Third Notice | | 3/30/2012 | 8/10/2012 | | DONE |
|
|
|
|
Third Notice | | 3/15/2012 | 3/15/2012 | | DONE |
|
|
|
faxed to ESI
|
Second Notice | | 2/12/2012 | 3/1/2012 | | DONE |
|
|
|
faxed to ESI
|
First Notice | | 1/19/2012 | 2/2/2012 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/9/2012 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 1/3/2012 | 1/4/2012 | 1/4/2012 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 1/3/2012 | 1/4/2012 | 1/4/2012 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Chris Palmer. OK for perm occ.
|
FIRE-Alarm Testing | 12/29/2011 | 12/30/2011 | 12/30/2011 | P | NR |
Forrest France
|
|
|
Final Fire Alarm test to be completed. Addition of (3) H/S. As discussed, late afternoon (4:30) is beneficial. Thanks Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
BLD-Final | 12/15/2011 | 12/15/2011 | 12/15/2011 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
FIRE-Conference | 12/13/2011 | 12/13/2011 | 12/13/2011 | P | DONE |
Troy Cobbley
|
|
|
Chris with ESI and myself discussed the requirements for notification devices that will need to be installed in the new four person offices. There are two of these offices. I also verified spacing for the new notification device that was added in the conference room as referenced on the previous correction notice.
|
BLD-Framing/Rough-in | 11/29/2011 | 11/30/2011 | 11/30/2011 | P | PASS |
Mike Jordan
|
|
|
Inspection of the grid patch back in the new office build out. I can meet onsite at 3:30 pm if necessary. Thanks! Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
BLD-Framing/Rough-in | 11/21/2011 | 11/22/2011 | 11/22/2011 | A | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Chris Palmer. Interior steel stud demissing walls for new offices and cubicles, phase 2.
|
(F) Reprint permit | | | 11/18/2011 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/18/2011 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/15/2011 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 11/15/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 11/15/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 11/15/2011 | | DONE |
Tisha Gallop
|
|
|
called Kent and told him plan mod is ready and fees.
|
Plan assigned to (DRS) | 11/10/2011 | 11/10/2011 | 11/14/2011 | | PASS |
Dan Stuart
|
|
|
|
Routing - PLAN CHECK | 11/10/2011 | | 11/14/2011 | | PASS |
Dan Stuart
|
|
|
Dan Stuart Plan Mod sheets inserted into original office set of reviewed plans. Plans reviewed for scope of wrok and permit modified to reflect added work scope between grind lines C.5 to D.5 and 7 to 9 of originall reviewed plans. Plan mod to permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/14/2011 | | PASS |
|
|
|
|
Plan Modification Accepted | | | 11/9/2011 | | DONE |
Barbara Stitt
|
|
|
Plan modification accepted to modify 8 existing offices to create 8 new office work stations and 8 new offices. This was submitted with 2 copies of sheets DA1.1, A2.1, A3.2, A6.1, A7.1, A8.1, A9, MD1, A1, M3, E2, E3, & E4 and a increase in value. Assigned to Dan Stuart.
|
BLD-Final | 10/31/2011 | 10/31/2011 | 10/31/2011 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Chris Palmer. Ok to occupy phase 2 only. Needs to submit plan mod for additional work.
|
FIRE-Final Inspection | 10/31/2011 | 10/31/2011 | 10/31/2011 | A | FAIL |
Troy Cobbley
|
|
|
Life safety in phase II is passed.
|
BLD-Other | 10/12/2011 | 10/12/2011 | 10/12/2011 | P | PASS |
Mike Jordan
|
|
|
Grid patch in inspection in the new TI space. Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
BLD-Final | 10/8/2011 | 10/10/2011 | 10/10/2011 | P | CANC |
Mike Jordan
|
|
|
Above Ceiling Final. Phone #: ###-#### >> Inspection requested via web by Craig Leavitt Inspection cancelled from web by: Craig Leavitt
|
BLD-Final | 10/4/2011 | 10/4/2011 | 10/4/2011 | P | CANC |
Mike Jordan
|
|
|
New restrooms final. Please call for building access. Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
BLD-Conference | 10/4/2011 | 10/4/2011 | 10/4/2011 | P | PART |
Mike Jordan
|
|
|
Inspection on completed restrooms. All life sfaety is operational, ada ok. Ok to use pending plumbing ok.
|
BLD-Framing/Rough-in | 9/19/2011 | 9/20/2011 | 9/20/2011 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Chris Palmer. Interior steel stud framed walls for new offices were records storage was previously.
|
BLD-Framing/Rough-in | 8/15/2011 | 8/16/2011 | 8/16/2011 | P | PASS |
Mike Jordan
|
|
|
Restroom framing inside the existing general office building. Phone #: ###-#### >> Inspection requested via web by Chris Palmer. Interior steel stud walls for new restroom.
|
BLD-Concrete | 8/8/2011 | 8/8/2011 | 8/8/2011 | P | PASS |
Mike Jordan
|
|
|
Plumbing trenches for new restrooms in the existing general office Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
BLD-Framing/Rough-in | 8/3/2011 | 8/3/2011 | 8/3/2011 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Chris Palmer office walls ok
|
FIRE-Final Inspection | 7/26/2011 | 7/26/2011 | 7/26/2011 | A | PART |
Troy Cobbley
|
|
|
Partial final for the Phase I portion of the TI. See the city approved plans for three new offices, storage room and HIPA storage room where life safety is passed. Near the three new offices there are two overspaced sprinklers and fire alarm audio/visual modifications that are needed.
|
BLD-Other | 7/25/2011 | 7/25/2011 | 7/25/2011 | P | PASS |
Tom Arcoraci
|
|
|
Phase I Partial Final Phone #: ###-#### >> Inspection requested via web by Chris Palmer ok pending fire ok
|
BLD-Framing/Rough-in | 7/1/2011 | 7/1/2011 | 7/1/2011 | A | PART |
Mike Jordan
|
|
|
Framing in the Phase I of the GO TI Phone #: ###-#### >> Inspection requested via web by Chris Palmer. Interior steel stud framed walls at phase 1, needs to remoce screws from topplates to grid and support wall to structure. Also pend. electrical inspection.
|
BLD-Framing/Rough-in | 6/30/2011 | 6/30/2011 | 6/30/2011 | P | NR |
Mike Jordan
|
|
|
Phase I section of General Office TI Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
Issue PAID IN FULL permit | | | 6/3/2011 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 6/2/2011 | | DONE |
|
|
|
6-2-11 called Kent permit ready and fee given ///dld
|
Permit Ready to Issue | | | 6/2/2011 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 4/19/2011 | | 5/27/2011 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 5/19/2011 | | 5/27/2011 | | PASS |
John Menard
|
|
|
|
Print Occupancy Form | | | 5/27/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/27/2011 | | DONE |
John Menard
|
|
|
|
Routing - FIRE | 5/17/2011 | | 5/19/2011 | | PASS |
Scott Arellano
|
|
|
|
Routing - PLAN CHECK | 5/6/2011 | | 5/17/2011 | | PASS |
John Menard
|
|
|
|
Plan resubmittals received | | | 5/13/2011 | | DONE |
Tisha Gallop
|
|
|
received response and three copies of plan sheets C1, L2, S1.1, S2, A1, A2, A2.1, A6.1, A9, A10, A11, E4, F2, F2.1, F2.2, F2.3; inserted by arch. rep. and taken back to John Menard
|
Route to Impact Fee Review | 5/4/2011 | 5/9/2011 | 5/9/2011 | | PASS |
Cindy M. Gould
|
|
|
building remodel no impact fees
|
Routing - FIRE | 5/4/2011 | 5/4/2011 | 5/6/2011 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to architect.
|
1st review completed | | | 5/6/2011 | | FAIL |
|
|
|
Failed Plan Check, Fire
|
Plan resubmittals requested | | | 5/4/2011 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 4/27/2011 | | 5/4/2011 | | FAIL |
John Menard
|
|
|
|
Routing PW Sewer Rating | 4/27/2011 | | 4/27/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 4/20/2011 | | 4/27/2011 | | PASS |
Connie Baumgartner
|
|
|
Contact Brian Murphy at ###-####
|
Routing - Addressing | 4/21/2011 | | 4/21/2011 | | PASS |
Terry Records
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/19/2011 | | DONE |
|
|
|
4-18-11 ok per Sam Z. for level 3 intake
|
Pending Assignment by JCM | 4/19/2011 | | 4/19/2011 | | DONE |
John Menard
|
|
|
|
Application received | | 4/18/2011 | | | |
|
|
|
|