BLD-Final | 11/21/2011 | 11/23/2011 | 11/23/2011 | A | PASS |
Tony Young
|
|
|
MIke-Please call while doing inspection Phone #: ###-####
|
DOC - Permit Finaled | 11/23/2011 | 11/23/2011 | 11/23/2011 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 11/21/2011 | 11/21/2011 | 11/21/2011 | P | PART |
Tony Young
|
|
|
MIke-Please call while doing inspection Phone #: ###-####,, hand rails ok per 325 and 408,,, turn exception.. still need a protection post
|
BLD-Final | 11/15/2011 | 11/16/2011 | 11/16/2011 | A | FAIL |
Tony Young
|
|
|
Eric Phone #: ###-#### please call for access,,, need continous handrail,, need protection post in front of gas appliance,, seal firewall/ ceiling
|
BLD-Grading Inspection | 11/14/2011 | 11/14/2011 | 11/14/2011 | A | DONE |
Terry Records
|
|
|
Final grading and drainage approved
|
BLD-Other | 8/19/2011 | 8/22/2011 | 8/22/2011 | A | NR |
Jim Storey
|
|
|
eric Phone #: ###-####,, soffit and light boxes
|
BLD-Framing/Rough-in | 8/18/2011 | 8/19/2011 | 8/19/2011 | A | PART |
Tony Young
|
|
|
eric Phone #: ###-####,,, soffits,, lighting boxes,, work in progress
|
BLD-Energy code compliance | 8/10/2011 | 8/11/2011 | 8/11/2011 | A | PART |
Dave Hannah
|
|
|
mike Phone #: ###-#### ok to cover int but still needs can lights in sofits protected also crew on site double rocking sofits as thry cover
|
BLD-Other | 8/9/2011 | 8/10/2011 | 8/10/2011 | P | FAIL |
Mike Jordan
|
|
|
mike Phone #: ###-####,, soffits. Correction notice posted.
|
BLD-Energy code compliance | 8/9/2011 | 8/10/2011 | 8/10/2011 | P | FAIL |
Jim Storey
|
|
|
mike Phone #: ###-#### canlights in soffit must be boxed or ratted lights/ walls in attic need encapsulated.
|
BLD-Conference | 8/9/2011 | 8/9/2011 | 8/9/2011 | P | PART |
Tony Young
|
|
|
mike Phone #: ###-####,, conf on soffits,, need 2 layers
|
BLD-Framing/Rough-in | 8/8/2011 | 8/8/2011 | 8/8/2011 | P | PART |
Tony Young
|
|
|
Mike Phone #: ###-####,, frame ok,,, need another mech inspection,,, put a SWO on soffits,, they need 2 layers of 5/8",, (they were only putting 1 layer)
|
BLD-Conference | 8/5/2011 | 8/5/2011 | 8/5/2011 | P | PART |
Tony Young
|
|
|
Jason Phone #: ###-####,, conf with the framer
|
BLD-Framing/Rough-in | 8/5/2011 | 8/5/2011 | 8/5/2011 | A | NR |
Tony Young
|
|
|
blake - ###-####,, conf only
|
BLD-Framing/Rough-in | 8/3/2011 | 8/4/2011 | 8/4/2011 | A | FAIL |
Tony Young
|
|
|
mike Phone #: ###-####,, walk through only,, need to call for a on site conf.
|
Reopen Permit (ISS) | | | 7/20/2011 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 7/19/2011 | | DONE |
|
|
|
|
Telephone call | | | 7/19/2011 | | DONE |
|
|
|
t/c w mike - permit (plan mod) ready and fees given
|
Case Summary (BLD) | | | 7/18/2011 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/18/2011 | | 7/18/2011 | | PASS |
Carl D Madsen
|
|
|
Carl Madsen
|
Routing - MECHANICAL | 7/15/2011 | | 7/18/2011 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 7/15/2011 | | |
Carl D Madsen
|
|
|
Received 2 copies of of manual j, sheet 3 of 15, sheet 4 of 15 and take to Carl Madsen
|
BLD-Foundation | 5/12/2011 | 5/13/2011 | 5/13/2011 | A | PART |
Tony Young
|
|
|
Steve Phone #: ###-####,, poured
|
BLD-Footing | 5/10/2011 | 5/10/2011 | 5/10/2011 | P | PART |
Tony Young
|
|
|
|
PubWorks Subgrade Approval | 5/6/2011 | 5/6/2011 | 5/6/2011 | | DONE |
Terry Records
|
|
|
Footing subgrade approved by the geotechnical engineer
|
Issue PAID IN FULL permit | | | 4/26/2011 | | DONE |
Barbara Stitt
|
|
|
|
Route to Impact Fee Review | 3/18/2011 | 3/23/2011 | 4/5/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Inspection Record Card- Bld | | | 4/5/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/5/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 4/5/2011 | | DONE |
Tisha Gallop
|
|
|
called Erik/Highland Homes and told him permit is ready and fees.
|
Plan assigned to (CDM) | 3/18/2011 | 3/18/2011 | 4/4/2011 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 4/4/2011 | | 4/4/2011 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 4/4/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/4/2011 | | |
|
|
|
|
Routing - PLAN CHECK | 3/29/2011 | | 4/1/2011 | | FAIL |
Carl D Madsen
|
|
|
Structure is located in WUI zone A and required a noncombustible siding material and a class A roofing material.
|
1st review completed | | | 4/1/2011 | | FAIL |
|
|
|
|
Routing - FIRE | 3/28/2011 | | 3/29/2011 | | PASS |
Scott Arellano
|
|
|
Fire Sprinklers are NOT required. The access appears to be within the 150' limit to all portions of the home.
|
Routing - Erosion and Sediment | 3/25/2011 | | 3/28/2011 | | PASS |
Steven Webb
|
|
|
ESC11-00143 plan approved per the attached conditions.
|
Routing - MECHANICAL | 3/28/2011 | | 3/28/2011 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 3/23/2011 | | 3/25/2011 | | FAIL |
Troy James
|
|
|
need to enlarge duct drawing and need expanded performance data for equipment
|
Routing - PLANNING | 3/22/2011 | | 3/23/2011 | | PASS |
Joshua Johnson
|
|
|
|
Routing - Addressing | 3/18/2011 | | 3/22/2011 | | PASS |
Terry Records
|
|
|
|
Routing - PUBLIC WORKS | | | 3/22/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | | | 3/22/2011 | | PASS |
Terry Records
|
|
|
Approved as Category 3
|
Application received | | 3/15/2011 | 3/18/2011 | | DONE |
Tisha Gallop
|
|
|
need ResCheck before begin routing plans, said would e-mail it to me.//received ResCheck on 3/18/11
|
Intake Approval | | | 3/18/2011 | | PASS |
Tisha Gallop
|
|
|
received ResCheck
|
Plans ACCEPTED BY PLAN TECH | | | 3/18/2011 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/18/2011 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 3/17/2011 | | FAIL |
Tisha Gallop
|
|
|
need Res Check
|
Telephone call | | | 3/16/2011 | | DONE |
Tisha Gallop
|
|
|
called main ph# for applicant on application for Highland Homes. left vm stil not received ResCheck and unable to start routing without it.
|