Permit Information
Permit NumberBLD11-00704
StatusFinaled
Name HN DEVELOPMENT SERVICES LLC
Site Address 321 S 8TH ST
Project NameBODO BLDG #4
Customer Number 
ePlanReviewNo
Description
(FIVE GUYS BURGER AND FRIES - BODO BUILDING #4 - 1ST STORY) (6-13-11 PLAN MODIFICATION TO CHANGE THE ROUTING AND SHAFT SYSTEM FOR THE GREASE DUCT. INSTEAD OF PENETRATING A 2-HR FIRE WALL, THE GREASE DUCT WILL BE KEPT INSIDE THE BUILDING UNTIL IT PENETRATES THE ROOF. IN LIEU OF USING A FACTORY-BUILT GREASE DUCT ASSEMBLY THAT INCORPORATES INTEGRAL ENCLOSURE MATERIALS, A FIELD-APPLIED 2 LAYER DUCT WRAP SYSTEM WILL BE INSTALLED ON THE OUTSIDE OF THE GREASE DUCT. FOR MUCH OF ITS LENGTH, THE ENTIRE ASSEMBLY WILL BE ENCLOSED WITHIN A 1-HR SHAFT. LISTING INFORMATION FOR THE 2 LAYER DUCT WRAP SYSTEM AND FOR THE 1-HR SHAFT SHALL BE PROVIDED TO THE STRUCTURAL INSPECTOR. THE 2 LAYER DUCT WRAP SYSTEM IS REQUIRED TO REDUCE CLEARANCES AND THE 1-HR SHAFT IS REQUIRED TO AVOID A THROUGH PENETRATION FIRE STOP SYSTEM.) Fire sprinklers used for building area increase and for fire area. To convert an existing 2,600 square foot tenant space into a restaurant. Work is to include 2 restrooms accessible to the disabled, interior nonbearing walls, suspended acoustical ceilings, 2 grease hoods, a 2-hr grease duct that penetrates a 2 hour fire wall, kitchen equipment, and interior finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 8/4/20118/25/2011 DONE
DetailsBarbara Stitt
First Notice 6/30/20117/25/2011 DONE
DetailsChristina Prado
Mailed 7/25/11
BLD-Framing/Rough-in6/20/20116/21/20116/24/2011PPASS
DetailsDave Hannah
kery Phone #: ###-####
Permanent Occupancy  6/20/2011 DONE
DetailsBarbara Stitt
FIRE-Final Inspection6/16/20116/17/20116/17/2011APASS
DetailsForrest France
Fire life safety passed after finished corrections.
BLD-Final6/16/20116/17/20116/17/2011PPART
DetailsTom Arcoraci
Shane Phone #: ###-#### needs mech and zoning sign offs then ok for final
CHANGE STATUS TO (ISS)  6/16/2011 DONE
DetailsBarbara Stitt
(F) Reprint permit  6/16/2011 DONE
DetailsBarbara Stitt
BLD-Other6/13/20116/14/20116/14/2011APART
DetailsDave Hannah
grid insp//shane ###-#### ok to cover ceiling after all other trades ok
Plan assigned to (CJW)6/8/20116/8/20116/13/2011 PASS
DetailsCarl Westfall
Routing - PLAN CHECK6/8/2011 6/13/2011 PASS
DetailsCarl Westfall
Plan modification approved. See revised Sheets M1.1, M1.2, and M2.1.
PLANS/APPL TAKEN TO FRONT DESK  6/13/2011 DONE
Print Occupancy Form  6/13/2011 DONE
DetailsChristina Prado
Permit Ready to Issue  6/13/2011 DONE
DetailsBarbara Stitt
Telephone call  6/13/2011 DONE
DetailsBarbara Stitt
Called and left a message for Curtis that plan mod is ready & fees due on 6-13-11 @ 10:05am//BAS
BLD-Conference6/7/20116/8/20116/8/2011APEND
DetailsDave Hannah
Meet Dixie at 10:00 contractor will resubmit plans for relocation of hood ducting
Plan Modification Accepted  6/8/2011 DONE
DetailsTisha Gallop
Plan Modification accepted for Bld11-00704 (Five Guys Burger and Fries) for new grease duct design; submitted on plan sheets M1.1, M1.2, M2.1; routed to Carl Westfall.
FIRE-Conference6/7/20116/7/20116/7/2011PDONE
DetailsForrest France
On site visit with contractor regarding status of project related fire alarm, sprinkler and hood suppression permits.
BLD-Framing/Rough-in6/2/20116/3/20116/3/2011APASS
DetailsDave Hannah
bill Shane will be there to let you in Phone #: ###-####
Print Occupancy Form  5/27/2011 DONE
Issue PAID IN FULL permit  5/23/2011 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/20/2011 DONE
Permit Ready to Issue  5/20/2011 DONE
Telephone call  5/20/2011 DONE
5-20-11 gave Shane a perint out of the fee amount ///dld
Plan assigned to (CJW)4/12/2011 5/20/2011 PASS
DetailsCarl Westfall
Routing - PLANNING5/19/2011 5/20/2011 PASS
DetailsJosh Wilson
OK per CZC11-00116
Routing - PLAN CHECK5/20/2011 5/20/2011 DONE
DetailsCarl Westfall
Case Summary (BLD)  5/19/2011 DONE
DetailsTisha Gallop
Routing - PLAN CHECK5/4/2011 5/19/2011 PASS
DetailsCarl Westfall
Drawings approved after resubmittal review.
Plan resubmittals received  5/17/2011 DONE
DetailsTisha Gallop
received response from architect, response from engineer, calculations, mech/plmb response, revised cert of value to split out interior demo, application and cert of value for int. demo., and two copies of plan sheets A2a, A4, A6, A9, A10, M1.1, M1.2, M2.1, P2.1, E01, E02, E11; taken to Carl Westfall.
Route to Impact Fee Review5/3/20115/6/20115/9/2011 PASS
DetailsCindy M. Gould
Tenant remodel no impact fees
1st review completed  5/4/2011 DONE
Routing - PLAN CHECK5/3/2011 5/4/2011  
Routing - PLANNING5/4/2011 5/4/2011 FAIL
DetailsJosh Wilson
New air intake grill at 8th street, sidewalk seating, and exposed grease duct. Zoning Certificate required. Applicant contacted by phone. JGW 5/4/11
Routing - FIRE5/3/20115/3/20115/3/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLAN CHECK4/18/2011 5/3/2011 FAIL
DetailsCarl Westfall
The IBC plan review was started on April 28, 2011 and was finished on May 3, 2011. Revised drawings were required. See the plan review report.
Routing - PLUMBING4/15/2011 4/18/2011 PASS
DetailsDaryl Spivey
Separate backflow device needed prior to filters on filtered water system.
provide backflow protection on equipment as needed.
Per plans and 2003 UPC
Routing - Erosion and Sediment  4/15/2011 PASS
DetailsSteven Webb
ESC plan waiver is approved according to the ESC Permit Conditions. ESC11-00194
Routing - PUBLIC WORKS4/12/2011 4/14/2011 PASS
DetailsConnie Baumgartner
Completated date was not filled in. Date based on Connie's signature on the drawings.
Routing PW Sewer Rating4/13/2011 4/14/2011 PASS
DetailsConnie Baumgartner
Routing PW Environmental4/13/2011 4/13/2011 PASS
DetailsWalt Baumgartner
Proposed grease waste line from kitchen shall connect to existing grease interceptor shared with second tenant. Grease interceptor shall be maintained in accordance with City food service fat/oil/grease best management practices guidance.
Routing - Addressing4/13/2011 4/13/2011 PASS
DetailsApril Wing
Pending Assignment by JCB4/11/2011 4/12/2011 DONE
DetailsJason Blais
Application received 4/8/20114/8/2011 DONE
DetailsChristina Prado
Plans ACCEPTED BY PLAN TECH  4/8/2011 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  4/8/2011 DONE
DetailsChristina Prado