Permit Information
Permit NumberBLD11-00815
StatusFinaled
Name RBI CONSTRUCTION INC
Site Address 205 N MILWAUKEE ST
Project NameCHIPOTLE MEXICAN GRILL
Customer Number 
ePlanReviewNo
Description
(CHIPOTLE MEXICAN GRILL) This building is not fire sprinklered. To remodel an existing 2,402 square foot restaurant building for a new restaurant tenant. Work is to include interior nonbearing walls, 2 restrooms accessible to the disabled, a grease hood and duct, kitchen equipment, suspended acoustical ceilings, suspended gypsum board ceilings, gypsum board soffits, exterior wall infills, interior finishes, and exterior plaster finishes. Structural work includes expanding existing concrete foundations, cantilevered awnings supported by new steel columns, and 4x6 beams to support roof top equipment. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The structural design for the support of an existing roof beam was allowed to be deferred. After the structural design for the beam support is completed, the design is required to be reviewed by the Architect and then forwarded to the IBC Plans Examiner (City of Boise) for review. The work is not allowed to be done until the structural design is reviewed and approved by the IBC Plans Examiner. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 10/2/20119/30/2011 DONE
First Notice 9/12/20119/22/2011 DONE
BLD-Final9/2/20119/2/20119/2/2011PPASS
DetailsMike Jordan
John Phone #: ###-####. Ok for perm occ.
Zoning Approval9/2/20119/2/20119/2/2011 PASS
DetailsJosh Wilson
Permanent Occupancy UNPAID FEE  9/2/2011 DONE
DetailsChristina Prado
FIRE-Final Inspection8/31/20118/31/20118/31/2011PPASS
DetailsTroy Cobbley
life safety passed
BLD-Framing/Rough-in8/8/20118/8/20118/8/2011PPASS
DetailsMike Jordan
JOHN Phone #: ###-####. Hardlid.
BLD-Framing/Rough-in8/1/20118/1/20118/1/2011PPASS
DetailsTom Arcoraci
Fire blocking inspection please-John Phone #: ###-####
MISC ACTIONS  8/1/2011 DONE
DetailsTisha Gallop
contractor picked up modified plans, permit is already in issued status
Routing - PLAN CHECK7/26/2011 7/27/2011 PASS
DetailsCarl Westfall
Routing completed.
PLANS/APPL TAKEN TO FRONT DESK  7/27/2011 DONE
CHANGE STATUS TO (ISS)  7/27/2011 DONE
DetailsBarbara Stitt
Per Carl Westfall
Telephone call  7/27/2011 DONE
DetailsBarbara Stitt
Called and left a message on Jim Bray's phone that permit is ready for pick up on 7-27-11 @ 3:35pm//BAS
Routing - PLAN CHECK7/22/2011 7/26/2011 PASS
DetailsCarl Westfall
Reviewed and approved the deferred submittal for the East exterior wall.
Routing - PLANNING7/26/2011 7/26/2011 PASS
DetailsJosh Wilson
Revised elevations/floor plans ok JGW
Additional plans submitted  7/22/2011 DONE
DetailsChristina Prado
Deffered Submittals--Received two full sets of plans A115 & A200 as well as two 8 1/2 x 11 sets and transmittal letter. Given to Carl Westfall to add into plans
BLD-Energy code compliance7/20/20117/20/20117/20/2011PPASS
DetailsMike Jordan
john Phone #: ###-####
Telephone call  7/20/2011 DONE
Talked with Stacy Croft, Project Coordinator / architect for project. she wanted to know if engineering details and plans for the east wall had been approved. Did not find any comments of approval for the east wall design in the computer under the BLD number. Plans behind Carls desk. Sticky on detail sheet indicates the approved plans for which the permit is issued shows 8' window openings and the engineering is for 6'-6" openings.
I passed this information on to Stacy and she said the details were correct, that the opeings had been reduced. She will send a new elevation showing the reduced opening width. Reviewed with Jason Blais - okay to approve based on engineering data if Planning does not require additional info.
BLD-Framing/Rough-in7/18/20117/18/20117/18/2011PPART
DetailsMike Jordan
John Phone #: ###-####. Interior steel stud walls. Needs to fire block on furouts and soffits. Also needs to complete airseal on exterior walls.
BLD-Footing7/7/20117/8/20117/8/2011APART
DetailsMike Jordan
John Phone #: ###-####. Work in progress for dumpster footing, will have special inspection.
BLD-Framing/Rough-in6/30/20116/30/20116/30/2011PPASS
DetailsMike Jordan
Wood framing for new mansard on south and west walls/.
BLD-Footing6/29/20116/30/20116/30/2011APART
DetailsMike Jordan
john - as early as possible please Phone #: ###-####. Footing for new column and storefront at south side of building. Pending special inspection.
Case Summary (BLD)  6/27/2011 DONE
DetailsTisha Gallop
Plan resubmittals received  6/22/2011 DONE
DetailsChristina Prado
Received via Fedex two copies of stamped structural roof and elevation plans. Routed to Carl Westfall for review
Telephone call  6/7/2011 DONE
DetailsTisha Gallop
called Stacy Kroft and told her need to come pick up revised plan sheets for trash enclosure and insert into field set, no fees due.
Routing - PLAN CHECK6/3/2011 6/7/2011 PASS
DetailsCarl Westfall
Revised site plan sheets approved. No additional fees.
Permit Ready to Issue  6/6/2011 DONE
DetailsBarbara Stitt
Issue PAID IN FULL permit  6/6/2011 DONE
DetailsBarbara Stitt
Routing - PUBLIC WORKS6/3/2011 6/3/2011 PASS
DetailsConnie Baumgartner
resubmital for Peter, had already looked at a pdf of them, said ok to pass. 6-3-11 clb.
Routing - PLANNING6/3/2011 6/3/2011 PASS
DetailsJosh Wilson
Enlarged trash enclosure ok per revised drawings in file
Routing - PLAN CHECK5/31/2011 6/3/2011 DONE
DetailsCarl Westfall
New site plan sheets inserted in office copy and started routing to PW and Planning.
Plan resubmittals received  5/31/2011 DONE
DetailsTisha Gallop
per Carl W. log in sheets mailed in as resubs for revised trash enclosure; received two copies of plan sheets A100, A101, taken to Carl W.
Telephone call  5/27/2011 DONE
t/c w harlan - permit ready and fees given - also need gc, rce and rp
Routing - PUBLIC WORKS5/25/2011 5/26/2011 PASS
DetailsConnie Baumgartner
Routing - PLANNING5/26/2011 5/26/2011 PASS
DetailsJosh Wilson
added 2 exterior heaters
Routing PW Solid Waste5/26/2011 5/26/2011 PASS
DetailsPeter J. McCullough
Approved for trash only (modification for enclosure to include recycling to follow)
Routing - PLAN CHECK5/26/2011 5/26/2011 DONE
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  5/26/2011 DONE
Permit Ready to Issue  5/26/2011 DONE
Print Occupancy Form  5/26/2011 DONE
Plan assigned to (CJW)4/21/2011 5/26/2011 PASS
DetailsCarl Westfall
Routing - PLAN CHECK5/13/2011 5/25/2011 PASS
DetailsCarl Westfall
Drawings approved after the resubmittal review.
Plan resubmittals received  5/19/2011  
DetailsBarbara Stitt
Received cover transmittal response letter dated 5-18-11 from Harlan Faust Associates Inc to Carl Westfall, 2 copies of sheets A-000, A-015, A-016, A-150, A-300, S-100, S-200, M-100, M-120, M-200, P-100, P-200, E-100, E-110, E-200 and taken to Carl Westfall's desk
Routing - FIRE5/10/20115/10/20115/13/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  5/13/2011 FAIL
Failed Public Works and Plan Check
Route to Impact Fee Review5/10/20115/13/20115/11/2011 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - PLAN CHECK4/26/2011 5/10/2011 FAIL
DetailsCarl Westfall
The IBC plan review was started on May 5, 2011 and was finished on May 10, 2011 (4 days). Revised drawings were required. See the plan review report.
Routing - PLUMBING4/25/2011 4/26/2011 PASS
DetailsBill VanDegrift
provide a seperate water supply at the mop sink for the chemical station. R.P. required upstream of the filter system. additional cross connection protection may be required, at the rethermalizer, ect.. change the R.P. on the water service to a DCVA.
Routing - Design Review4/26/2011 4/26/2011 PASS
DetailsJosh Wilson
Josh Wilson - DRH11-00057
Routing - Erosion and Sediment4/22/2011 4/25/2011 PASS
DetailsSteven Webb
ESC plan waiver request is approved according to the ESC Permit Conditions.
Routing - PUBLIC WORKS4/21/2011 4/22/2011 FAIL
DetailsConnie Baumgartner
Failed by Pete McCullough in solid waste ###-####
Routing PW Environmental4/22/2011 4/22/2011 PASS
DetailsWalt Baumgartner
Former JackNBox, existing GI to be inspected for proper operation.
Routing PW Sewer Rating4/22/2011 4/22/2011 PASS
DetailsConnie Baumgartner
Routing PW Solid Waste4/22/2011 4/22/2011 FAIL
DetailsPeter J. McCullough
Need specifics for enclosure, (will it be modified or not).

Peter McCullough ###-####
Routing - Addressing4/21/2011 4/21/2011 PASS
DetailsTerry Records
Pending Assignment by JCB4/20/2011 4/21/2011 DONE
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  4/20/2011 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  4/20/2011 DONE
DetailsChristina Prado
Application received 4/20/2011