Permit Information
Permit NumberBLD11-00439
StatusFinaled
Name BENCHMARK CONSTRUCTION INC
Site Address 1440 W BANNOCK ST
Project NameST. PAUL FAMILY LIFE EDUCATION
Customer Number 
ePlanReviewNo
Description
(ST. PAUL FAMILY LIFE EDUCATION) *** 11-8-2011 PLAN MODIFICATION TO INCLUDE: CHANGE THE FUNCTION OF USE OF BASEMENT ROOMS 029 AND 026 TO BUSINESS USES RATHER THAN FELLOWSHIP ROOMS PER THE ATTACHED LETTER PROVIDED BY TENANT. *** Remodel of an existing office building per approved plans. The lower floor level is 4,700 sq. ft. and the upper floor level is 4,724 sq. ft. Work to include: demolition work per plans; install a new pre-engineered accessible steel ramp and guard rail at the entry location; construct interior wall partitions two create four new fully accessible restrooms, a new break room and offices; modify an existing door opening/landing and construct a new exit stair in the rear of the building; install new handrails at select existing stair locations; provide new plumbing fixtures including two new mop sinks and a fully accessible (hi-lo) drinking fountain; provide new office counters and work stations; provide new door hardware; repair the damaged roof and soffit; exterior site improvements; new electrical, new plumbing, and new mechanical work. All work shall be per the approved plans, plan review report, and all other reviewing agencies approvals. A new Certificate of Occupancy with the new occupant load total is to be issued when completed and approved prior to tenant occupying this space. NOTE: This building is not fire sprinklered. CZC11-00015 **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 12/15/201112/5/2011 DONE
This permit finaled on the web by Layton Anderson
First Notice11/28/201111/28/201112/5/2011 DONE
DetailsTony Young
This permit finaled on the web by Layton Anderson
First Notice 12/3/201112/5/2011 DONE
BLD-Final11/23/201111/28/201111/28/2011ADONE
DetailsTony Young
To final permit in computer
DOC - Permit Finaled11/28/201111/28/201111/28/2011PPASS
DetailsTony Young
done
Permanent Occupancy  11/23/2011 DONE
DetailsChristina Prado
Zoning Approval11/22/201111/22/201111/22/2011 DONE
DetailsAndrea Tuning
BLD-Final11/18/201111/21/201111/21/2011PPART
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by Layton Anderson,,, ok pending others
FIRE-Final Inspection11/15/201111/16/201111/16/2011APASS
DetailsForrest France
Correction items verified for completion. Plan modifications reviewed, life safety final approved.
CHANGE STATUS TO (ISS)  11/15/2011 DONE
DetailsTisha Gallop
Plan assigned to (SRZ)11/2/201111/2/201111/14/2011 PASS
DetailsSam Zahorka
Plan modification received and 1st review completed. Plan in Fire review pending approval.
Routing - FIRE11/9/2011 11/14/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
Print Occupancy Form  11/14/2011 DONE
Telephone call  11/14/2011 DONE
DetailsChristina Prado
called and gave Layton fees due
Permit Ready to Issue  11/14/2011 DONE
DetailsChristina Prado
Routing - PLAN CHECK11/9/2011 11/9/2011 PASS
DetailsSam Zahorka
CHANGE STATUS TO (REV)  11/2/2011  
DetailsBarbara Stitt
Plan Modification Accepted  11/2/2011  
DetailsSam Zahorka
Plan modification accepted forthe change of rooms 026 & 029 in the basement will be changed to be offices instead of fellowship rooms. Sheets A3.2 & T1.0 were submited along with application. No change in value.
FIRE-Final Inspection10/27/201110/28/201110/28/2011ANR
DetailsForrest France
On site meeting with contractor regarding plan review notes and field inspection items for fire life safety approvals.
FIRE-Final Inspection10/26/201110/27/201110/27/2011AFAIL
DetailsForrest France
C/N items include; missing building address numbers, door hardware is incorrect at five locations, missing exit signage/EM lighting at two areas per plan, see A.3.1 and A.3.2 for marked locations. Reference also plan review report item #3, fire code review notes # 10, 12, and item #2 regarding manual fire alarm system requirements. Resubmittal plan sheet A.3.2 keynote 17 indicate a manual fire alarm system per IFC to be provided.
BLD-Framing/Rough-in8/5/20118/8/20118/8/2011PPART
DetailsTony Young
layton Phone #: ###-####,, walls ok to cover
Issue PAID IN FULL permit  6/15/2011 DONE
DetailsBarbara Stitt
Plan assigned to (SRZ)3/10/20113/10/20115/27/2011 PASS
DetailsSam Zahorka
Routing - PLAN CHECK5/23/2011 5/27/2011 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  5/27/2011 DONE
DetailsSam Zahorka
Print Occupancy Form  5/27/2011 DONE
Permit Ready to Issue  5/27/2011 DONE
DetailsBarbara Stitt
Telephone call  5/27/2011 DONE
DetailsBarbara Stitt
Called Patrick and told him that permit is ready & fees due on 5-27-11 @ 2:10pm//BAS
Routing - PLAN CHECK5/18/2011 5/23/2011 PASS
DetailsSam Zahorka
Routing - FIRE5/20/2011 5/23/2011 PASS
DetailsScott Arellano
Please, see attached reivew.
Plan resubmittals received  5/20/2011 DONE
DetailsTisha Gallop
received response and two copies of plan sheet A3.2; taken to Sam Zahorka.
Routing - FIRE5/16/2011 5/18/2011 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
Case Summary (BLD)  5/16/2011 DONE
DetailsSam Zahorka
Routing - PLAN CHECK3/31/2011 5/16/2011 PASS
DetailsSam Zahorka
Plan resubmittals received  5/12/2011 DONE
DetailsBarbara Stitt
Received a letter for Scott Arellano dated 5-6-11 from Pat McKeegan, a letter for Sam Zahorka dated 5-4-11 from Pat McKeegan
Plan resubmittals received  5/6/2011 DONE
DetailsChristina Prado
Received response letter and two sets of plans T1.0, A1.1, A1.2, A2.1, A2.2, A3.1, A3.2, A3.3, A3.4, A4.1, A4.2 and A5.1. Routed to Sam Zahorka for review
Telephone call  4/20/2011 DONE
DetailsSam Zahorka
Spoke with Patrick McKeegan the architect answered his email questions and went over the needed corrections with him.
1st review completed  3/31/2011 FAIL
Failed Plan Check, Fire
Routing - FIRE3/29/2011 3/31/2011 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
Routing - PLAN CHECK3/14/2011 3/29/2011 FAIL
DetailsSam Zahorka
Resubmittals requested
Routing - Erosion and Sediment3/11/2011 3/14/2011 PASS
DetailsSteven Webb
ESC plan waiver request is approved according to the ESC Permit Conditions. ESC11-00118
Routing - Design Review3/14/2011 3/14/2011 PASS
DetailsAndrea Tuning
Andrea Tuning - CZC11-00015
Routing PW Sewer Rating3/11/2011 3/11/2011 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS3/10/2011 3/11/2011 PASS
DetailsConnie Baumgartner
Pending Assignment by JCB3/9/2011 3/10/2011 DONE
DetailsJason Blais
Plan Reviewer's activity  3/10/2011 DONE
DetailsJason Blais
Emailed architect for him to contact ACHD for evaluation of if any impact fees are due. Written verification will need to be provided to our permit counter prior to permit issuance.
Routing - Addressing3/10/2011 3/10/2011 PASS
DetailsTerry Records
Intake Approval  3/9/2011 PASS
OK to submit for permit.
Plans ACCEPTED BY PLAN TECH  3/9/2011 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  3/9/2011 DONE
DetailsChristina Prado
Routing - PLAN CHECK11/14/2011 11/14/2009 PASS
DetailsJason Blais
Application received 3/9/2011