BLD-Final | 5/27/2011 | 5/31/2011 | 5/31/2011 | A | PASS |
Dave Hannah
|
|
|
Jody Phone #: ###-####
|
DOC - Permit Finaled | 5/31/2011 | 5/31/2011 | 5/31/2011 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 4/14/2011 | 4/15/2011 | 4/15/2011 | A | PASS |
Dave Hannah
|
|
|
Kevin Phone #: ###-####
|
BLD-Footing | 4/7/2011 | 4/7/2011 | 4/7/2011 | P | PASS |
Dave Hannah
|
|
|
kevin Phone #: ###-####
|
Routing Walk-In (PW Hillside) | 4/5/2011 | 4/5/2011 | 4/5/2011 | P | PASS |
Susan Riggs
|
|
|
No footing subgrade inspection required.
|
Routing Walk-In (Zoning) | 4/5/2011 | 4/5/2011 | 4/5/2011 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 4/5/2011 | 4/5/2011 | 4/5/2011 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 4/5/2011 | 4/5/2011 | 4/5/2011 | | PASS |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 4/5/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/5/2011 | | |
|
|
|
|
1st review completed | | | 4/5/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/5/2011 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/5/2011 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | 4/5/2011 | | | |
|
|
|
|