Second Notice | | 4/26/2012 | 5/7/2012 | | DONE |
|
|
|
|
First Notice | | 4/14/2012 | 4/16/2012 | | DONE |
|
|
|
|
Permanent Occupancy | | | 4/4/2012 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 4/2/2012 | 4/3/2012 | 4/3/2012 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Darel Hardenbrook
|
FIRE-Final Inspection | 4/2/2012 | 4/3/2012 | 4/3/2012 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Zoning Approval | 4/3/2012 | 4/3/2012 | 4/3/2012 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 3/19/2012 | 3/20/2012 | 3/21/2012 | A | NR |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Darel Hardenbrook
|
BLD-Footing | 12/22/2011 | 12/23/2011 | 12/23/2011 | A | PASS |
Jim Storey
|
|
|
Inspect footings for BLD11-03004 at 3883 S Orchard St. Jim, please call Darel at ###-#### @5 mins prior to arrival. My office is 1/4 mile away and I''ll meet you there. Prior to noon 12/23 if possible. Phone #: ###-#### >> Inspection requested via web by Darel Hardenbrook
|
BLD-Conference | 11/28/2011 | 11/28/2011 | 11/28/2011 | P | PASS |
Jim Storey
|
|
|
wall inspection. concrete at 12:30. Phone #: ###-#### >> Inspection requested via web by Darel Hardenbrook
|
BLD-Foundation | 11/28/2011 | 11/28/2011 | 11/28/2011 | P | PASS |
Jim Storey
|
|
|
|
BLD-Foundation | 11/28/2011 | 11/28/2011 | 11/28/2011 | A | PASS |
Jim Storey
|
|
|
|
BLD-Footing | 11/21/2011 | 11/22/2011 | 11/22/2011 | A | PASS |
Jim Storey
|
|
|
daryl - rebar inspection - pouring concrete at 9:30 Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/21/2011 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 11/9/2011 | | DONE |
|
|
|
|
Telephone call | | | 11/9/2011 | | DONE |
Christina Prado
|
|
|
called and let Darel know permit is ready. Advised ACHD Letter is required prior to issuance
|
Permit Ready to Issue | | | 11/9/2011 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 11/8/2011 | | 11/8/2011 | | PASS |
John Menard
|
|
|
Plans to permit desk to issue permit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/8/2011 | | PASS |
John Menard
|
|
|
|
Routing - PLANNING | 11/8/2011 | | 11/8/2011 | | PASS |
David Moser
|
|
|
Approved Current Planning - CUP11-36 (David Moser)
|
Routing - PLAN CHECK | 11/4/2011 | | 11/8/2011 | | PEND |
John Menard
|
|
|
Routed back to planning to Sarah Schafer.
|
Plan resubmittals received | | | 11/8/2011 | | DONE |
Tisha Gallop
|
|
|
received five copies of C-2; inserted by Daryl and routed to Sarah Schafer per Dan Stuart.
|
Plan assigned to (JCM) | 8/19/2011 | | 11/8/2011 | | PASS |
John Menard
|
|
|
|
Routing - PUBLIC WORKS | 11/4/2011 | | 11/4/2011 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLANNING | 11/4/2011 | | 11/4/2011 | | FAIL |
Andrea Tuning
|
|
|
The applicant was required to install the required street trees with turf grass located between the sidewalk and the parking lot. The applicant was also required to plant Class II trees in each parking lot planter. As such, the applicant should modify their site/landscape plan to show the turf grass located wtihin planter located between the sidewalk and the parkign area on Eagleson Drive and install a Class II tree within each parking lot planter. David Moser & Andrea Tuning
|
Routing - PLAN CHECK | 11/2/2011 | | 11/3/2011 | | PEND |
Jason Blais
|
|
|
Plans routed to Brian Murphy in PW Drainage.
|
Routing PW Drainage | 11/3/2011 | | 11/3/2011 | | PASS |
Brian Murphy
|
|
|
|
Plan resubmittals received | | | 11/2/2011 | | DONE |
Christina Prado
|
|
|
Received 5 copies of plans C-2. Inserted by Daryl and given back to Scott for review
|
Routing - FIRE | 10/31/2011 | | 11/2/2011 | | PASS |
Scott Arellano
|
|
|
Attached revised IFC comments to plans.
|
Routing - PLANNING | 10/31/2011 | | 10/31/2011 | | FAIL |
Andrea Tuning
|
|
|
The applicant was required to install the required street trees with turf grass located between the sidewalk and the parking lot. The applicant was also required to plant Class II trees in each parking lot planter. As such, the applicant should modify their site/landscape plan to show the turf grass located wtihin planter located between the sidewalk and the parkign area on Eagleson Drive and install a Class II tree within each parking lot planter. David Moser & Andrea Tuning
|
Routing - Design Review | 10/31/2011 | | 10/31/2011 | | FAIL |
Andrea Tuning
|
|
|
Andrea Tuning
|
Routing PW Drainage | 10/25/2011 | | 10/31/2011 | | FAIL |
Brian Murphy
|
|
|
NEED PE STAMP, BLD GUTTER NOTE AND OM SOURCE NOTES
|
Plan resubmittals received | | | 10/31/2011 | | DONE |
Christina Prado
|
|
|
Receved 7 copies of plan marked C-2. Inserted by Daryl and given back to planning to finish review
|
Routing - PUBLIC WORKS | 10/24/2011 | | 10/31/2011 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Brian Murphy for drainage issues- contact at ###-####
|
Routing - PLAN CHECK | 10/14/2011 | | 10/24/2011 | | PEND |
John Menard
|
|
|
|
Plan resubmittals received | | | 10/17/2011 | | DONE |
Christina Prado
|
|
|
receieved five sets of plans C-2 & D-3. Two sets inserted by rep and three rolled up inside to be reouted to Brian Murphy
|
Routing - PUBLIC WORKS | 10/11/2011 | | 10/14/2011 | | FAIL |
Beverly Mountain
|
|
|
Failed by Brian Murphy
|
Routing PW Drainage | 10/12/2011 | | 10/13/2011 | | FAIL |
Brian Murphy
|
|
|
need 5 copies new plan
|
Routing - PLAN CHECK | 9/27/2011 | | 10/11/2011 | | DONE |
Jason Blais
|
|
|
Routed plans to Public Works.
|
Routing - PUBLIC WORKS | 9/23/2011 | | 9/27/2011 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Brian Murphy
|
Routing PW Drainage | 9/26/2011 | | 9/27/2011 | | FAIL |
Brian Murphy
|
|
|
NEEDS ACHD OK PLUS MANY REVISIONS
|
Routing - PLAN CHECK | 9/6/2011 | | 9/23/2011 | | PEND |
John Menard
|
|
|
|
Plan resubmittals received | | | 9/23/2011 | | DONE |
Christina Prado
|
|
|
Received three copies of plans F-1 & F-2, revised foundation calcs and response letter. Also received three sets of plans C-1, C-2, C-3 & C-4 as well as three stormwater addendums for grading and drainage requirements. Plans inserted and taken back to John Menard for review.
|
Plan Reviewer's activity | | | 9/23/2011 | | PASS |
John Menard
|
|
|
Reviewed and approved structural revisions. JCM
|
Route to Impact Fee Review | 9/1/2011 | 9/7/2011 | 9/8/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 9/1/2011 | 9/1/2011 | 9/6/2011 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to architect.
|
Plan resubmittals received | | | 9/6/2011 | | DONE |
Christina Prado
|
|
|
Received three copies of Pre-Engineered Steel Building System Calcs. Taken to John Menard for review
|
1st review completed | | | 9/6/2011 | | FAIL |
|
|
|
Failed Public Works, Planning, Fire
|
Plan resubmittals requested | | | 9/1/2011 | | DONE |
John Menard
|
|
|
E-mailed the applicant a copy of the structural review requesting revisions. JCM
|
Plan Reviewer's activity | | | 9/1/2011 | | PASS |
John Menard
|
|
|
Reviewed and approved construction documents as submitted with attached commentlist. JCM
|
Routing - PLAN CHECK | 8/25/2011 | | 9/1/2011 | | PASS |
John Menard
|
|
|
John Menard
|
Routing Off Site - STRUCTURAL | 8/19/2011 | | 8/31/2011 | | FAIL |
John Menard
|
|
|
Received comment list from consulting structural engineer requesting revisions. JCM
|
Routing - PLANNING | 8/25/2011 | | 8/25/2011 | | FAIL |
David Moser
|
|
|
Cup11-00036 David Moser
The applicant has not completed Design Review approval at this point in time. The applicant has not met the terms of the Conditional Use Permit either. ANY 8-25-11
|
Routing - Erosion and Sediment | 8/23/2011 | | 8/25/2011 | | PASS |
Steven Webb
|
|
|
ESC11-00602 plan waiver approved with condition attached to the permit.
|
Routing - PUBLIC WORKS | 8/19/2011 | | 8/23/2011 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Brian Murphy ###-####
|
Routing PW Drainage | 8/22/2011 | | 8/23/2011 | | FAIL |
Brian Murphy
|
|
|
NEED ACHD OK
|
Routing PW Sewer Rating | 8/22/2011 | | 8/22/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 4/20/2011 | 8/19/2011 | | DONE |
Tisha Gallop
|
|
|
|
Pending Assignment by JCM | 8/19/2011 | | 8/19/2011 | | DONE |
John Menard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/19/2011 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/19/2011 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLANNING Land Div | 8/19/2011 | | 8/19/2011 | | PASS |
Dave Abo
|
|
|
Parcel over 5 acres in size.
|
Routing - Addressing | 8/19/2011 | | 8/19/2011 | | PASS |
Terry Records
|
|
|
|
Routing - PLANNING | 11/8/2011 | | 1/8/2011 | | PASS |
Sarah Schafer
|
|
|
Approved per redlines and DRH11-00129
|