Permit Information
Permit NumberBLD11-00805
StatusFinaled
Name SUSTAINABLE FUTURES
Site Address 5862 W FRANKLIN RD
Project NameSUSTAINABLE FUTURES
Customer Number 
ePlanReviewNo
Description
(SUSTANIBLE FUTURES) Permit is to change the occupancy of an existing building without doing any work. This building is not fire sprinklered. Approval contingent upon adhering to the approved plans on file and plan review report. No work is being done under this permit. This building is NOT Fire Sprinklered. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 8/26/20118/16/2011 DONE
DetailsBarbara Stitt
First Notice 7/9/20117/25/2011 DONE
DetailsChristina Prado
Mailed to tenant 7/25/11
BLD-Final6/28/20116/29/20116/29/2011APASS
DetailsTom Arcoraci
John Weis Phone #: ###-####
Permanent Occupancy  6/29/2011 DONE
FIRE-Final Inspection5/24/20115/24/20115/24/2011PPASS
DetailsTroy Cobbley
lfie safety passed.
FIRE-Final Inspection5/11/20115/12/20115/12/2011AFAIL
DetailsTroy Cobbley
Resubmit plans showing the all of the actual space being used. Repair the marked exit signs and emergency lights. Provide exit discharge ligthing at the exterior exits. Provide permits for storage racks over 8'-0" (racks now exceed 8') or storage over 12'-0" (no storage over 12' yet).
Plan Reviewer's activity  5/11/2011 DONE
DetailsTim L. Woodard
Applicant informed me there was a mistake in the analysis of this building. It was not sprinklered; therefore, a new analysis was done with using a non-sprinklered building. TLW
Inspection Record Card- Bld  5/11/2011 DONE
Issue PAID IN FULL permit  5/4/2011 DONE
DetailsTisha Gallop
Print Occupancy Form  5/4/2011 DONE
DetailsTisha Gallop
Case Summary (BLD)  5/2/2011 DONE
DetailsTim L. Woodard
Permit Ready to Issue  5/2/2011 DONE
DetailsBarbara Stitt
Telephone call  5/2/2011 DONE
DetailsBarbara Stitt
Called and told Bruce Poe that permit is ready, fees due and that we need GC information on 5-2-11 @ 11:20am
1st review completed  4/29/2011 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  4/29/2011 DONE
DetailsTim L. Woodard
Case Summary (BLD)  4/29/2011 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)4/19/2011 4/29/2011 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK4/25/2011 4/29/2011 PASS
DetailsTim L. Woodard
Tim Woodard
Routing - PUBLIC WORKS4/19/2011 4/25/2011 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating4/25/2011 4/25/2011 PASS
DetailsConnie Baumgartner
Called Architect for flow amounts and spects on bottle washer
contact Connie at ###-#### - Sewer Rating
Routing PW Environmental4/22/2011 4/22/2011 PASS
DetailsWalt Baumgartner
TI in existing shell & core, located in the Bench Sewer District. Process wastewater from glass wash and cut/grind operations must comply with Bench SD pretreatment regulations. Contact Rick Christensen at ###-#### for more information
Application received 4/19/20114/19/2011 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  4/19/2011 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  4/19/2011 DONE
DetailsBarbara Stitt
Intake Approval  4/19/2011 PASS
DetailsTim L. Woodard