Permit Information
Permit NumberBLD11-00416
StatusFinaled
Name JORDAN WILCOMB CONSTRUCTION
Site Address 825 W FORT ST
Project NameSt. Joseph's Elementary School
Customer Number 
ePlanReviewNo
Description
(ST. JOSEPH'S ELEMENTARY SCHOOL - EXPANSION) To add a two story, 7,189 sq. ft. addition on the south side of existing gym. Work includes completely demolishing a 2,400 sq. ft. one story structure attached to the south side of gym; and select interior demolition on the 1st & 2nd floor of existing school in area of new addition. Construct footings / foundation for new 2-story addition on south side of gym; exterior & interior walls, floor and roof systems; interior corridor and stairway; finishes, millwork, mechanical, electrical, plumbing, sprinkler and alarm system modifications; accessible interior and exterior route, accessible restrooms and drinking fountains. All per reviewed plans. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  2/16/2012 DONE
Second Notice 1/27/20122/2/2012 DONE
DetailsChristina Prado
faxed 2-2-12
First Notice 1/6/20121/17/2012 DONE
Permanent Occupancy  12/27/2011 DONE
DetailsChristina Prado
BLD-Final12/22/201112/23/201112/23/2011APASS
DetailsTony Young
t j Phone #: ###-####,, perm occupancy ok now
Change Expiration Date Only  11/17/2011 DONE
DetailsBarbara Stitt
BLD-Final11/8/201111/8/201111/9/2011PPART
DetailsTony Young
john Phone #: ###-####,, temp occupancy ok untill trades are fully finaled
BLD-Final11/4/201111/7/201111/9/2011PPART
DetailsTony Young
john Phone #: ###-####,, temp occ ok,, need full sign off from trades
Temporary Occupancy11/9/20112/7/201211/9/2011 DONE
DetailsChristina Prado
PubWorks Occupancy Approval11/9/201111/9/201111/9/2011 DONE
DetailsTiffany Lowery
FIRE-Final Inspection11/4/201111/7/201111/7/2011PPASS
DetailsForrest France
Corrections verified for completion. Fire life safety passed.
FIRE-Conference10/26/201110/26/201110/26/2011PDONE
DetailsForrest France
Regarding project related fire alarm permit status and final.
BLD-Final10/12/201110/13/201110/13/2011ANR
DetailsTony Young
John Phone #: ###-####
FIRE-Final Inspection10/12/201110/13/201110/13/2011AFAIL
DetailsTroy Cobbley
The project related fire alarm and fire sprinkler permits need to be addressed. Also see the city approved plans, 1st approval, for the exit signs and emergency lights that are either missing or do not function. Also many of the existing exit lights and emergency lights are not functional and will need repaired prior to a final sign off.
BLD-Conference10/12/201110/12/201110/12/2011PPART
DetailsTony Young
John Phone #: ###-####,, walk through
FIRE-Final Inspection10/12/201110/12/201110/12/2011PCANC
DetailsTroy Cobbley
Overbooked. Rescheduled for tomorrow.
FIRE-Final Inspection10/12/201110/12/201110/12/2011PCANC
DetailsTroy Cobbley
Duplicate inspection
BLD-Final10/7/201110/10/201110/12/2011PNR
DetailsTony Young
Late afternoon--John Phone #: ###-####,, conf only
FIRE-Final Inspection10/7/201110/10/201110/10/2011PCANC
DetailsTroy Cobbley
To be canceled per Scott Arellano. Tom Gainer has visited job site and provided update on job status to Scott.
BLD-Final10/7/201110/7/201110/7/2011PNR
DetailsTony Young
Late afternoon--John Phone #: ###-####,, walk through only
FIRE-Final Inspection10/5/201110/6/201110/6/2011PNR
DetailsForrest France
john Phone #: ###-####
FIRE-Sprinkler Rough-in10/3/201110/3/201110/3/2011PPART
DetailsForrest France
Overhead work okayed for cover with the exception of the first floor corrdior at the new addition.
BLD-Other9/27/20119/27/20119/27/2011PPASS
DetailsTony Young
john - ceiling grid Phone #: ###-####
BLD-Framing/Rough-in9/16/20119/16/20119/16/2011PPART
DetailsMike Jordan
Cieling grid inspection please-John Phone #: ###-####. HArdlids in girls and boys restroom, 1st. floor. Pending fire sprinkler rough in approvals.
FIRE-Conference9/13/20119/13/20119/13/2011PDONE
DetailsForrest France
Regarding fire alarm manual pull station locations.
FIRE-Final Inspection9/12/20119/12/20119/12/2011PPART
DetailsForrest France
Inspection request intended for fire sprinkler cover at the second floor remodeled classroom. Noted one sprinkler head to be replaced due to mechanical damage of the deflector.
BLD-Framing/Rough-in9/12/20119/12/20119/12/2011PPART
DetailsTony Young
john - ceiling grid Phone #: ###-####,, 2nd floor existing room ok pending trades
BLD-Framing/Rough-in9/1/20119/2/20119/2/2011PPART
DetailsDave Hannah
John phone ####-#### framing rooms 113 thru 117 ok to insulate
BLD-Final8/30/20118/31/20119/1/2011PNR
DetailsTony Young
john - temp occupancy Phone #: ###-####
BLD-Conference8/23/20118/24/20119/1/2011PPART
DetailsTony Young
partial final-John Phone #: ###-####,, kinder gaerten room and offices ok pending others
FIRE-Final Inspection8/30/20118/31/20118/31/2011ANR
DetailsForrest France
BLD-Other8/30/20118/30/20118/30/2011PPART
DetailsTony Young
ceiling grid insp//John Phone #: ###-####
office area ok pending others
BLD-Framing/Rough-in8/24/20118/25/20118/26/2011PPASS
DetailsTony Young
john Phone #: ###-####,, classrooms ok
BLD-Conference8/23/20118/24/20118/25/2011PDONE
DetailsForrest France
Regarding occupancy at the remodeled classroom 1st floor.
BLD-Other8/23/20118/23/20118/24/2011PPART
DetailsTony Young
Ceiling grid--John Phone #: ###-####,, ok pending trades in admin and kindergarden area
BLD-Framing/Rough-in8/19/20118/19/20118/22/2011PDONE
DetailsTom Arcoraci
john Phone #: ###-####
BLD-Framing/Rough-in8/19/20118/22/20118/22/2011APART
DetailsTom Arcoraci
john Phone #: ###-#### wip ok walls 2nd story
BLD-Conference8/18/20118/19/20118/19/2011APART
DetailsTony Young
john Phone #: ###-####,, on site conference with all parties,, e-mail to all parties will follow up by Scott A., (Fire) issues are construction will still be going on while school is starting,, alternate egress issues. Possible changes in the mechanical system, but will take place later (3-4 weeks)
BLD-Conference8/19/20118/19/20118/19/2011PDONE
DetailsForrest France
john Phone #: ###-####,, 1:30 pm if possible * NOTE: On site conference completed by S. Arellano.
BLD-Wall cover8/12/20118/15/20118/19/2011APASS
DetailsTony Young
john Phone #: ###-####,, re look at shear,, shear ok now,, 2nd floor walls ok to insulate
FIRE-Conference8/18/20118/19/20118/19/2011ADONE
DetailsScott Arellano
Onsite Meeting *SJA* See conditions for TEMP occupancy in attached documents.
BLD-Wall cover8/16/20118/16/20118/16/2011PPART
DetailsTony Young
john - shear inspection Phone #: ###-####,, exterior shear ok
BLD-Framing/Rough-in8/15/20118/16/20118/16/2011APART
DetailsTony Young
john - shear inspection Phone #: ###-####,, 2nd floor ok
BLD-Framing/Rough-in8/12/20118/12/20118/15/2011PPART
DetailsTony Young
john Phone #: ###-####,, SHEAR INSPECTION,, MOST OK ,, just needs a more in a few areas
BLD-Framing/Rough-in8/8/20118/9/20118/9/2011APART
DetailsTony Young
framing, hold down & roofing//John Sanchez Phone #: ###-####,, fireblocking,, work in progress,, ok
BLD-Framing/Rough-in8/5/20118/8/20118/8/2011PPART
DetailsTony Young
framing, hold down & roofing//John Sanchez Phone #: ###-####,, roof nailing ok,, hold downs ok,, walk through with framer and super,, ok,, some verbal fixes,, mainly straps and fireblocks,, hidden straps ok to cover
BLD-Conference7/28/20117/28/20117/29/2011PPASS
DetailsTony Young
take C. Westfall,, walk through
BLD-Conference7/27/20117/28/20117/28/2011APASS
DetailsTony Young
take C. Westfall,, walk through,,, GACR
BLD-Conference7/22/20117/26/20117/26/2011PPART
DetailsTony Young
1pm please-- John Phone #: ###-####
?s on a future temp occupancy for admin part..
FIRE-Conference7/22/20117/26/20117/26/2011PDONE
DetailsForrest France
Regarding project schedule and related FIR trade permit work.
BLD-Concrete7/13/20117/13/20117/13/2011PPART
DetailsTony Young
JOHN Phone #: ###-####,, S. I. report
BLD-Footing7/11/20117/12/20117/12/2011APART
DetailsTony Young
john Phone #: ###-####,, Strata on site,, ok pending report
BLD-Footing7/5/20117/6/20117/6/2011PPART
DetailsTony Young
john - pouring at 3:00 Phone #: ###-####,, ramp walls and piers,, ok pending special inspection report
BLD-Footing7/1/20117/1/20117/1/2011PPART
DetailsTony Young
john -rebar - pouring at 1:30 - floor inspection also Phone #: ###-####,, ftgs for ADA ramp,, and 3 columns,, ok pending special inspection reports
BLD-Framing/Rough-in6/29/20116/29/20116/29/2011PPART
DetailsTony Young
JOHN Phone #: ###-####,, under floor shear walls.. ok,,// . anchor bolts,, adding at ends of plates,, // epoxy shear holddowns ok pending special inspections
BLD-Footing6/23/20116/24/20116/24/2011APART
DetailsTony Young
john - rebar - pouring at 9 Phone #: ###-####,, pending special inspection report
BLD-Footing6/21/20116/22/20116/22/2011APART
DetailsTony Young
john - rebar inspection Phone #: ###-####,, some walls,, some footings on west side,, special inspectors on site
BLD-Footing6/16/20116/17/20116/17/2011APART
DetailsTony Young
JOHN Phone #: ###-####,, pending special inspection report,, had to have contractor dig out an area of footing to make it 12" thick,, also had a short rebar lap,, (8") al this was after 1st S. I. looked at the job.. fix is in progress and concrete tester and job super was laid out on what was required,,, then ok to pour
Additional plans submitted  6/10/2011 PASS
2007 Soils geotech report from Strata Engineers was used by AHJ, Keith Jones, Strucutral Engineer to evaluate soil conditions for design of new two story addition. Copy of report and cover letter from Keith Jones submitted in response to deferred submittal for plan review item #12 on plan review report. Report accepted.
Issue PAID IN FULL permit  5/16/2011 DONE
DetailsTisha Gallop
Routing - PLAN CHECK4/28/2011 5/11/2011 PASS
DetailsDan Stuart
Received response and new structural plan sheets and calcs for remaining three structural plan review items. Structural review approved and plans to permit desk to issue.
Plan resubmittals received  5/11/2011 DONE
received 3 response,3 structural calcs,& 3 copies of sheets S2.1, S2.2, S4.1 inserted by Jessica from insite arch. sent to Dan S.
PLANS/APPL TAKEN TO FRONT DESK  5/11/2011 PASS
Approved as noted on plans and all attached plan reviews of all reviewing agencies.
Print Occupancy Form  5/11/2011 DONE
Permit Ready to Issue  5/11/2011 DONE
Telephone call  5/11/2011 DONE
5-11-11 called permit ready and fee given Also need GC ///DLD
Plan assigned to (DRS)3/8/2011 5/11/2011 PASS
DetailsDan Stuart
Plan resubmittals requested  5/10/2011 DONE
Sent e-mail copy of Structural Plan Review Report to Dana Kaufman for response to remaining engineering concerns needing to be addressed.
Routing Off Site - STRUCTURAL4/28/2011 5/9/2011 FAIL
DetailsBarbara Stitt
Called Action Courier for pick up @ 3:20pm
5/9/11 - 2nd Structural Plan Review Report provided. Copy of remaining items needing to be addressed e-mailed to architect, Dana Kaufman to forward to project engineer. Cover letter acompanying the structural review indicated remaining items could be approved by PDS Plan Review and re-routing back to them was no necessary.
Plan resubmittals received  4/29/2011 DONE
DetailsChristina Prado
Received one more sheet A2.2 for plans. Inserted by arch rep and taken to Dan Stuart for review
Plan resubmittals received  4/28/2011  
DetailsBarbara Stitt
Received 2 copies of sheet A2.2 and inserted into plans by architects office. Received 1 cover transmittal, sheets S1.1, S1.2, S2.1, S2.2, S2.3, S3.1, S3.2, S4.1, S4.2, S5.1 rolled up and given to Dan Stuart.
Routing - PLAN CHECK4/20/2011 4/28/2011 PEND
DetailsDan Stuart
Resubmittals inserted. Redlined notes added to plans. Structural Plan review resubmittal set and calcs routed off site for structural re-review.
Plan resubmittals received  4/27/2011 DONE
DetailsChristina Prado
Received one copy of transmittal; one copy of response; one copy of changes descriptions; one copy of form #310; two copies of structural calcs; two copies of plans A0.1, AD1.1, A2.1, A2.2, A2.3, A6.1, A6.2, A6.3, A6.4, A8.1, S1.1, S1.2 S2.1, S2.2, S2.3, S3.1, S3.2, S4.1, S4.2, S5.1, MG1.3, E1.1, E2.1, E2.2, E5.0 &E5.2. Inserted by Arch. Rep. and taken back to Dan Stuart for review.
Route to Impact Fee Review4/19/20114/22/20114/21/2011 PASS
DetailsCindy M. Gould
fire and police impact fees on new sq footage
Routing - FIRE4/19/20114/19/20114/20/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  4/20/2011 FAIL
Failed Public Works, Structural
Routing - Erosion and Sediment3/31/2011 4/1/2011 PASS
DetailsSteven Webb
Resubmittal changes of 3/29/11 modified original ESC approval. ESC plan is approved according to the ESC plan and ESC permit conditions. ESC11-00107
Routing - PUBLIC WORKS3/29/2011 3/31/2011 PASS
DetailsBeverly Mountain
Routing PW Drainage3/29/2011 3/31/2011 PASS
DetailsBrian Murphy
Resubmittals of 3/29/11
Plan resubmittals received  3/29/2011  
DetailsBarbara Stitt
Received 3 copies of sheets C1.1, C1.2, C2.0 and inserted into plans then returned to Dan Stuart's desk
Plan resubmittals received  3/29/2011  
DetailsBarbara Stitt
Received updated esc control plan narrative and C2.0 sheet-needs re-routed to ESC due to updates
Plan resubmittals received  3/29/2011  
DetailsBarbara Stitt
Received a response letter from Erickson-Civil, Inc dated 3-29-11, and 2 copies of sheets C1.1, C1.2, C2.0 for Brian Murphy
Routing - PLAN CHECK3/18/2011 3/29/2011 PEND
DetailsDan Stuart
Routing to PW Drainage for re-review of 3/29/11 resubmittals.
Routing Off Site - STRUCTURAL3/8/2011 3/22/2011 FAIL
DetailsDan Stuart
Copy of structural plan review comments e-mailed to architect for response.
Routing - PLANNING3/17/2011 3/18/2011 PASS
DetailsSusan Riggs
Susan Riggs
Matt approved on 3-16-11 for Historic design review
Routing - PLANNING3/14/2011 3/16/2011 PASS
DetailsMatthew A Halitsky
DRH08-296 Matt H.; CUP08-113, CVA08-40 Susan R.

Routed to Susan R. (3-16-2011).
Routing - PLUMBING3/9/2011 3/14/2011 PASS
DetailsBill VanDegrift
note 6, page P2.1-- the western roof dtain and down spout nozzle needs to be increased to 4" at the connection of the existing gym system.
Routing - Erosion and Sediment3/8/2011 3/9/2011 PASS
DetailsSteven Webb
ESC plan is approved according to the ESC plan and ESC permit Conditions. ESC11-00107
Routing - PUBLIC WORKS3/7/2011 3/8/2011 FAIL
DetailsBeverly Mountain
Telephone call  3/8/2011 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Routing PW Sewer Rating3/8/2011 3/8/2011 PASS
DetailsConnie Baumgartner
Pending Assignment by JCM3/7/2011 3/8/2011 DONE
DetailsJohn Menard
Routing - Addressing3/8/2011 3/8/2011 PASS
DetailsTerry Records
Routing PW Drainage3/8/2011 3/8/2011 FAIL
DetailsBrian Murphy
NEEDS DRAINAGE PLAN
Application received 3/7/20113/7/2011 DONE
DetailsTisha Gallop
Intake Approval  3/7/2011 PASS
Plans ACCEPTED BY PLAN TECH  3/7/2011 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  3/7/2011 DONE
DetailsTisha Gallop
Routing - PLANNING Land Div3/7/2011 3/7/2011 PASS
DetailsDave Abo
Lots 7-12, Block 90 BCOT