Third Notice | | 8/10/2011 | 7/28/2011 | | DONE |
|
|
|
|
Third Notice | | 7/3/2011 | 7/27/2011 | | DONE |
|
|
|
mailed to GC and faxed to applicant
|
Second Notice | | 6/23/2011 | 6/28/2011 | | DONE |
|
|
|
|
First Notice | | 6/3/2011 | 6/13/2011 | | DONE |
|
|
|
|
FIRE-Final Inspection | 5/24/2011 | 5/24/2011 | 5/24/2011 | P | PASS |
Forrest France
|
|
|
|
BLD-Final | 5/23/2011 | 5/24/2011 | 5/24/2011 | P | PASS |
Jim Storey
|
|
|
|
Permanent Occupancy | | | 5/24/2011 | | DONE |
Tisha Gallop
|
|
|
n/a for electrical and plumbing per Jim Story, see occupancy sign off card
|
FIRE-Final Inspection | 5/20/2011 | 5/23/2011 | 5/23/2011 | A | PASS |
Forrest France
|
|
|
Correction notice items verified for completion. Fire life safety finaled.
|
BLD-Final | 5/20/2011 | 5/23/2011 | 5/23/2011 | P | PART |
Jim Storey
|
|
|
Paul Phone #: ###-#### ok for temp occ.
|
Zoning Approval | 5/23/2011 | 5/23/2011 | 5/23/2011 | | DONE |
Josh Wilson
|
|
|
Ok per DRH11-00028
|
FIRE-Final Inspection | 5/19/2011 | 5/20/2011 | 5/20/2011 | A | FAIL |
Forrest France
|
|
|
Correction items include door hardware, exit signs, and signage at the main entry. Remainder of inspection okayed. Conference with tenant regarding occupancy approval process.
|
BLD-Final | 5/18/2011 | 5/19/2011 | 5/19/2011 | A | NR |
Jim Storey
|
|
|
paul Phone #: ###-#### (said he didn't need fire l/s? and no electrical or plumbing?) need fire final.
|
OVERRIDE | | | 5/18/2011 | | |
|
|
|
|
OVERRIDE | | | 5/18/2011 | | |
|
|
|
|
BLD-Framing/Rough-in | 5/2/2011 | 5/2/2011 | 5/2/2011 | P | PASS |
Jim Storey
|
|
|
pete Phone #: ###-####
|
Permit Ready to Issue | | | 4/26/2011 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/26/2011 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 4/26/2011 | | DONE |
Christina Prado
|
|
|
|
MISC ACTIONS | | | 4/26/2011 | | DONE |
Christina Prado
|
|
|
Needed GC renewed and Rp. Both given at time of issuance.
|
Plan assigned to (TLW) | 4/12/2011 | | 4/25/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 4/12/2011 | | 4/25/2011 | | PASS |
Tim L. Woodard
|
|
|
Approved w/ out the use of the existing mezzanine. After discussion with the architect a plan modification or a new permit will be approved to address non-compliant mezzanine. TLW
|
1st review completed | | | 4/25/2011 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/25/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - Erosion and Sediment | 4/25/2011 | | 4/25/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 4/25/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 4/25/2011 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/12/2011 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/12/2011 | | DONE |
Christina Prado
|
|
|
|
Application received | | 4/12/2011 | | | |
|
|
|
|