BLD-Final | 4/13/2011 | 4/14/2011 | 4/14/2011 | A | PASS |
Dave Hannah
|
|
|
Sarah McClarren ###-####- insp. per 410
|
Permanent Occupancy | | | 4/14/2011 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 4/12/2011 | 4/13/2011 | 4/13/2011 | A | PASS |
Forrest France
|
|
|
Corrections verified for completion. Life safety passed.
|
BLD-Final | 4/4/2011 | 4/7/2011 | 4/7/2011 | P | CANC |
Dave Hannah
|
|
|
Sara Phone #: ###-####
|
FIRE-Final Inspection | 4/4/2011 | 4/5/2011 | 4/5/2011 | P | FAIL |
Forrest France
|
|
|
See item #2 on the list of general requirements regarding door hardware at the main entry/exit.
|
Print Occupancy Form | | | 4/4/2011 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/4/2011 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/4/2011 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 3/24/2011 | | 3/31/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | | | 3/31/2011 | | PASS |
Tim L. Woodard
|
|
|
Tim Woodard
|
1st review completed | | | 3/31/2011 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/31/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 3/31/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 3/31/2011 | | DONE |
|
|
|
|
Telephone call | | | 3/31/2011 | | DONE |
|
|
|
left vm for sara - permit ready
|
Permit Ready to Issue | | | 3/31/2011 | | DONE |
|
|
|
|
Application received | | 3/24/2011 | 3/24/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/24/2011 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/24/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Addressing | 3/24/2011 | | 3/24/2011 | | PASS |
Terry Records
|
|
|
|