Second Notice | | 6/24/2011 | 6/28/2011 | | DONE |
Christina Prado
|
|
|
faxed 6-28-11
|
First Notice | | 6/10/2011 | 6/14/2011 | | DONE |
|
|
|
|
Permanent Occupancy | | | 5/31/2011 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 5/26/2011 | 5/27/2011 | 5/27/2011 | P | PASS |
Mike Jordan
|
|
|
After 1 please call 20min prior---Gil Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 5/26/2011 | 5/26/2011 | 5/26/2011 | P | PASS |
Forrest France
|
|
|
Life safety inspection passed. Fire extinguisher posted as discussed.
|
Override - Parcel Holds | | | 5/26/2011 | | |
|
|
|
|
BLD-Framing/Rough-in | 5/12/2011 | 5/13/2011 | 5/13/2011 | A | PASS |
Jim Storey
|
|
|
Ceiling Grid inspection please-Gill--Please call prior to inspection Phone #: ###-####
|
BLD-Framing/Rough-in | 4/21/2011 | 4/22/2011 | 4/22/2011 | A | PASS |
Jim Storey
|
|
|
GALE Phone #: ###-####
|
BLD-Framing/Rough-in | 4/21/2011 | 4/21/2011 | 4/21/2011 | P | DEFR |
Jim Storey
|
|
|
GALE Phone #: ###-#### ele failled
|
Issue PAID IN FULL permit | | | 4/21/2011 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 3/29/2011 | | 4/20/2011 | | PASS |
Sam Zahorka
|
|
|
|
Routing - FIRE | 4/19/2011 | | 4/20/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans. However, an error occurred when attempting to attach the PDF report into the case documents. The following message occurred: path:L:\PRMSYS\DOCUMENT\201104\BLD11005.81\ could not be generated.
|
1st review completed | | | 4/20/2011 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - PLAN CHECK | 4/20/2011 | | 4/20/2011 | | PASS |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 4/20/2011 | | DONE |
Christina Prado
|
|
|
Received two copies of plans A2.00. Inserted by Arch Rep. Routed back to Sam Z for review
|
Case Summary (BLD) | | | 4/20/2011 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/20/2011 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 4/20/2011 | | DONE |
Tisha Gallop
|
|
|
|
Override - Parcel Holds | | | 4/20/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 4/20/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 4/20/2011 | | DONE |
Tisha Gallop
|
|
|
called Chris Anderson and told him permit is ready, fees, need GC form and Plumbing initial value.
|
Routing - PLAN CHECK | 4/4/2011 | | 4/19/2011 | | FAIL |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 4/19/2011 | | DONE |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 4/6/2011 | | DONE |
|
|
|
|
Routing - PLUMBING | 4/1/2011 | | 4/4/2011 | | PASS |
Bill VanDegrift
|
|
|
approval of these plans with out an engineer is for this project only.
|
Routing - PUBLIC WORKS | 3/29/2011 | | 4/1/2011 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Environmental | 3/31/2011 | | 4/1/2011 | | PASS |
Walt Baumgartner
|
|
|
No grease abatement required at this time.
|
Routing PW Sewer Rating | 3/31/2011 | | 3/31/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 3/30/2011 | | 3/30/2011 | | PASS |
April Wing
|
|
|
|
Pending Assignment by JCB | 3/28/2011 | | 3/29/2011 | | DONE |
Jason Blais
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/28/2011 | | DONE |
Christina Prado
|
|
|
|
Override - Parcel Holds | | | 3/28/2011 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/28/2011 | | DONE |
Christina Prado
|
|
|
|
Application received | | 3/28/2011 | | | |
|
|
|
|