Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD11-00551
StatusFinaled
Name DEBOER DRYWALL & ACOUSTICAL
Site Address 1519 W GROVE ST
Project NameAZURE HAIR SALON
Customer Number 
ePlanReviewNo
Description
(AZURE HAIR SALON) Permit is to remodel an existing 2,358 square foot mercantile/office space into a new hair salon tenant. PLAN MODIFICATION 6-16-2011 – Modification submitted to change the type of construction from IIB to VB.**TLW** This building is not fire sprinklered. Approval contingent upon adhering to the approved plans on file, redlines, and attached plan review report. Work to include: demolition of existing non-combustible full height partition walls, installation of new non-combustible full height partition walls, new light lighting/switching, new accessible doors / hardware, new mechanical system, and finishes in compliance with chapter 8 of the 2009 IBC. This building is not Fire sprinklered. **TLW** PLAN MODIFICATION 6-16-2011 – Modification submitted to change the type of construction from IIB to VB.**TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 9/4/20118/26/2011 DONE
Third Notice 8/31/20118/26/2011 DONE
First Notice 8/19/20118/25/2011 DONE
Permanent Occupancy  8/9/2011  
BLD-Final8/3/20118/8/20118/8/2011APASS
DetailsDave Hannah
david Phone #: ###-#### ok for prm occ
BLD-Final8/3/20118/3/20118/3/2011PCANC
DetailsDave Hannah
david Phone #: ###-####
BLD-Final7/18/20117/19/20117/19/2011APART
DetailsDave Hannah
david Phone #: ###-#### ok for temp occ ok needs to have ada sink in brake room
BLD-Final7/14/20117/15/20117/18/2011PDEFR
DetailsDave Hannah
david Phone #: ###-####
FIRE-Final Inspection7/15/20117/15/20117/15/2011PPASS
DetailsForrest France
Reinspection passed. Life safety finaled.
FIRE-Final Inspection7/14/20117/15/20117/15/2011AFAIL
DetailsForrest France
Duct detector failed to initiate unit shutdown upon smoke detection. Door hardware and signage corrections are finished.
BLD-Final7/14/20117/14/20117/15/2011PCANC
DetailsDave Hannah
david Phone #: ###-####
FIRE-Final Inspection7/14/20117/14/20117/14/2011PFAIL
DetailsForrest France
Correction items include; remove manual thumbturn at the main entry/exit and provide approved hardware and signage, provide test method for the new duct detector including appropriate remote indicator/key switch.
BLD-Final7/13/20117/14/20117/14/2011ACANC
DetailsDave Hannah
David Phone #: ###-####
Reopen Permit (ISS)  6/21/2011 DONE
DetailsChristina Prado
(F) Reprint permit  6/21/2011 DONE
DetailsChristina Prado
Plan assigned to (TLW)6/15/2011 6/17/2011 PASS
DetailsTim L. Woodard
Routing - FIRE6/16/2011 6/17/2011 PASS
DetailsScott Arellano
Please, see attached review with comments.
Routing - PLAN CHECK6/17/2011 6/17/2011 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  6/17/2011 DONE
DetailsTim L. Woodard
Case Summary (BLD)  6/17/2011 DONE
DetailsTim L. Woodard
Print Occupancy Form  6/17/2011 DONE
Telephone call  6/17/2011 DONE
DetailsChristina Prado
Called Matt and gave ffes due for plan modification
Override - Parcel Holds  6/17/2011  
Permit Ready to Issue  6/17/2011 DONE
DetailsChristina Prado
Routing - PLAN CHECK6/16/2011 6/16/2011 PASS
DetailsTim L. Woodard
Plan Modification Accepted  6/15/2011  
DetailsTim L. Woodard
Plan modification accepted to convert construction type from II-B to V-B on sheet A0.00. No certificate of value was submited.
BLD-Energy code compliance6/10/20116/10/20116/11/2011PPART
DetailsDave Hannah
david Phone #: ###-#### ok to cover ext walls
BLD-Framing/Rough-in6/9/20116/10/20116/10/2011APART
DetailsDave Hannah
David Hale Phone #: ###-#### steel studs ok but need ether to change type of construction or remove wood walls ok to insulate ext walls
Issue PAID IN FULL permit  5/31/2011 DONE
DetailsTisha Gallop
submitted for CZC11-00126, ok to issue bldg permit per Sarah Schafer
Telephone call  5/3/2011 DONE
DetailsTisha Gallop
called David and told him new fees per adjustment to swr fees went down. Reminded him still need to submit for CZC before we can issue the permit.
Plan assigned to (TLW)  5/2/2011 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK5/2/2011 5/2/2011 PASS
DetailsTim L. Woodard
Approved with resubs for mechanical, engineering for new unit, and redlines. TLW
PLANS/APPL TAKEN TO FRONT DESK  5/2/2011 DONE
DetailsTim L. Woodard
Case Summary (BLD)  5/2/2011 DONE
DetailsTim L. Woodard
Print Occupancy Form  5/2/2011 DONE
Permit Ready to Issue  5/2/2011 DONE
Telephone call  5/2/2011 DONE
5-2-11 called left message permit ready and fee given Also left message that we can not issue permit until CZC has been submitted ///dld
Plan resubmittals received  4/28/2011 DONE
DetailsTisha Gallop
received alternate request to BO and two copies of plan sheet M0.2 and Mechanical Compliance ComCheck on 8-1/2" x 11"; taken to Tim Woodard
Routing - PLAN CHECK4/4/2011 4/7/2011 FAIL
DetailsTim L. Woodard
Redline review comments. Need mechanical compiance before issuance. TLW
1st review completed  4/7/2011 DONE
DetailsTim L. Woodard
Routing - MECHANICAL3/31/2011 4/4/2011 PASS
DetailsTroy James
Routing - PLUMBING3/30/2011 3/31/2011 PASS
DetailsBill VanDegrift
2" horizontal waste to breakroom sink, above grade, required. hair sinks are two fixture unit fixtures, the wast and vent system for that branch is undersized. HS-1 faucetts will require vacuum breakers. service isolation will need to be verified(water).
Routing - PLAN CHECK3/25/2011 3/30/2011 PEND
DetailsTim L. Woodard
Sent to plumbing for review. TLW
Routing - PUBLIC WORKS3/25/2011 3/25/2011 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating3/25/2011 3/25/2011 PASS
DetailsConnie Baumgartner
Routing - Addressing3/25/2011 3/25/2011 PASS
DetailsTerry Records
Plans ACCEPTED BY PLAN TECH  3/25/2011 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  3/25/2011 DONE
DetailsChristina Prado
Application received 3/24/2011