80 foot tall exterior stairways serving an existing 8 story parking garage. All flights of stairs and intermediate landings will be demolished and removed. Work is to include new precast concrete intermediate landings and new precast concrete flights of stairs. In addition, at each floor level landing, damaged concrete will be removed at the open edges of the slabs and replaced with new concrete. The existing bottom steel reinforcing bars, oriented perpendicular to the deck edges, where the slabs are spliced are required to be maintained and not cut. New steel guards and handrails will be installed. A thin layer of concrete topping will be applied over the existing concrete floor slab at elevator doors. Special Inspection is required for the work listed on Sheet S0.03. Precast work is required to be done by a fabricator approved by the Building Official. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. The use of public property shall be as approved and limited by ACHD. Barricades are required to route pedestrians and vehicles away from the construction sites to mitigate the danger imposed by falling objects. Egress during construction shall be as approved by the Fire Department. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 3/15/20143/31/2014 DONE
old project
First Notice2/10/20142/10/20143/5/2014 DONE
DetailsDave Hannah
Faxed 3-5-14
BLD-Final2/10/20142/10/20142/10/2014PPASS
DetailsDave Hannah
DOC - Permit Finaled2/10/20142/10/20142/10/2014PPASS
DetailsDave Hannah
BLD-Aging Inspection2/5/20142/7/20142/10/2014APASS
DetailsDave Hannah
BLD-Aging Inspection10/10/201310/10/201310/18/2013 PEND
DetailsDave Hannah
FIRE-Final Inspection5/29/20135/29/20135/29/2013APASS
DetailsForrest France
Life safety inspection completed and passed.
BLD-Aging Inspection5/7/20135/7/20135/7/2013ADONE
DetailsForrest France
Okay to final
BLD-Aging Inspection5/3/20135/3/20135/7/2013 PEND
DetailsDave Hannah
FIRE-Conference5/23/20125/23/20125/23/2012ADONE
DetailsForrest France
Regarding scope of permit attatched fire sprinkler work for replacement of existing system piping.
BLD-Final5/8/20125/8/20125/8/2012PPASS
DetailsDave Hannah
Please call -- Boyd Phone #: ###-####
PubWorks Occupancy Approval4/17/20124/17/20124/17/2012 DONE
DetailsTiffany Lowery
Zoning Approval4/16/20124/16/20124/16/2012 DONE
DetailsAndrea Tuning
BLD-Final1/12/20121/12/20121/12/2012APART
DetailsDave Hannah
Late AM---Rob Phone #: ###-#### ok to reopen the west stair tower we will final project in the spring
BLD-Final1/4/20121/5/20121/12/2012APART
DetailsDave Hannah
Late AM---Rob Phone #: ###-####
Zoning Approval Temp1/6/20121/6/20121/6/2012 DONE
DetailsSarah Schafer
FIRE-Final Inspection1/4/20121/5/20121/5/2012APASS
DetailsForrest France
Fire life safety inspection for the scope of work completed. Locks at the egress side doors from the parking deck to the stair towers to be removed prior to structural final as agreed.
BLD-Final10/12/201110/13/201110/14/2011APART
DetailsDave Hannah
Rob Phone #: ###-#### ok to reopen east stairtower and move to west stair
BLD-Final10/5/201110/10/201110/10/2011ANR
DetailsDave Hannah
Rob Phone #: ###-####
BLD-Conference10/4/201110/4/201110/5/2011PPART
DetailsDave Hannah
Rob Phone #: ###-#### walked stairs on east end all looks ok they will finish monday
CHANGE STATUS TO (ISS)  10/3/2011 DONE
DetailsTisha Gallop
picked up and paid for plan mod
BLD-Concrete8/12/20118/15/20118/16/2011APART
DetailsDave Hannah
concrete coming at 10// 6th floor// Rob Phone #: ###-####
Plan assigned to (CJW)8/15/20118/15/20118/16/2011 PASS
DetailsCarl Westfall
Routing - PLAN CHECK8/15/2011 8/16/2011 PASS
DetailsCarl Westfall
Plan modification approved.
PLANS/APPL TAKEN TO FRONT DESK  8/16/2011 DONE
Inspection Record Card- Bld  8/16/2011 DONE
DetailsTisha Gallop
Permit Ready to Issue  8/16/2011 DONE
DetailsTisha Gallop
Telephone call  8/16/2011 DONE
DetailsTisha Gallop
called Byron Folwell and left message plan mod is ready and fees
Plan Modification Accepted  8/12/2011 DONE
DetailsChristina Prado
Plan Mod Accepted for sheets A1.00 for modification of mounting of barrier rails at ground level of bothe east & west stairs. Routed to Carl Westfall for review
BLD-Concrete8/5/20118/8/20118/8/2011APART
DetailsDave Hannah
rob - concrete at 10:00 Phone #: ###-####
BLD-Concrete7/29/20117/29/20117/29/2011PPART
DetailsDave Hannah
rob Phone #: ###-#### spec inspection on site foe rebar and concrete
BLD-Concrete7/19/20117/19/20117/20/2011PPART
DetailsDave Hannah
rob - pouring at 1 Phone #: ###-####
BLD-Concrete7/8/20117/8/20117/8/2011PPASS
DetailsJim Storey
Rob-please call prior to inspection-pouring concrete at 1:00 Phone #: ###-#### 2nd floor landing ok
Issue PAID IN FULL permit  5/11/2011 DONE
DetailsChristina Prado
Routing - PUBLIC WORKS5/6/2011 5/10/2011 PASS
DetailsBeverly Mountain
Routing - PLAN CHECK5/10/2011 5/10/2011  
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  5/10/2011 DONE
Inspection Record Card- Bld  5/10/2011 DONE
Permit Ready to Issue  5/10/2011 DONE
Telephone call  5/10/2011 DONE
5-10-11called left message permit ready and fee given Also need RP & ACHD ///dld
Plan assigned to (CJW)3/7/2011 5/10/2011 PASS
DetailsCarl Westfall
Routing PW Drainage5/6/2011 5/9/2011 PASS
DetailsBrian Murphy
Routing - PLAN CHECK5/4/2011 5/6/2011  
Sent back to PW
Routing - PLAN CHECK5/2/2011 5/4/2011 PASS
DetailsCarl Westfall
Drawings approved after final structural issue was resolved.
Routing Off Site - STRUCTURAL4/28/2011 5/3/2011 PASS
DetailsCarl Westfall
Structural design approved by Consultant Structural Engineer
Routing - PUBLIC WORKS4/27/2011 5/2/2011 FAIL
DetailsConnie Baumgartner
Failed by Brian Murphy ###-####
Routing - FIRE5/2/2011 5/2/2011 PASS
DetailsScott Arellano
Attached revised IFC comments to plans
Routing PW Drainage4/27/2011 5/2/2011 FAIL
DetailsBrian Murphy
NEED ENGINEERS LETTER
Routing - PLAN CHECK3/28/2011 4/27/2011 FAIL
DetailsCarl Westfall
One structural issue not resolved. Routed to PW.
Routing Off Site - STRUCTURAL4/18/2011 4/26/2011 FAIL
DetailsCarl Westfall
Failed 3rd structural review.
Routing Off Site - STRUCTURAL4/8/2011 4/15/2011 FAIL
DetailsCarl Westfall
Failed 2nd structural review.
Telephone call  4/8/2011 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Plan resubmittals received  4/7/2011 DONE
DetailsTisha Gallop
received two copes of structural response and additional info, two coipes of fire response and additional info, three copies of plan sheets S0.01, S2.03, S2.04, S6.01, S6.02, A1.00; taken to Carl Westfall.
Routing - FIRE3/21/20113/21/20113/28/2011 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  3/28/2011 FAIL
Failed Public Works, Structural, Plumbing, Plan Check, Fire
Route to Impact Fee Review3/21/20113/24/20113/21/2011 PASS
DetailsCindy M. Gould
Existing building improvements no impact fees
Routing - PLAN CHECK3/10/2011 3/21/2011 FAIL
DetailsCarl Westfall
The IBC plan review was started on March 16, 2011 and finished on March 21, 2011. Revised drawings were required. See the plan review report.
Routing Off Site - STRUCTURAL3/8/2011 3/17/2011 FAIL
DetailsBarbara Stitt
Response required. See the plan review report.
Routing - Design Review3/10/2011 3/10/2011 PASS
DetailsAndrea Tuning
Andrea Tuning - DRH10-00203
Routing - Erosion and Sediment3/9/2011 3/10/2011 PASS
DetailsSteven Webb
ESC plan waiver is approved according to the ESC permit conditions. ESC11-00103.
Routing - PUBLIC WORKS3/8/2011 3/9/2011 FAIL
DetailsConnie Baumgartner
Failed by Brian Murphy, contact at ###-####
Routing PW Drainage3/8/2011 3/9/2011 FAIL
DetailsBrian Murphy
NEED DRAINAGE LETTER
Routing - Addressing3/8/2011 3/8/2011 PASS
DetailsTerry Records
Pending Assignment by JCB3/4/2011 3/7/2011 DONE
DetailsJason Blais
Application received 3/4/20113/4/2011 DONE
DetailsBarbara Stitt
Intake Approval  3/4/2011 PASS
OK to submit.
Plans ACCEPTED BY PLAN TECH  3/4/2011 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  3/4/2011 DONE
DetailsBarbara Stitt