Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD11-00781
StatusFinaled
Name ESI
Site Address 650 N ARMSTRONG PL
Project NameWinco Foods Records Retention
Customer Number 
ePlanReviewNo
Description
Winco General Office - Records Storage Building - To construct a new 9,365 square foot, one story, masonry and steel framed record storage building and related site improvements. This building is being built on the north side of the existing Winco office building. This building is being structurally designed for a future second floor addition for a storage. This building is fully fire sprinkled. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  11/28/2012 DONE
DetailsTisha Gallop
e-mailed to Mike Dahlberg
Third Notice 3/30/20128/10/2012 DONE
Print Statement  8/10/2012 DONE
DetailsTisha Gallop
e-mailed to Jenay Montana at ESI
Third Notice 3/15/20123/15/2012 DONE
faxed to ESI
Third Notice 2/22/20123/1/2012 DONE
faxed to ESI
Second Notice 2/12/20122/17/2012 DONE
DetailsChristina Prado
faxed 2/17/12
First Notice 1/19/20122/2/2012 DONE
Permanent Occupancy  1/9/2012 DONE
DetailsChristina Prado
BLD-Final10/21/201110/21/201110/21/2011PPASS
DetailsMike Jordan
ok for perm. occ.
BLD-Final10/19/201110/19/201110/19/2011PPART
DetailsMike Jordan
Need final letter from special inspection agency. Everything else ok.
BLD-Final10/18/201110/19/201110/19/2011ACANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Chris Palmer. moved to pm.
FIRE-Final Inspection10/18/201110/19/201110/19/2011APASS
DetailsTroy Cobbley
life safety passed.
FIRE-Final Inspection9/19/20119/19/20119/19/2011PFAIL
DetailsTroy Cobbley
Life safety will be ok to final when the project related fire alarm permit has been passed.
FIRE-Final Inspection9/12/20119/13/20119/13/2011PCANC
DetailsTroy Cobbley
Phone #: ###-#### >> Inspection requested via web by Chris Palmer Inspection cancelled from web by: Chris Palmer
BLD-Final9/12/20119/13/20119/13/2011PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Chris Palmer Inspection cancelled from web by: Chris Palmer
BLD-Final9/9/20119/12/20119/12/2011PNR
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Chris Palmer
FIRE-Final Inspection9/9/20119/12/20119/12/2011PCANC
DetailsTroy Cobbley
Cancel per Chris Palmer
BLD-Final9/6/20119/8/20119/8/2011ANR
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Chris Palmer. Needs fire/life/safety.
Zoning Approval9/8/20119/8/20119/8/2011 PASS
DetailsJosh Wilson
FIRE-Final Inspection9/6/20119/7/20119/7/2011PFAIL
DetailsTroy Cobbley
Project is not ready for a final inspection due to the project related fire alarm permit. Per Ron Amandus, it is ok for Winco to begin moving in the items that are to be stored in this warehouse. No finals will be given until the fire alarm and all related life safety items have passed inspection.
FIRE-Alarm Testing9/6/20119/6/20119/6/2011PCANC
DetailsTroy Cobbley
No fire alarm testing was performed due to no permit for the fire alarm work. Stop work order was posted.
FIRE-Conference9/6/20119/6/20119/6/2011PDONE
DetailsTroy Cobbley
I found fire alarm work being performed without permits. I spoke to Jeremy with Allied General and Chris with ESI about the "stop work order" that I posted. Pictures of the stop work order and the installed devices were taken and sent to the fire alarm plan reviewer.
PubWorks Occupancy Approval8/31/20118/31/20118/31/2011 DONE
DetailsTiffany Lowery
Meeting  8/29/2011 DONE
Meet with superintendent and David Moser on site to give a preliminary ok from Planning on progress of building and the completed stormwater facility. Building will be completed in approximately one week and superintendent will call for final insepection. JGW 8-29-11
FIRE-Conference8/25/20118/25/20118/25/2011PDONE
DetailsTroy Cobbley
Went over racking issues with Chris Palmer
BLD-Energy code compliance8/17/20118/17/20118/17/2011PPASS
DetailsMike Jordan
Wall insulation at the perimeter framing. Phone #: ###-#### >> Inspection requested via web by Chris Palmer
BLD-Framing/Rough-in8/15/20118/16/20118/16/2011PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Chris Palmer. Interior steel stud walls for payroll storage room and perimeter fur out walls.
BLD-Concrete7/7/20117/8/20117/8/2011PDEFR
DetailsMike Jordan
CMU grout pour at 2pm. MTI will be onsite. Phone #: ###-#### >> Inspection requested via web by Chris Palmer. Special inspector on site.
BLD-Concrete7/6/20117/6/20117/6/2011PDEFR
DetailsMike Jordan
Special inspector on site.
BLD-Concrete7/5/20117/6/20117/6/2011APART
DetailsMike Jordan
Grout pour at CMU scheduled for 9:30am and 3:00pm. MTI scheduled to be onsite for both pours. Phone #: ###-#### >> Inspection requested via web by Chris Palmer. AMsonry grout at west wall 8 to 12 ft. elev.
BLD-Concrete7/5/20117/5/20117/5/2011PDEFR
DetailsMike Jordan
Masonry grout pour at 3pm today. MTI will be onsite. Phone #: ###-#### >> Inspection requested via web by Chris Palmer. Special inspector on site.
BLD-Concrete6/28/20116/28/20116/28/2011PPASS
DetailsMike Jordan
Rebar mat for SOG Phone #: ###-#### >> Inspection requested via web by Chris Palmer
BLD-Foundation6/27/20116/27/20116/27/2011PPASS
DetailsMike Jordan
Inspection of the insulation around the stem walls under slab. Phone #: ###-#### >> Inspection requested via web by Chris Palmer
BLD-Foundation6/21/20116/21/20116/21/2011PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Chris Palmer
BLD-Footing6/17/20116/20/20116/20/2011APART
DetailsMike Jordan
Pouring concrete at 2pm for the stem walls and spread footings. If at all possible, would like to schedule inspection for 11:00am - noon. Thank You. Phone #: ###-#### >> Inspection requested via web by Chris Palmer. Perimeter stemwall and interior column pad footings. PEnding special inspection.
BLD-Concrete6/14/20116/16/20116/16/2011ACANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Chris Palmer
BLD-Footing6/14/20116/16/20116/16/2011APART
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Chris Palmer. Perimeter footings. Will have special inspection.
Issue PAID IN FULL permit  6/3/2011 DONE
DetailsBarbara Stitt
Print Occupancy Form  6/2/2011  
Telephone call  6/2/2011 DONE
6-2-11 called Kent permit ready and fee given ///dld
Permit Ready to Issue  6/2/2011 DONE
Routing - PLAN CHECK5/25/2011 5/27/2011 PASS
DetailsJohn Menard
John M.
PLANS/APPL TAKEN TO FRONT DESK  5/27/2011 DONE
DetailsJohn Menard
Print Occupancy Form  5/27/2011  
Print Occupancy Form  5/27/2011 DONE
Plan assigned to (JCM)4/19/2011 5/27/2011 PASS
DetailsJohn Menard
Routing - Erosion and Sediment5/25/2011 5/25/2011 PASS
DetailsSteven Webb
ESC plan is approved according to the ESC plan and ESC permit conditions. ESC11-00226
Routing - PUBLIC WORKS5/20/2011 5/25/2011 PASS
DetailsConnie Baumgartner
Routing PW Drainage5/20/2011 5/24/2011 PASS
DetailsBrian Murphy
Plan resubmittals received  5/23/2011 DONE
DetailsChristina Prado
Received two sets of new ESC app and narratives; one copy response letter; and two sets of plans G1, L1.1 and L2.1. Plans inserted by Arch. rep. Plans put back in Brian Murphy's office to continue routing
Routing - PLAN CHECK5/19/2011 5/20/2011  
DetailsJohn Menard
Routing - FIRE5/17/2011 5/19/2011 PASS
DetailsScott Arellano
Please see attached review
Routing - PLAN CHECK5/9/2011 5/17/2011 PASS
DetailsJohn Menard
Plan Reviewer's activity  5/17/2011 PASS
DetailsJohn Menard
Reviewed and approved structural and nonstructural revisions. JCM
Plan resubmittals received  5/13/2011 DONE
DetailsTisha Gallop
received response, three coipes of structural comments, structural calculations and plan sheets C1, L2, S1.1, S2, A1, A2, A2.1, A6.1, A9, A10, A11, E4, F2, F2.1, F2.2, F2.3; inserted by arch. rep. and taken back to John Menard
Route to Impact Fee Review5/4/20115/9/20115/9/2011 PASS
DetailsCindy M. Gould
Routing - PLANNING5/6/2011 5/9/2011 PASS
DetailsDavid Moser
CUP11-00018 David M.- OK

DRH11-00053 Josh W. OK
Routing - FIRE5/4/20115/4/20115/6/2011 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  5/6/2011 FAIL
Failed Public Works, Erosion & Soil Control, Structural, Plumbing, Plan Check, Fire
Routing - PLAN CHECK5/6/2011 5/6/2011  
DetailsJohn Menard
Plan resubmittals requested  5/4/2011 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Plan resubmittals requested  5/4/2011 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK4/27/2011 5/4/2011 FAIL
DetailsJohn Menard
Routing Off Site - STRUCTURAL4/19/2011 5/3/2011 FAIL
DetailsJohn Menard
4-19-11 called Action Couriers for pick up - Received comment list from consulting structural engineer requesting revisions. JCM
Routing - PLUMBING4/27/2011 4/27/2011 PASS
DetailsDaryl Spivey
Per plans and 2003 UPC
Routing - PUBLIC WORKS4/20/2011 4/27/2011 FAIL
DetailsConnie Baumgartner
Contact Brian Murphy at ###-####
Routing - Erosion and Sediment4/27/2011 4/27/2011 FAIL
DetailsSteven Webb
ESC plan waiver is denied, ESC plan is needed, informed applicant that a plan is needed.
Routing PW Sewer Rating4/27/2011 4/27/2011 PASS
DetailsConnie Baumgartner
Routing PW Drainage4/21/2011 4/26/2011 FAIL
DetailsBrian Murphy
NEEDS SAND FILTER
Routing - Addressing4/21/2011 4/21/2011 PASS
DetailsTerry Records
Routing - PLANNING Land Div4/19/2011 4/20/2011 PASS
DetailsDave Abo
Parcel "A" of ROS 8309. 7.2 acre parcel.
Pending Assignment by JCM4/19/2011 4/19/2011 DONE
DetailsJohn Menard
Application received 4/18/2011