Third Notice | | 7/3/2011 | 6/29/2011 | | DONE |
|
|
|
|
Second Notice | | 6/24/2011 | 6/28/2011 | | DONE |
|
|
|
|
First Notice | | 6/6/2011 | 6/14/2011 | | DONE |
|
|
|
|
BLD-Final | 5/26/2011 | 5/27/2011 | 5/27/2011 | A | PASS |
Mike Jordan
|
|
|
Dan Phone #: ###-####. OK for perm occ.
|
FIRE-Final Inspection | 5/26/2011 | 5/27/2011 | 5/27/2011 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Permanent Occupancy UNPAID FEE | | | 5/27/2011 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 5/25/2011 | 5/26/2011 | 5/26/2011 | P | FAIL |
Troy Cobbley
|
|
|
Per Tim Woodard and I's discussion the locking hardware from the breakroom to the warehouse can remain if the exit sign above this door is removed. Also, to provide an exit from this new area, the dead bolt will need to be removed from the door leading into the existing office area and non locking lever hardware installed. The fire alarm system does not need to be extended from the existing office into this new area based on information from a 2008 FIR permit stating this system was voluntary.
|
BLD-Framing/Rough-in | 5/9/2011 | 5/10/2011 | 5/10/2011 | A | PASS |
Mike Jordan
|
|
|
Dan Phone #: ###-#### Rof decking attachment and framing.
|
BLD-Framing/Rough-in | 4/25/2011 | 4/26/2011 | 4/26/2011 | A | PART |
Mike Jordan
|
|
|
DAN Phone #: ###-####. Interior steel stud walls only. Pend. rough ins.
|
Issue PAID IN FULL permit | | | 4/18/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/15/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 4/15/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 4/15/2011 | | DONE |
|
|
|
|
Telephone call | | | 4/15/2011 | | DONE |
|
|
|
left vm for pat - permit ready and fees given
|
Permit Ready to Issue | | | 4/15/2011 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 3/9/2011 | | 4/15/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 3/18/2011 | | 4/15/2011 | | PASS |
Tim L. Woodard
|
|
|
Approved with resubmittals and redlines. TLW
|
Plan resubmittals received | | | 4/13/2011 | | DONE |
|
|
|
4-13-11 received 1 transmittal,1 comment,2 structural calcs,& 1 2009 IECC envelope compliance certificate, 2 copies of sheets A0.0,A1.0,A2.0,A3.0,A4.0 taken to Tim Woodard
|
Routing - PUBLIC WORKS | 3/16/2011 | | 3/18/2011 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Addressing | 3/17/2011 | | 3/17/2011 | | PASS |
Terry Records
|
|
|
|
Routing PW Sewer Rating | 3/17/2011 | | 3/17/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLAN CHECK | 3/9/2011 | | 3/16/2011 | | FAIL |
Tim L. Woodard
|
|
|
Refer to plan review report. TLW
|
1st review completed | | | 3/16/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/9/2011 | | DONE |
|
|
|
3-9-11 ok per Tim Woodard for level 1 intake
|
Recd Pcfee & Taken To Pln CK | | | 3/9/2011 | | DONE |
|
|
|
|
Application received | | 3/9/2011 | | | |
|
|
|
|