Permit Information
Permit NumberBLD11-00728
StatusFinaled
Name THOMPSONS CUSTOM BUILDING & REMODEL
Site Address 4180 S BROADWAY AVE
Project NameBRETZ RV
Customer Number 
ePlanReviewNo
Description
(BRETZ RV) Permit is to remodel an existing 14,602 square foot office / warehouse building w/ a 2924 square foot storage mezzanine. This building is fully fire sprinklered for area increase. Approval contingent upon adhering to the approved plans on file and plan review report. Work to include: construction of new openings in existing exterior wall, installation of a new accessible parking stall, construction of new landing outside of new exterior door, and finishes in compliance with chapter 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department.**TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 8/10/20117/28/2011 DONE
Third Notice 7/3/20117/27/2011 DONE
mailed to GC and faxed to applicant
Second Notice 6/23/20116/28/2011 DONE
First Notice 6/3/20116/13/2011 DONE
FIRE-Final Inspection5/24/20115/24/20115/24/2011PPASS
DetailsForrest France
BLD-Final5/23/20115/24/20115/24/2011PPASS
DetailsJim Storey
Permanent Occupancy  5/24/2011 DONE
DetailsTisha Gallop
n/a for electrical and plumbing per Jim Story, see occupancy sign off card
FIRE-Final Inspection5/20/20115/23/20115/23/2011APASS
DetailsForrest France
Correction notice items verified for completion. Fire life safety finaled.
BLD-Final5/20/20115/23/20115/23/2011PPART
DetailsJim Storey
Paul Phone #: ###-#### ok for temp occ.
Zoning Approval5/23/20115/23/20115/23/2011 DONE
DetailsJosh Wilson
Ok per DRH11-00028
FIRE-Final Inspection5/19/20115/20/20115/20/2011AFAIL
DetailsForrest France
Correction items include door hardware, exit signs, and signage at the main entry. Remainder of inspection okayed. Conference with tenant regarding occupancy approval process.
BLD-Final5/18/20115/19/20115/19/2011ANR
DetailsJim Storey
paul Phone #: ###-#### (said he didn't need fire l/s? and no electrical or plumbing?) need fire final.
OVERRIDE  5/18/2011  
OVERRIDE  5/18/2011  
BLD-Framing/Rough-in5/2/20115/2/20115/2/2011PPASS
DetailsJim Storey
pete Phone #: ###-####
Permit Ready to Issue  4/26/2011 DONE
DetailsChristina Prado
CHANGE STATUS TO (ISS)  4/26/2011 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  4/26/2011 DONE
DetailsChristina Prado
MISC ACTIONS  4/26/2011 DONE
DetailsChristina Prado
Needed GC renewed and Rp. Both given at time of issuance.
Plan assigned to (TLW)4/12/2011 4/25/2011 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK4/12/2011 4/25/2011 PASS
DetailsTim L. Woodard
Approved w/ out the use of the existing mezzanine. After discussion with the architect a plan modification or a new permit will be approved to address non-compliant mezzanine. TLW
1st review completed  4/25/2011 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  4/25/2011 DONE
DetailsTim L. Woodard
Routing - Erosion and Sediment4/25/2011 4/25/2011 PASS
DetailsTim L. Woodard
Case Summary (BLD)  4/25/2011 DONE
DetailsTim L. Woodard
Print Occupancy Form  4/25/2011 DONE
Plans ACCEPTED BY PLAN TECH  4/12/2011 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  4/12/2011 DONE
DetailsChristina Prado
Application received 4/12/2011