Second Notice | | 10/2/2011 | 10/6/2011 | | DONE |
Christina Prado
|
|
|
Mailed 10-06-11
|
First Notice | | 9/9/2011 | 9/22/2011 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 9/1/2011 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 8/30/2011 | | DONE |
|
|
|
|
BLD-Final | 7/29/2011 | 8/1/2011 | 8/1/2011 | P | PASS |
Jim Sly
|
|
|
Bruce Phone #:###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 7/29/2011 | 8/1/2011 | 8/1/2011 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 7/28/2011 | 7/29/2011 | 7/29/2011 | P | PART |
Jim Storey
|
|
|
Del Phone #: ###-#### need handrails 12 inches top and bottom both sdes/ keyed dead bolt and sign front door.
|
FIRE-Final Inspection | 7/28/2011 | 7/29/2011 | 7/29/2011 | A | FAIL |
Troy Cobbley
|
|
|
Del Phone #: ###-####. I left a message on the contacts phone. Arrived at the site 20 minutes later. No one there and doors locked. No inspection was performed.
|
Telephone call | | | 7/6/2011 | | DONE |
Sam Zahorka
|
|
|
Received a telephone call from the contractor Dell. He was inquiring about parking and signage for accessibility. I informed him this was a fire damage permit and no occupancy is allowed under this permit. A new permit is required for occupancy once a tenant is ready to occupy the building because no prior occupancy permit was available. A review for accessible parking and signage would be done at that time. SRZ
|
Telephone call | | | 7/6/2011 | | DONE |
Sam Zahorka
|
|
|
Called the architect, Oscar and informed him about the telephone call with the contractor inquiring about accessible parking and signage. I explained a new permit for occupancy is still required and would be routed to Planning and Zoning for parking requirements. When the new permit is submitted a review for accessible signage would be part of the review at that time also. No tenant information was available from the owner. This permit was only to repair fire damage. The architect said he would pass the information onto his client Mr. Nyborg.
|
BLD-Energy code compliance | 6/15/2011 | 6/16/2011 | 6/16/2011 | A | PASS |
Mike Jordan
|
|
|
dale Phone #: ###-####
|
BLD-Framing/Rough-in | 6/16/2011 | 6/16/2011 | 6/16/2011 | A | PASS |
Mike Jordan
|
|
|
dale Phone #: ###-####
|
BLD-Framing/Rough-in | 5/31/2011 | 6/1/2011 | 6/1/2011 | A | PART |
Mike Jordan
|
|
|
del Phone #: ###-#### - please call 1/2 hr prior . OK to insulate. Needs to make guards at 42".
|
BLD-Conference | 5/4/2011 | 5/5/2011 | 5/5/2011 | P | DONE |
Mike Jordan
|
|
|
call 30 min to meet//Del Johnson ###-####
|
Issue PAID IN FULL permit | | | 5/2/2011 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 4/26/2011 | | 4/29/2011 | | FAIL |
Sam Zahorka
|
|
|
Resubmittals received with corrections. Minor modification/correction for handrail detailing needed. Called the architect and he will email me a revised handrail detail and I offered to paste onto plans to expedite permit issuance. Waiting for email detail correction.
|
Plan resubmittals received | | | 4/29/2011 | | DONE |
|
|
|
4-29-11 received 1 letter of transmittal and 2 copies of sheet A2.0 taken to Sam Z.
|
Routing - PLAN CHECK | 4/29/2011 | | 4/29/2011 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/29/2011 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 4/29/2011 | | DONE |
|
|
|
|
Telephone call | | | 4/29/2011 | | DONE |
Christina Prado
|
|
|
Called Lary and advised fees due.
|
Permit Ready to Issue | | | 4/29/2011 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (SRZ) | 4/8/2011 | | 4/29/2011 | | PASS |
Sam Zahorka
|
|
|
|
Routing - FIRE | 4/21/2011 | | 4/26/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Plan resubmittals received | | | 4/26/2011 | | DONE |
Tisha Gallop
|
|
|
received response and two copies of plan sheet A2.0; taken to Sam Zahorka.
|
1st review completed | | | 4/26/2011 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - PLAN CHECK | 4/15/2011 | | 4/22/2011 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - PUBLIC WORKS | 4/8/2011 | | 4/15/2011 | | PASS |
Connie Baumgartner
|
|
|
Needs new address or Suite #. States $6,000 in plumbing work? I don't see any fixtures though. Demo maybe?
|
Routing PW Sewer Rating | 4/11/2011 | | 4/14/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 4/11/2011 | | 4/11/2011 | | PASS |
Terry Records
|
|
|
Address was changed to 11358 W President Dr from 11350 W President Dr
|
Application received | | 4/8/2011 | 4/8/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/8/2011 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/8/2011 | | DONE |
Tisha Gallop
|
|
|
|
Pending Assignment by JCB | 4/8/2011 | | 4/8/2011 | | DONE |
Jason Blais
|
|
|
|