Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD11-00727
StatusFinaled
Name HEINZ BUILT HOMES LLC
Site Address 11600 W FAIRVIEW AVE
Project NameCOLTRIN BUILDING
Customer Number 
ePlanReviewNo
Description
(IDAHO FITNESS FACTORY) Remodel to an existing 3,980 sq. ft. space changing occupancy from retail to an assembly fitness center per approved plans. Work to include: interior demolition per plans; construct new interior non-bearing wall partitions to create a Group room, office, kids room, cardio area, womens and mens locker rooms, and work out area; install a new dual height (hi-lo) accessible drinking fountain; related interior finishes in compliance with chapter 8 of the 2009 IBC; and plumbing, electrical work. All work per the approved plans, attached plan review report, and adopted codes. The existing envelope is not being affected by this permit. NOTE: This building is fully fire sprinklered for area increase and story increase. Any alterations or modifications to the fire sprinkler system shall be per NFPA 13 as regulated by the fire department. A new Certificate of Occupancy with the new occupant load total is to be issued when completed and approved prior to tenant occupying this space. **SRZ** 6-9-11 PER GC NO CHANGE IN VALUE ///DLD
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 6/5/20116/13/2011 DONE
First Notice 5/14/20115/26/2011 DONE
Plan Reviewer's activity  5/6/2011 DONE
DetailsSam Zahorka
Spoke with the structural inspector Jim Sly. An existing drinking fountain/plumbing exits and wil be provided. He stated the existing mechanical system is capable to provide the required ventilation for the change of occupancy upon inspection of T.I. Permanent Occupancy card signed after conversation with Mr. Sly. SRZ
FIRE-Final Inspection5/4/20115/4/20115/4/2011PPASS
DetailsTroy Cobbley
life safety passed
BLD-Final5/4/20115/4/20115/4/2011PPASS
DetailsJim Sly
Cory Coltrin ###-####
OK for Perm Occ. No plumbing or mechanical work done for the TI.
Permanent Occupancy UNPAID FEE  5/4/2011 DONE
DetailsBarbara Stitt
Plan assigned to (SRZ)4/13/2011 4/29/2011 PASS
DetailsSam Zahorka
Routing - FIRE4/27/2011 4/29/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  4/29/2011 FAIL
Failed Plan Check
Routing - PLAN CHECK4/29/2011 4/29/2011 PASS
DetailsSam Zahorka
Case Summary (BLD)  4/29/2011 DONE
DetailsSam Zahorka
Routing - PLANNING4/29/2011 4/29/2011 PASS
DetailsJosh Wilson
Exterior door change. OK per CZC11-00102
Routing - PLAN CHECK4/29/2011 4/29/2011 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  4/29/2011 DONE
DetailsSam Zahorka
Permit Ready to Issue  4/29/2011 DONE
DetailsTisha Gallop
Print Occupancy Form  4/29/2011 DONE
DetailsTisha Gallop
Issue PAID IN FULL permit  4/29/2011 DONE
DetailsTisha Gallop
Plan resubmittals received  4/28/2011 DONE
DetailsChristina Prado
Received two set of plans A1-100, A1-200, A1-201, A1-300, A1-400, A1-500 and E-1. Routed to Sam Z for review
Case Summary (BLD)  4/27/2011 DONE
DetailsSam Zahorka
Routing - PLAN CHECK4/15/2011 4/27/2011 FAIL
DetailsSam Zahorka
Corrections requested.
Routing - Addressing4/14/2011 4/15/2011 PASS
DetailsTerry Records
Please route back to Building Plan Review when finished. SRZ
(F) Reprint permit  4/14/2011 DONE
Routing - PLANNING4/13/2011 4/13/2011 PASS
DetailsCody Riddle
Cody Riddle; Use allowed, required parking provided.
Recd Pcfee & Taken To Pln CK  4/13/2011 DONE
DetailsBarbara Stitt
Pending Assignment by JCB4/13/2011 4/13/2011 DONE
DetailsJason Blais
Application received 4/12/20114/12/2011 DONE
DetailsBarbara Stitt
Intake Approval  4/12/2011 PASS
DetailsCarl D Madsen
Plans ACCEPTED BY PLAN TECH  4/12/2011 DONE
DetailsBarbara Stitt