Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD11-00693
StatusFinaled
Name HC COMPANY INC
Site Address 11311 W CHINDEN BLVD
Project NameHP BLD 7
Customer Number 
ePlanReviewNo
Description
(HP BLD 7 LAB RELOCATION) 8-19-11 PLAN MOD - MODIFY SIZE OF LIFE TEST #1 & RELOCATED LIFE TEST #2 LAB LAYOUT; ADD NEW OVERHEAD DOOR AND SUPPORT STRUCTURE INTO LAB TEST CHAMBER; MODIFY SUPPORT UTILITIES TO SERVE NEW LAYOUT. DRS Remodel of an existing 8,000 sq. ft. floor area located in the SW quadrant of HP Building #7 for relocation of equipment testing facilities and testing chambers from other buildings in HP Complex and an addition of 288 sq. ft. extension of Package Test Lab 104. Work includes select demolition; concrete foundations for new addition, vibration equipment pit and lifting crane in PTL 104; new mechanical mezzanine and support structure; exterior exit door, landing, stairs and railings; relocated doors and new walls to create Life Test #1, Life Test #2 and NN Room; suspended ceiling grid system in remodeled areas; lighting fixtures, controls, interior finishes; modification of HVAC, electrical, plumbing, fire sprinkler and alarm systems. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  6/25/2012 DONE
per 425 final on 12-15-11
BLD-Final12/15/201112/15/201112/15/2011PPASS
DetailsDave Hannah
Jeff Phone #: ###-####
BLD-Final12/15/201112/15/201112/15/2011ACANC
DetailsDave Hannah
Jeff Phone #: ###-####
BLD-Final12/15/201112/15/201112/15/2011PPASS
DetailsDave Hannah
Jeff Tonkin Phone #: ###-####
BLD-Final12/14/201112/14/201112/15/2011PCANC
DetailsDave Hannah
Jeff Phone #: ###-####
FIRE-Final Inspection12/13/201112/14/201112/14/2011APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection11/22/201111/28/201111/28/2011AFAIL
DetailsTroy Cobbley
Provide exit signs and emergency lighting as shown on the city approved plans.
FIRE-Final Inspection10/25/201110/25/201110/26/2011PNR
DetailsForrest France
Reopen Permit (ISS)  9/9/2011 DONE
DetailsChristina Prado
Plan assigned to (DRS)8/22/20118/22/20119/1/2011 PASS
DetailsDan Stuart
Routing - PLAN CHECK8/22/2011 9/1/2011 PASS
DetailsDan Stuart
Plans indicated by clouding as having changes were inserted into plans and reviewed. Plans to permit desk to issue.
Override - Parcel Holds  9/1/2011  
Override - Parcel Holds  9/1/2011  
Print Pending Permit.LaserJet4  9/1/2011  
Case Summary (BLD)  9/1/2011  
PLANS/APPL TAKEN TO FRONT DESK  9/1/2011 PASS
DetailsDan Stuart
Plan Mod review completed.
Inspection Record Card- Bld  9/1/2011 DONE
Override - Parcel Holds  9/1/2011  
Override - Parcel Holds  9/1/2011  
Permit Ready to Issue  9/1/2011  
Telephone call  9/1/2011 DONE
9-1-11 called left message for John permit ready and fee given ///dld
Plan resubmittals received  8/19/2011 DONE
Received two copies of sheets S-7030, S7302, A-70D100, A-70D101, A-70100, A-70101, A-70102, A-72100, A-76100, EP-70110, EP-70120, EP-70130, EC-70110, EL-70110, M-70100, MP-70100, that had changes clouded by the architect, John Reseigh, and two different sets of structural sketch details - SK-1(Sheet S-70100), SK-2 (Sheet S-70301), SK-3 (Sheet S-70501) SK-1 (Sheet S-70201), SK-2 & (3)SK-3 (Sheet S-70501)
dated 6/23/11.
Plan Modification Accepted  8/19/2011  
Plan Modification Accepted for BLD11-00693 as interior lab space was reduced in size. Pages affected are S00001,S00002,S70100,S70101,S70201,S70301,S70302,S70501,S70502,A70D100,A70D101,A70100,A70101,A70102,A72100,A76100 sent to Dan S
BLD-Other7/14/20117/15/20117/15/2011APASS
DetailsJim Storey
ceiling grid
BLD-Other7/15/20117/15/20117/15/2011APASS
DetailsJim Storey
ceilling in live test room and ceilling in reach in chamber ok to cover.
BLD-Other7/14/20117/14/20117/14/2011PCANC
DetailsDave Hannah
ceiling grid
BLD-Framing/Rough-in7/13/20117/14/20117/14/2011APART
DetailsDave Hannah
framing for roll up door ok to cover
FIRE-Sprinkler Rough-in7/7/20117/7/20117/7/2011PPART
DetailsForrest France
Preliminary overhead fire sprinkler inspection at the life test room 1 completed.
BLD-Other7/5/20117/5/20117/5/2011PPASS
DetailsJim Storey
ceilling grid west of dock. ok
BLD-Conference6/24/20116/24/20116/27/2011PPASS
DetailsDave Hannah
ok to cover walls ext section south end and new section in side
BLD-Framing/Rough-in6/1/20116/1/20116/2/2011PPASS
DetailsDave Hannah
BLD-Other5/25/20115/25/20116/2/2011PPASS
DetailsDave Hannah
ceiling grid
Issue PAID IN FULL permit  5/10/2011 DONE
DetailsBarbara Stitt
Routing - PLAN CHECK4/29/2011 5/5/2011 PASS
DetailsDan Stuart
Resubmittals of 5/4/11 inserted into plans. Plan revfiew comments attached to plans and redlined. Alternate approval approved for allowed use of 2006 IBC, ASCE 7-05 IN PLACE OF 2009 IBC , ASCE 7-05 FOR LATERAL AND SEISMIC DESIGN DATA AS BOTH REFERENCE THE SAME STANDARD. Copy of alternate attached to building permit..
Print Pending Permit.LaserJet4  5/5/2011  
Case Summary (BLD)  5/5/2011  
PLANS/APPL TAKEN TO FRONT DESK  5/5/2011 PASS
Approved with attached comments as part of reviewed plans.
Inspection Record Card- Bld  5/5/2011 DONE
Telephone call  5/5/2011 DONE
t/c w john - permit ready and fees given
Permit Ready to Issue  5/5/2011 DONE
Details
Plan assigned to (DRS)4/8/2011 5/5/2011 PASS
DetailsDan Stuart
Plan resubmittals received  5/4/2011  
Received 2 copies of plan review respone comments, 2 copies of structural calcs, 2 copies sheets A-00101, A-01100, S-00001, S-70100, S-70201, S-70301, S-70503, A-70100, A-70101, A-70102, A-72100, A-76100, M-00100, A-01100, M-70100, M-76100, MD-70100, MP-00100, MP-70100, MP-70110, MP-76100, MPD-70110, E-70100, EP-70100, EP-70110, EP70130, EP-70200, EC-70110, EL-70110, EL-70120, E-76110, E-76120, E-76130, E-76140, E-76150, P-00100, P-70100 all inserted into plans by architects office and returned to Dan Stuart's desk
Route to Impact Fee Review4/27/20115/2/20114/29/2011 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - FIRE4/27/20114/27/20114/29/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  4/29/2011 FAIL
Failed Plan Check
Routing - PLAN CHECK4/19/2011 4/27/2011 FAIL
DetailsDan Stuart
Resubmittals required. Copy of plan review report e-mailed to john Reseigh, CH2M Hill. Plans routed to fire code analyst.
Routing - Design Review4/18/2011 4/19/2011 PASS
DetailsSarah Schafer
Sarah Schafer - minor exterior change
Routing - MECHANICAL4/14/2011 4/18/2011 PASS
DetailsTroy James
Routing - PUBLIC WORKS4/12/2011 4/14/2011 PASS
DetailsConnie Baumgartner
Routing PW Environmental4/14/2011 4/14/2011 PASS
DetailsWalt Baumgartner
reviewed by Mike Hunter, Pretreatment group
Routing PW Sewer Rating4/14/2011 4/14/2011 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment4/14/2011 4/14/2011 PASS
DetailsSteven Webb
ESC plan waiver is approved according to the ESC Permit Conditions. ESC11-00198
Routing - Addressing4/13/2011 4/13/2011 PASS
DetailsApril Wing
Intake Approval  4/12/2011 PASS
DetailsJason Blais
Received ESC application and plan waiver letter.
Plan resubmittals received  4/11/2011 DONE
DetailsTisha Gallop
received ESC application and waiver request letter; taken to JCB.
Intake Approval  4/8/2011 FAIL
DetailsJason Blais
Needs ESC Application and Plan Waiver Letter to be submitted. Verified with Steve Webb. Emailed and left message for architect.
Pending Assignment by JCB4/7/2011 4/8/2011 DONE
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  4/7/2011 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  4/7/2011 DONE
DetailsChristina Prado
Application received 4/7/2011