Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD11-00818
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameB50-R&D EXPANSION BLD
Customer NumberC15044
ePlanReviewNo
Description
Micron Building B50 - R&D Building - DEFERRED SUBMITTAL 2/24/12 Chemical Building Liquid Storage Room, H-2 occupancy, W/ minimum 2-hour fire-barrier wall separation between H-2 & H-5 occupancies, BLDG 50 R&D. To construct a new 111,005 square foot, two story, with 71,855 square foot basement, concrete and steel semiconductor fabrication R & D facility and related site improvements. The first floor level is 89, 435 sq. ft. The second level is a 21,570 sq. ft. equipment platform. The basement level (subfab.) has 71,855 sq. ft. finished. All construction per the approved plans and attached comment list. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 4/5/20133/26/2013 DONE
Permanent Occupancy  3/26/2013 DONE
DetailsTisha Gallop
PubWorks Occupancy Approval3/18/20133/18/20133/18/2013 DONE
DetailsTiffany Lowery
Plan assigned to (DRS)2/24/20122/24/201212/24/2012 PASS
DetailsDan Stuart
deferred submittals for chem bldg
BLD-Final12/18/201212/20/201212/20/2012PPASS
DetailsJim Storey
steve Phone #: ###-####
FIRE-Final Inspection12/18/201212/19/201212/19/2012PPASS
DetailsForrest France
BLD-Conference10/1/201210/3/201210/3/2012APART
DetailsJim Storey
look at chem tray fire caulking to close outer opening in sheetrock. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes sdock side ok
BLD-Conference8/21/20128/22/20128/22/2012APASS
DetailsJim Storey
Firewall penetrations at the chem building. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
Plan resubmittals received  8/10/2012  
Received one cover transmittal and 3 copies of sheets A-2000, A-2030, A2040, A2050, A-2060, A-7001 and taken to Dan Stuart
BLD-Final8/3/20128/6/20128/6/2012APASS
DetailsJim Storey
James Phone #: ###-#### phase 2 east half of bld50# phase 2 ok on temp.
BLD-Final8/2/20128/3/20128/6/2012PNR
DetailsJim Storey
James Phone #: ###-#### hardware needs instaled
FIRE-Final Inspection8/3/20128/3/20128/3/2012PPART
DetailsForrest France
"Phase two" area including K line east approved for temporary occupancy. Final pending finishes at the chemical building, project related FIR permit finals and noted correction items.
FIRE-Final Inspection8/2/20128/2/20128/3/2012PNR
DetailsForrest France
BLD-Final8/2/20128/2/20128/2/2012PNR
DetailsJim Storey
James Phone #: ###-####
FIRE-Final Inspection7/31/20128/1/20128/2/2012PNR
DetailsForrest France
James Phone #: ###-#### - life saety
BLD-Framing/Rough-in7/18/20127/19/20127/19/2012ANR
DetailsJim Storey
Phone #: 36088231 >> Inspection requested via mobile web by rustin
BLD-Conference7/11/20127/12/20127/12/2012APART
DetailsJim Storey
JOEL Phone #: ###-#### east n/s stair fire riser rm fire stop fan protection/
BLD-Other7/9/20127/10/20127/11/2012ADEFR
DetailsJim Storey
JOEL Phone #: ###-####
BLD-Framing/Rough-in6/29/20127/2/20127/2/2012APASS
DetailsJim Storey
James Phone #: ###-#### conf. ok
BLD-Framing/Rough-in6/7/20126/7/20126/7/2012PPASS
DetailsJim Storey
joel Phone #: ###-#### interior of n and s stair enclosers fire stopped and ok to finsh gyp.
BLD-Framing/Rough-in5/23/20125/23/20125/23/2012PPASS
DetailsJim Storey
joel Phone #: ###-#### fire collor assemblies instaled on backsde of 2hr fire wall core board. ok to cover chem side of wall.
BLD-Framing/Rough-in5/15/20125/16/20125/16/2012AFAIL
DetailsJim Storey
Wall inspection please-Joel Phone #: ###-#### need firecollors on 3" pipes
Plan resubmittals received  5/16/2012  
Recieved 2 copies of of letter letter dated 5-14-12 from Paul Marcolina one to Jason Blais and one to Romeo Gervais, 2 copies of NE Stair (FAB Level Framing), (Mezzanine Framing), (Roof Framing), SE Stair (FAB Level Framing), (Mezzanine Framing), (Roof Framing) taken to each inbox
BLD-Conference5/2/20125/3/20125/3/2012APASS
DetailsJim Storey
reviewed east stair enclosers for colum pertection that will be in gyp. inlew of splk aplacation. submital aproved and work ok to start to complet stairs on east end of bldg. 301
BLD-Other4/27/20124/30/20124/30/2012APASS
DetailsJim Storey
joel Phone #: ###-#### ne fire expantion joint ok to level 30/ framing ok on chem bldg./ exterior wall cover water protection 80 % wip ok.
BLD-Final4/23/20124/23/20124/23/2012APASS
DetailsJim Storey
first phase as noted on plan on site ok for temp occ.
FIRE-Final Inspection4/17/20124/17/20124/19/2012APART
DetailsForrest France
TCO only for "phase one" at portions of the sub-fab, photo bay and mechanical areas per agreement on record.
BLD-Other4/10/20124/12/20124/12/2012APART
DetailsJim Storey
joel Phone #: ###-#### ok for temp in first phase as noted. pending fire insp.
BLD-Other4/9/20124/10/20124/10/2012APART
DetailsJim Storey
Drop ceiling -- Joel Phone #: ###-#### cn list w/joel
BLD-Final4/4/20124/5/20124/9/2012PNR
DetailsJim Storey
for temp//Joel Hartman Phone #: ###-####
FIRE-Final Inspection4/5/20124/6/20124/6/2012PCANC
DetailsForrest France
Overbooked
FIRE-Final Inspection4/5/20124/5/20124/5/2012PNR
DetailsForrest France
BLD-Final4/2/20124/3/20124/4/2012PNR
DetailsJim Storey
FIRE-Final Inspection3/30/20124/2/20124/2/2012PNR
DetailsForrest France
BLD-Final3/30/20124/2/20124/2/2012PDEFR
DetailsJim Storey
joel Phone #: ###-####
BLD-Final3/28/20123/29/20123/30/2012PNR
DetailsJim Storey
joel Phone #: ###-#### fab level 20 exiting not ready.
BLD-Final3/27/20123/28/20123/28/2012PPART
DetailsJim Storey
JOEL (TEMP OCC) Phone #: ###-#### c/n on stairs complet for gyp protection./ pending nw mez tube steel at fire alarm panel// fire door glazing to be instaled.
BLD-Final3/23/20123/26/20123/26/2012PPART
DetailsJim Storey
Joel Phone #: ###-#### walk through temp exit path and requriments. list w/jol// walked throug with special insp as to temp sign off documantation.
BLD-Framing/Rough-in3/23/20123/23/20123/23/2012PPART
DetailsJim Storey
joel Phone #: ###-#### wip on both stair enclosers
Print Pending Permit.LaserJet4  3/23/2012  
Case Summary (BLD)  3/23/2012  
Print Pending Permit.LaserJet4  3/23/2012  
BLD-Framing/Rough-in3/19/20123/20/20123/20/2012APART
DetailsJim Storey
Joel-walls framing Phone #: ###-#### sw stair interior ok 2 locations membrane repair/ c/n to address 1604.9 as to atchment of raised floor sys to waffel deck.
BLD-Conference3/16/20123/16/20123/16/2012PPART
DetailsJim Storey
meet with paul m. reviewed alternet stair provisions and fire spk submital w/fire planreview notes. Fire p.e. is on board with providing a clear submital back to the city. A adendem to clearify the aprovals grated by fire and bld officials for clearity will be also submited.
Routing - PLAN CHECK2/24/2012 3/16/2012 PASS
DetailsDan Stuart
deferred submittals for chem bldg
Routing Off Site - STRUCTURAL3/15/2012 3/16/2012 PASS
DetailsDan Stuart
E-mail from outsource structural engineer plan review approving resubmittals and approving strcutural plan review. Copy attached to permit.
Telephone call  3/15/2012  
3-15-12 called Action Couriers for pick up.
BLD-Wall cover3/12/20123/12/20123/12/2012PNR
DetailsJim Storey
joel hartman
BLD-Wall cover3/8/20123/9/20123/9/2012APART
DetailsJim Storey
joel Phone #: ###-#### beam protection and firestopping on going in west n/s stair enclosers.
BLD-Conference3/8/20123/9/20123/9/2012APASS
DetailsJim Storey
to meet w/psp arch/micron arch/ contractor. resubmital to be drawn for east firebarior wall lines as well as locations of fire spk col. protection.
BLD-Wall cover3/8/20123/8/20123/8/2012APASS
DetailsJim Storey
3hr wall at dock s side gyp ok for cover/ fire expantion joint being instaled and will insp. fri.
BLD-Conference3/7/20123/7/20123/7/2012APART
DetailsJim Storey
reviewed 3 hr wall at dock reorintation of gyp in progress. walked north and south stairs beam wrap of vertical sopport north south side of encloser complet as well as lid at landing/ south fab level beam wrap in progress.
Routing Off Site - STRUCTURAL2/24/2012 3/6/2012 FAIL
DetailsJason Blais
Failed structural review. Structural plan review report sent to Paul Marcolina of Micron.
BLD-Conference3/5/20123/5/20123/5/2012PPART
DetailsJim Storey
ask to walk stairs sw and nw/ will see if details for const. are avalable for review. reviewed ares to be protected with fb.
BLD-Conference3/2/20123/2/20123/2/2012APASS
DetailsJim Storey
review of vertacal protection locations and type of aplacation.mark up of all locations w/walk thru. to verify spk design to be submitted to the city.
BLD-Conference3/1/20123/1/20123/1/2012APASS
DetailsJim Storey
framing of coreboard ceilling of sw stair ok for aplacation of face gyp to be called in for atchment insp. upon starting progrestion.vertical shaftwall at top of sw stair at chase ok for cover./ 3 hr wall at link/dock of 24 reviewed as to how to instal per aproved details.
BLD-Conference2/29/20122/29/20122/29/2012PDEFR
DetailsJim Storey
test to use insp. program w/hold on proj.
Additional plans submitted  2/23/2012 DONE
DetailsTisha Gallop
received deferred submittals for chem building, stampled and routed to Dan Stuart.
Case Summary (BLD)  2/15/2012 DONE
BLD-Conference1/31/20121/31/20122/6/2012PPASS
DetailsJim Storey
Print Occupancy Form  1/30/2012 DONE
Issue & PRINT to be Invoiced  12/30/2011 DONE
DetailsTisha Gallop
PLANS/APPL TAKEN TO FRONT DESK  12/23/2011 PASS
Plan assigned to (DRS)10/31/2011 12/23/2011 PASS
DetailsDan Stuart
Plan reassigned to Dan Stuart.
Routing - PLAN CHECK6/17/2011 12/23/2011 PASS
DetailsDan Stuart
Plans approved as noted and attached to plans of all reviewing agencies and the Deferred submittal iems attached to plans.
Plan resubmittals received  12/16/2011 DONE
DetailsTisha Gallop
Received two full sets of composite drawings.
Plan resubmittals received  12/13/2011 DONE
DetailsTisha Gallop
Received two full composite sets of plans; sheets Cover, A1000, A1050, A1060, A1500, A2000, A2010, A2020, A2030, A2040, A2050, A2060, A3000, A3030, A3040, A3050, A3060, A4000, A4010, A4030, A5001, A5503, -6001, A6002, A6003, A3004, A6501, A6502, A6503, A6504, A6701, A6702, A6703, A6704, A6705, A6706, A6707, A7001, A7101, A7102, A7103, A7104, A7501, A7502, A7701, A7801, AC1000, AC1030, AC2000, AC2010, AC2030, AC2050, AC2060, AS1500, C0.0, C0.1, C1.0, C1.1, C1.2, C2.1, C3.0, C3.1, C3.2, C4.0, C4.1, C5.0, C5.1, EF2000, EF2010, EF2030, EF2040, EG2000, EL1030, EL1040, EL1050, EL1060, EL1510, EL2010, EL2020, EL2030, EL2040, EL2050, EL2060, EL3000, EL3030, EL3040, EL3050, EL3060, EO8001, EO8002, EO8003, EO8004, EO8005, EO8006, EO8007, EO8008, EO8011, EP1010, EP1030, EP1040, EP1050, EP1060, EP1510, EP2010, EP2020, EP2030, EP2040, EP2050, EP2060, EP3030, EP3040, EP3050, EP3060, EP4040, EP4050, EP4060, EQ1040, EQ1050, EQ1060, EQ2030, EQ2050, EQ2060, EQ3060, ER2050, G0001, GL0001, GL2000, GL3000, M3001, M6002, M9004, M9005, M9006, MH1030, MH2010, MH2030, MH2050, MH2060, MH3030, MH3040, MH3050, MH3060, MP1030, MP2030, MP3030, MP3050, MP3060, PD9001A, PD9001B, PD9060A, PD9060B, PD9060C, PD9061A, PD9061B, PD9061C, PD9062, PD9064A, PD9064B, PD9064C, PD9066A, PD9068, PD9071, PD9072, PD9073, PE1000, PE1041, PE2000, PE2041, PE2042, PE3000, PE3041, PE4000, PE4041, PL1001, PL2007, PL3000, PL4001, S0001, S0004, S1200, S1230, S1240, S1250, S1260, S1500, S1510A, S1520A, S1530, S1550A, S2510A, S3400, S3430, S3440, S3450, S3460, S3500, S3510A, S3530, S3550, S3560, S3600, S3630, S3640, S3650, S3660, S4000, S4030, S4050, S4060, S7001, S7002, S8023, S8025, S8504, S8505, S8509, S8510, S8525; taken to Dan Stuartl
Plan resubmittals received  11/2/2011  
Received 1 cover transmittal, 1 copy of letter to Romeo Gervais & Jason Blais dated 11-1-11 from John Velikoff, 2 copies of sheet A-7501 and taken to Jason Blais
Plan assigned to (JCM) 4/21/201110/31/2011 DEFR
DetailsJohn Menard
Plan reassigned to Dan Stuart.
Plan resubmittals received  10/26/2011  
10-25-11 received 1 letter of transmittal, 2 mechanical com check,2 exterior lighting com check,and 2 copies of sheets A-2510,A-3000,A-3030,GL-0001,& GL3000 sent to Jason B.
Plan Reviewer's activity  10/26/2011 FAIL
Only remaining item to be addressed is protection of steel columns and beams supporting the 1-hour stair enclosure. Paul Marcolina working on providing means of protection for code compliance
Plan Reviewer's activity  10/25/2011 FAIL
Some items of original plan review by John Menards are still being resolved. Resubmittals required. Paul marcolina alerted to remaining items in question.
Plan resubmittals received  10/24/2011 DONE
DetailsChristina Prado
Received one transmittal letter; two copies of response to fire wall construction, including drawings; and two copies of the following plans marked A-1510, A-2010, A-2040, A-2510, A-6004, A-7001, A-7102, A-7103, A-7502 & AC-2010. Given to Dan Stuart for review
Plan Reviewer's activity  10/14/2011 FAIL
Resubmittals of 10/4/11were incomplete. Resubmittals required. Arranged to meet with Paul Marcolina & Ron Hill to discuss.
Plan Reviewer's activity  10/13/2011 DONE
Went to job site with Jim Storey to become familiar with project. Reviewed outstanding items of 3 hour fire wall location, mechanical mezzanine, accessibility to mechanical basement under main floor fab and the fire rating of support structure for stair enclosure.
Plan resubmittals received  10/7/2011 DONE
DetailsTisha Gallop
received envelope complaince certificate, Plan Review response #2, Alternate propsal for Fire wall, Alternat proposal for house vaccuum details, plan review response regarding accessible routes, two copies of Test Reports book and plan sheets A-5503, A-6701, A-6702, A-6703, A-6704, A-6707, A-7101, A-7501; taken by Ron Hill.
Plan resubmittals received  9/23/2011 DONE
DetailsTisha Gallop
received Alternate Proposal; taken to Jason Blais.
Plan resubmittals requested  8/20/2011 DONE
DetailsJohn Menard
E-mailed the architect a copy of the second plan review comment list requesting additional revisions. JCM
Plan resubmittals requested  8/16/2011 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review for the foundation of the proposed chemical building addition. JCM
Routing Off Site - STRUCTURAL8/5/2011 8/15/2011 PASS
DetailsJohn Menard
additional plans - Received comment list from consulting structural engineer for the chemical building addition foundation review requesting revisions. JCM
Telephone call  8/5/2011  
called Action Couriers for pick up.
Plan resubmittals received  8/5/2011 DONE
DetailsTisha Gallop
received three copies of response with attachments and three copies of plan sheets A2010, A2020, A2050, A2510, A2530, A5503, A6701, A6702, A6703, A6704, A6705, A6706, A6707, A7001, A7501, GL2000, PL1001, PL2001, PL3001
Additional plans submitted  8/5/2011 DONE
DetailsTisha Gallop
Additional plans submitted, three copies of Structural Calculations and plan sheets Cover, G-0001, GL-2000, C0.0, C0.1, C1.0, C1.1, C1.2, C2.0, C2.1, C3.0, C3.1, C3.2, C4.0, C4.1, C5.0, C5.0, C6.0, S-0001, S-0004, S-1500, S-1530, S-3500, S-3530, S-7001, S-7002, S-8011, S-8012, S-8516, S-8517, AS-1500, A-1500, A-1530, A-2000, A-2030, A-3000, A-3030, A-4000, A-4030, A-5001, A-6003, A-6004, A-6701, A-7501, A-7701, EG-2000; taken to John Menard.
Routing - FIRE  7/1/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
Plan resubmittals received  6/30/2011 DONE
DetailsScott Arellano
Recieved additional plan information from Paul Marcolina via email.
Routing - FIRE6/15/20116/15/20116/17/2011 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
Routing Off Site - STRUCTURAL6/10/2011 6/17/2011 PASS
DetailsJohn Menard
Called Action Courier for pick up - Received e-mail from consulting structural engineer approving final requested revisions. JCM
1st review completed  6/17/2011 FAIL
Failed, Structural, Plan Check, Fire
Route to Impact Fee Review6/15/20116/20/20116/16/2011 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK5/4/2011 6/15/2011 FAIL
DetailsJohn Menard
Plan resubmittals received  6/9/2011  
Received 3 copies of sheet S-1500, S-1540, S-3500, S-3540, S-8502, S-8503, S-8506, GL-2000, 3 copies of structural calculation packets, 3 copies of letter to Jason Blais & Ron Amandus from Ron Menard, 3 copies of response comments from David Brown dated 6-3-11- all this was given to Ron Hill.
Routing Off Site - STRUCTURAL5/13/2011 5/27/2011 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  5/27/2011 DONE
DetailsJohn Menard
E-mailed Paul Marcolina a copy of the structural review requesting additional revisions. JCM
Telephone call  5/13/2011 DONE
DetailsChristina Prado
Called Action Couriers for pick-up
Plan resubmittals received  5/12/2011 DONE
DetailsChristina Prado
Received threee copies of structural calcs and plans S-3500, S-3530 and S-3540. Sheets inserted by arch rep adn taken to John Menard for review
Routing - PLUMBING4/27/2011 5/6/2011 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Plan resubmittals requested  5/5/2011 DONE
DetailsJohn Menard
E-mailed Paul Marcolina a copy of the structural review comments requesting revisions. JCM
Plan resubmittals received  5/4/2011 DONE
DetailsChristina Prado
Receive two set of plans PP-1000, PP-1032, PP-1034, PP-1041, PP-1042, PP-1043PP-1044, PP-1500, PP-1512, PP-1514, PP-1532, PP-2500, PP-2512, PP-1214, &PP-2532. After speaking to Ron Hill, plans being held at front counter for plumbing review with Bill before being inserted
Routing Off Site - STRUCTURAL4/21/2011 5/4/2011 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions. JCM
Routing - PLANNING5/3/2011 5/3/2011 PASS
DetailsSarah Schafer
Telephone call  5/3/2011 PASS
DetailsBill VanDegrift
talked to Paul Marcolina with Micron, He is sending some additional plans for review with potable water system information.
Plan resubmittals received  5/2/2011 DONE
DetailsTisha Gallop
received memo and table for Hazard Classification and Chemical Quantity Summary for Bldg 50; taken to John Menard.
Routing PW Environmental4/22/2011 4/29/2011 PASS
DetailsWalt Baumgartner
Mike Hunter reviewed.
Routing PW Sewer Rating4/27/2011 4/27/2011 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS4/21/2011 4/27/2011 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment4/27/2011 4/27/2011 CANC
DetailsSteven Webb
Current CMC 8-17 Exempts Micron from securing an ESC permit because they are holders of a MSGP permit.
Routing PW Drainage4/22/2011 4/25/2011 PASS
DetailsBrian Murphy
Routing - Addressing4/22/2011 4/22/2011 PASS
DetailsApril Wing
Telephone call  4/21/2011 DONE
DetailsChristina Prado
Called Action Couriers for pick up 9:30 a.m.
Plans ACCEPTED BY PLAN TECH  4/20/2011 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  4/20/2011 DONE
DetailsChristina Prado
Application received 4/20/2011