Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD11-00669
StatusFinaled
Name PETRA INC
Site Address 5493 E WARM SPRINGS AVE
Project NameRIVERSTONE INTERNATIONAL SCHOO
Customer Number 
ePlanReviewYes
Description
Riverstone International High School - Addition and Remodel - To construct a 1,010 square foot, one story, wood framed classroom addition on the northwest side of an existing 5,000 square foot school building; and to construct a 1,080 square foot roof covered walkway along the entire south side of the building. To remodel the existing building by constructing new interior partitions to divide existing Community Room into two new class rooms and an egress corridor to connect to the new egress corridor at the new addition. To demo and remove the interior partition between the existing office and reception/lobby area to increase the reception/lobby area. To add a new interior partition to divide the existing Faculty Room into two 100 square foot offices. To relocate the entry door to Classroom 119 and to add a new exterior egress door at the east exterior wall of Classroom 109. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 12/15/201112/21/2011 DONE
First Notice 11/12/201112/5/2011 DONE
Permanent Occupancy  11/2/2011 DONE
DetailsBarbara Stitt
PubWorks Occupancy Approval11/1/201111/1/201111/1/2011 DONE
DetailsTiffany Lowery
Print Occupancy Form  11/1/2011  
BLD-Final10/21/201110/21/201110/28/2011PPASS
DetailsDave Hannah
Per 410
FIRE-Conference10/21/201110/21/201110/21/2011PDONE
DetailsForrest France
Regarding finals.
FIRE-Final Inspection10/20/201110/20/201110/20/2011PPASS
DetailsForrest France
Fire life safety finaled. Inspection passed, signature card not available on site.
FIRE-Final Inspection8/19/20118/22/20118/23/2011ANR
DetailsForrest France
Chris Jackson Phone #: ###-####
BLD-Final8/18/20118/19/20118/23/2011PFAIL
DetailsDave Hannah
chris Phone #: ###-#### needs fire finals first
Zoning Approval8/22/20118/22/20118/22/2011 DONE
DetailsAndrea Tuning
BLD-Other8/8/20118/8/20118/8/2011PPASS
DetailsDave Hannah
ceiling grid insp// Jerry Phone #: ###-####
BLD-Energy code compliance7/12/20117/13/20117/13/2011PPASS
DetailsDave Hannah
jerry Phone #: ###-####
BLD-Framing/Rough-in7/11/20117/12/20117/12/2011APART
DetailsDave Hannah
Jerry Phone #: ###-#### ok to insulate add one more 7 1/2 lvl over windows finish bolting seal plate add kickers to walls fire block furred out wall
BLD-Framing/Rough-in7/5/20117/6/20117/6/2011PPART
DetailsJim Storey
Jerry Phone #: ###-#### exterior ok to cover/ interior ok to oneside.
BLD-Foundation6/10/20116/13/20116/13/2011PFAIL
DetailsDave Hannah
stem wall//Jerry Phone #: ###-#### elevation of ftg and wall not to plan
BLD-Footing6/9/20116/10/20116/10/2011APASS
DetailsDave Hannah
Jerry Phone #: ###-####
Issue PAID IN FULL permit  6/1/2011 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/23/2011 DONE
DetailsJohn Menard
Print Occupancy Form  5/23/2011 DONE
Permit Ready to Issue  5/23/2011 DONE
DetailsTisha Gallop
Telephone call  5/23/2011 DONE
DetailsTisha Gallop
called Erstad Arch and told Teegan permit is ready, fees and need ACHD; Teegan said Brian no longer rep. for this project, new rep. from Erstad Arch. is Richard same phone number.
Routing Off Site - STRUCTURAL5/20/2011 5/23/2011 PASS
DetailsJohn Menard
Received letter from consulting structural engineer approving final structural revisions. JCM
Routing - PLAN CHECK4/29/2011 5/23/2011 PASS
DetailsJohn Menard
Plan assigned to (JCM)4/6/2011 5/23/2011 PASS
DetailsJohn Menard
Plan resubmittals received  5/20/2011 DONE
DetailsChristina Prado
Received three sets of plans S4.0 & S5.0. Also received three sets of structural calcs. Two sets inserted by arch. rep. the third taken to John for outside structural review.
Telephone call  5/20/2011 DONE
DetailsChristina Prado
called action couriers for pick up
Plan resubmittals requested  5/18/2011 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting an additional revision. JCM
Routing Off Site - STRUCTURAL5/6/2011 5/17/2011 FAIL
DetailsJohn Menard
Received letter from consulting engineer requesting one additional resubmittal item. JCM
Plan resubmittals received  5/6/2011  
DetailsChristina Prado
Received three sets of plans S5.0. Inserted by arch rep and routed to John Menard for review
Telephone call  5/6/2011 DONE
DetailsChristina Prado
Called Action Couriers for pick-up
Plan resubmittals received  5/5/2011 DONE
DetailsChristina Prado
Received two copies of plans A1.01, A1.11, A2.01, A2.11, A2.31, A3.11, A4.11, A6.11 and MG-2 Inserted by Arch Rep; Received one copy of response letter; one copy of request letter; one copy of plan review report; Three copies of Form 310; And three copies of Structural Calcs. Routed to John Menard for review
Route to Impact Fee Review4/28/20115/3/20114/29/2011 PASS
DetailsCindy M. Gould
Routing - FIRE4/28/20114/28/20114/29/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  4/29/2011 FAIL
Failed Structural, Plan Check
Plan resubmittals requested  4/28/2011 DONE
DetailsJohn Menard
E-mailed the architect requesting revisions. JCM
Routing - PLAN CHECK4/15/2011 4/28/2011 FAIL
DetailsJohn Menard
Routing Off Site - STRUCTURAL4/6/2011 4/19/2011 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  4/19/2011 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing - PLANNING4/14/2011 4/15/2011 PASS
DetailsSarah Schafer
Approved per DRH11-00055. DR (Either Andrea Tuning or Sarah Schafer) will need to do the inspection.
Routing PW Drainage4/11/2011 4/14/2011 PASS
DetailsBrian Murphy
Routing - Erosion and Sediment4/14/2011 4/14/2011 PASS
DetailsSteven Webb
ESC plan wavier is approved according to the ESC Permit Conditions. ESC11-00185
Routing - PUBLIC WORKS4/8/2011 4/14/2011 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating4/11/2011 4/11/2011 PASS
DetailsConnie Baumgartner
Routing - Addressing4/8/2011 4/8/2011 PASS
DetailsTerry Records
Routing - PLANNING Land Div4/6/2011 4/8/2011 PASS
DetailsTodd Tucker
Plans ACCEPTED BY PLAN TECH  4/6/2011 DONE
DetailsChristina Prado
Intake Approval  4/6/2011 PASS
DetailsCarl Westfall
Recd Pcfee & Taken To Pln CK  4/6/2011 DONE
DetailsChristina Prado
Pending Assignment by JCM4/6/2011 4/6/2011 DONE
DetailsJohn Menard
Telephone call  4/6/2011 DONE
DetailsChristina Prado
Called Action Couriers for pick up 3:15
Application received 4/6/2011