BLD-Final | 6/1/2011 | 6/2/2011 | 6/2/2011 | P | PASS |
Mike Jordan
|
|
|
Jason Phone #: ###-####
|
DOC - Permit Finaled | 6/2/2011 | 6/2/2011 | 6/2/2011 | P | PASS |
Mike Jordan
|
|
|
Residential certificate of occupancy was isuued.
|
BLD-Final | 5/31/2011 | 6/1/2011 | 6/1/2011 | A | FAIL |
Mike Jordan
|
|
|
jason Phone #: ###-####. Provide CO2 detectors as required and certificate for blower door test or checlist.
|
BLD-Energy code compliance | 5/4/2011 | 5/5/2011 | 5/5/2011 | A | PASS |
Mike Jordan
|
|
|
jason - as soon as possible please Phone #: ###-####
|
BLD-Framing/Rough-in | 5/5/2011 | 5/5/2011 | 5/5/2011 | A | PASS |
Mike Jordan
|
|
|
jason - as soon as possible please Phone #: ###-####. All framing issues have been resolved.
|
CHANGE STATUS TO (ISS) | | | 5/4/2011 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 5/2/2011 | 5/3/2011 | 5/3/2011 | P | FAIL |
Mike Jordan
|
|
|
jason Phone #: ###-####. COmplete all fireblocking, Provide headers and aditional studs at point loads at roof framing, Provide total encapsulation of all exterior walls. ok to insulate.
|
Plan resubmittals received | | | 5/2/2011 | | PASS |
|
|
|
approved with notes
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/2/2011 | | |
|
|
|
called mechanical contractor to come in and pick up revised manual J
|
BLD-Foundation | 4/6/2011 | 4/7/2011 | 4/7/2011 | A | PASS |
Mike Jordan
|
|
|
Ryan-Stem wall inspection please Phone #: ###-####
|
BLD-Footing | 4/5/2011 | 4/6/2011 | 4/6/2011 | A | PART |
Mike Jordan
|
|
|
RYAN Phone #: ###-####. Footing ok, noted that setbacks on approved plan are different than what concrete contractor has. Needs to either move footing or get new set backs approved. Contacted contractor and left message.
|
BLD-Foundation | 4/6/2011 | 4/6/2011 | 4/6/2011 | P | CANC |
Mike Jordan
|
|
|
late pm//stem wall ins//Ryan Phone #: ###-####
|
Plan resubmittals received | | | 4/6/2011 | | DONE |
Barbara Stitt
|
|
|
Reveised site plan submitted and approved by Carl Madsen, Colleen Carrol, and Josh Johnson while customer was here. Customer tool an approved and signed copy of new site plan with him out to the field when he left and one was scanned and attached in the documents.
|
OVERRIDE | | | 3/31/2011 | | |
|
|
|
|
Telephone call | | | 3/31/2011 | | DONE |
Barbara Stitt
|
|
|
Called Jason and told him that permit is ready & fees due on 3-31-11 @ 8:15am
|
Issue PAID IN FULL permit | | | 3/31/2011 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 3/31/2011 | | PASS |
Barbara Stitt
|
|
|
|
1st review completed | | | 3/30/2011 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/30/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/30/2011 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/30/2011 | | DONE |
|
|
|
|
Plan assigned to (CDM) | | | 3/30/2011 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 3/29/2011 | | 3/30/2011 | | PASS |
Carl D Madsen
|
|
|
|
Routing - MECHANICAL | 3/21/2011 | | 3/29/2011 | | PASS |
Troy James
|
|
|
designer redesigned manual J calcs after first review by dixie, waited for response for first review. Called designer to see where he is at with the corrections. He then told me he was going to have to redesign because the furnace was going to be relocated.
|
Route to Impact Fee Review | 3/16/2011 | 3/21/2011 | 3/21/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 3/17/2011 | | 3/21/2011 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - PUBLIC WORKS | 3/16/2011 | | 3/17/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 3/16/2011 | | 3/16/2011 | | PASS |
Terry Records
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/16/2011 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 3/16/2011 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/16/2011 | | DONE |
Christina Prado
|
|
|
|
Application received | | 3/16/2011 | | | |
|
|
|
|