First Notice | | 4/5/2013 | 3/26/2013 | | DONE |
|
|
|
|
Permanent Occupancy | | | 3/26/2013 | | DONE |
Tisha Gallop
|
|
|
|
PubWorks Occupancy Approval | 3/18/2013 | 3/18/2013 | 3/18/2013 | | DONE |
Tiffany Lowery
|
|
|
|
Plan assigned to (DRS) | 2/24/2012 | 2/24/2012 | 12/24/2012 | | PASS |
Dan Stuart
|
|
|
deferred submittals for chem bldg
|
BLD-Final | 12/18/2012 | 12/20/2012 | 12/20/2012 | P | PASS |
Jim Storey
|
|
|
steve Phone #: ###-####
|
FIRE-Final Inspection | 12/18/2012 | 12/19/2012 | 12/19/2012 | P | PASS |
Forrest France
|
|
|
|
BLD-Conference | 10/1/2012 | 10/3/2012 | 10/3/2012 | A | PART |
Jim Storey
|
|
|
look at chem tray fire caulking to close outer opening in sheetrock. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes sdock side ok
|
BLD-Conference | 8/21/2012 | 8/22/2012 | 8/22/2012 | A | PASS |
Jim Storey
|
|
|
Firewall penetrations at the chem building. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
|
Plan resubmittals received | | | 8/10/2012 | | |
|
|
|
Received one cover transmittal and 3 copies of sheets A-2000, A-2030, A2040, A2050, A-2060, A-7001 and taken to Dan Stuart
|
BLD-Final | 8/3/2012 | 8/6/2012 | 8/6/2012 | A | PASS |
Jim Storey
|
|
|
James Phone #: ###-#### phase 2 east half of bld50# phase 2 ok on temp.
|
BLD-Final | 8/2/2012 | 8/3/2012 | 8/6/2012 | P | NR |
Jim Storey
|
|
|
James Phone #: ###-#### hardware needs instaled
|
FIRE-Final Inspection | 8/3/2012 | 8/3/2012 | 8/3/2012 | P | PART |
Forrest France
|
|
|
"Phase two" area including K line east approved for temporary occupancy. Final pending finishes at the chemical building, project related FIR permit finals and noted correction items.
|
FIRE-Final Inspection | 8/2/2012 | 8/2/2012 | 8/3/2012 | P | NR |
Forrest France
|
|
|
|
BLD-Final | 8/2/2012 | 8/2/2012 | 8/2/2012 | P | NR |
Jim Storey
|
|
|
James Phone #: ###-####
|
FIRE-Final Inspection | 7/31/2012 | 8/1/2012 | 8/2/2012 | P | NR |
Forrest France
|
|
|
James Phone #: ###-#### - life saety
|
BLD-Framing/Rough-in | 7/18/2012 | 7/19/2012 | 7/19/2012 | A | NR |
Jim Storey
|
|
|
Phone #: 36088231 >> Inspection requested via mobile web by rustin
|
BLD-Conference | 7/11/2012 | 7/12/2012 | 7/12/2012 | A | PART |
Jim Storey
|
|
|
JOEL Phone #: ###-#### east n/s stair fire riser rm fire stop fan protection/
|
BLD-Other | 7/9/2012 | 7/10/2012 | 7/11/2012 | A | DEFR |
Jim Storey
|
|
|
JOEL Phone #: ###-####
|
BLD-Framing/Rough-in | 6/29/2012 | 7/2/2012 | 7/2/2012 | A | PASS |
Jim Storey
|
|
|
James Phone #: ###-#### conf. ok
|
BLD-Framing/Rough-in | 6/7/2012 | 6/7/2012 | 6/7/2012 | P | PASS |
Jim Storey
|
|
|
joel Phone #: ###-#### interior of n and s stair enclosers fire stopped and ok to finsh gyp.
|
BLD-Framing/Rough-in | 5/23/2012 | 5/23/2012 | 5/23/2012 | P | PASS |
Jim Storey
|
|
|
joel Phone #: ###-#### fire collor assemblies instaled on backsde of 2hr fire wall core board. ok to cover chem side of wall.
|
BLD-Framing/Rough-in | 5/15/2012 | 5/16/2012 | 5/16/2012 | A | FAIL |
Jim Storey
|
|
|
Wall inspection please-Joel Phone #: ###-#### need firecollors on 3" pipes
|
Plan resubmittals received | | | 5/16/2012 | | |
|
|
|
Recieved 2 copies of of letter letter dated 5-14-12 from Paul Marcolina one to Jason Blais and one to Romeo Gervais, 2 copies of NE Stair (FAB Level Framing), (Mezzanine Framing), (Roof Framing), SE Stair (FAB Level Framing), (Mezzanine Framing), (Roof Framing) taken to each inbox
|
BLD-Conference | 5/2/2012 | 5/3/2012 | 5/3/2012 | A | PASS |
Jim Storey
|
|
|
reviewed east stair enclosers for colum pertection that will be in gyp. inlew of splk aplacation. submital aproved and work ok to start to complet stairs on east end of bldg. 301
|
BLD-Other | 4/27/2012 | 4/30/2012 | 4/30/2012 | A | PASS |
Jim Storey
|
|
|
joel Phone #: ###-#### ne fire expantion joint ok to level 30/ framing ok on chem bldg./ exterior wall cover water protection 80 % wip ok.
|
BLD-Final | 4/23/2012 | 4/23/2012 | 4/23/2012 | A | PASS |
Jim Storey
|
|
|
first phase as noted on plan on site ok for temp occ.
|
FIRE-Final Inspection | 4/17/2012 | 4/17/2012 | 4/19/2012 | A | PART |
Forrest France
|
|
|
TCO only for "phase one" at portions of the sub-fab, photo bay and mechanical areas per agreement on record.
|
BLD-Other | 4/10/2012 | 4/12/2012 | 4/12/2012 | A | PART |
Jim Storey
|
|
|
joel Phone #: ###-#### ok for temp in first phase as noted. pending fire insp.
|
BLD-Other | 4/9/2012 | 4/10/2012 | 4/10/2012 | A | PART |
Jim Storey
|
|
|
Drop ceiling -- Joel Phone #: ###-#### cn list w/joel
|
BLD-Final | 4/4/2012 | 4/5/2012 | 4/9/2012 | P | NR |
Jim Storey
|
|
|
for temp//Joel Hartman Phone #: ###-####
|
FIRE-Final Inspection | 4/5/2012 | 4/6/2012 | 4/6/2012 | P | CANC |
Forrest France
|
|
|
Overbooked
|
FIRE-Final Inspection | 4/5/2012 | 4/5/2012 | 4/5/2012 | P | NR |
Forrest France
|
|
|
|
BLD-Final | 4/2/2012 | 4/3/2012 | 4/4/2012 | P | NR |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 3/30/2012 | 4/2/2012 | 4/2/2012 | P | NR |
Forrest France
|
|
|
|
BLD-Final | 3/30/2012 | 4/2/2012 | 4/2/2012 | P | DEFR |
Jim Storey
|
|
|
joel Phone #: ###-####
|
BLD-Final | 3/28/2012 | 3/29/2012 | 3/30/2012 | P | NR |
Jim Storey
|
|
|
joel Phone #: ###-#### fab level 20 exiting not ready.
|
BLD-Final | 3/27/2012 | 3/28/2012 | 3/28/2012 | P | PART |
Jim Storey
|
|
|
JOEL (TEMP OCC) Phone #: ###-#### c/n on stairs complet for gyp protection./ pending nw mez tube steel at fire alarm panel// fire door glazing to be instaled.
|
BLD-Final | 3/23/2012 | 3/26/2012 | 3/26/2012 | P | PART |
Jim Storey
|
|
|
Joel Phone #: ###-#### walk through temp exit path and requriments. list w/jol// walked throug with special insp as to temp sign off documantation.
|
BLD-Framing/Rough-in | 3/23/2012 | 3/23/2012 | 3/23/2012 | P | PART |
Jim Storey
|
|
|
joel Phone #: ###-#### wip on both stair enclosers
|
Print Pending Permit.LaserJet4 | | | 3/23/2012 | | |
|
|
|
|
Case Summary (BLD) | | | 3/23/2012 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/23/2012 | | |
|
|
|
|
BLD-Framing/Rough-in | 3/19/2012 | 3/20/2012 | 3/20/2012 | A | PART |
Jim Storey
|
|
|
Joel-walls framing Phone #: ###-#### sw stair interior ok 2 locations membrane repair/ c/n to address 1604.9 as to atchment of raised floor sys to waffel deck.
|
BLD-Conference | 3/16/2012 | 3/16/2012 | 3/16/2012 | P | PART |
Jim Storey
|
|
|
meet with paul m. reviewed alternet stair provisions and fire spk submital w/fire planreview notes. Fire p.e. is on board with providing a clear submital back to the city. A adendem to clearify the aprovals grated by fire and bld officials for clearity will be also submited.
|
Routing - PLAN CHECK | 2/24/2012 | | 3/16/2012 | | PASS |
Dan Stuart
|
|
|
deferred submittals for chem bldg
|
Routing Off Site - STRUCTURAL | 3/15/2012 | | 3/16/2012 | | PASS |
Dan Stuart
|
|
|
E-mail from outsource structural engineer plan review approving resubmittals and approving strcutural plan review. Copy attached to permit.
|
Telephone call | | | 3/15/2012 | | |
|
|
|
3-15-12 called Action Couriers for pick up.
|
BLD-Wall cover | 3/12/2012 | 3/12/2012 | 3/12/2012 | P | NR |
Jim Storey
|
|
|
joel hartman
|
BLD-Wall cover | 3/8/2012 | 3/9/2012 | 3/9/2012 | A | PART |
Jim Storey
|
|
|
joel Phone #: ###-#### beam protection and firestopping on going in west n/s stair enclosers.
|
BLD-Conference | 3/8/2012 | 3/9/2012 | 3/9/2012 | A | PASS |
Jim Storey
|
|
|
to meet w/psp arch/micron arch/ contractor. resubmital to be drawn for east firebarior wall lines as well as locations of fire spk col. protection.
|
BLD-Wall cover | 3/8/2012 | 3/8/2012 | 3/8/2012 | A | PASS |
Jim Storey
|
|
|
3hr wall at dock s side gyp ok for cover/ fire expantion joint being instaled and will insp. fri.
|
BLD-Conference | 3/7/2012 | 3/7/2012 | 3/7/2012 | A | PART |
Jim Storey
|
|
|
reviewed 3 hr wall at dock reorintation of gyp in progress. walked north and south stairs beam wrap of vertical sopport north south side of encloser complet as well as lid at landing/ south fab level beam wrap in progress.
|
Routing Off Site - STRUCTURAL | 2/24/2012 | | 3/6/2012 | | FAIL |
Jason Blais
|
|
|
Failed structural review. Structural plan review report sent to Paul Marcolina of Micron.
|
BLD-Conference | 3/5/2012 | 3/5/2012 | 3/5/2012 | P | PART |
Jim Storey
|
|
|
ask to walk stairs sw and nw/ will see if details for const. are avalable for review. reviewed ares to be protected with fb.
|
BLD-Conference | 3/2/2012 | 3/2/2012 | 3/2/2012 | A | PASS |
Jim Storey
|
|
|
review of vertacal protection locations and type of aplacation.mark up of all locations w/walk thru. to verify spk design to be submitted to the city.
|
BLD-Conference | 3/1/2012 | 3/1/2012 | 3/1/2012 | A | PASS |
Jim Storey
|
|
|
framing of coreboard ceilling of sw stair ok for aplacation of face gyp to be called in for atchment insp. upon starting progrestion.vertical shaftwall at top of sw stair at chase ok for cover./ 3 hr wall at link/dock of 24 reviewed as to how to instal per aproved details.
|
BLD-Conference | 2/29/2012 | 2/29/2012 | 2/29/2012 | P | DEFR |
Jim Storey
|
|
|
test to use insp. program w/hold on proj.
|
Additional plans submitted | | | 2/23/2012 | | DONE |
Tisha Gallop
|
|
|
received deferred submittals for chem building, stampled and routed to Dan Stuart.
|
Case Summary (BLD) | | | 2/15/2012 | | DONE |
|
|
|
|
BLD-Conference | 1/31/2012 | 1/31/2012 | 2/6/2012 | P | PASS |
Jim Storey
|
|
|
|
Print Occupancy Form | | | 1/30/2012 | | DONE |
|
|
|
|
Issue & PRINT to be Invoiced | | | 12/30/2011 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/23/2011 | | PASS |
|
|
|
|
Plan assigned to (DRS) | 10/31/2011 | | 12/23/2011 | | PASS |
Dan Stuart
|
|
|
Plan reassigned to Dan Stuart.
|
Routing - PLAN CHECK | 6/17/2011 | | 12/23/2011 | | PASS |
Dan Stuart
|
|
|
Plans approved as noted and attached to plans of all reviewing agencies and the Deferred submittal iems attached to plans.
|
Plan resubmittals received | | | 12/16/2011 | | DONE |
Tisha Gallop
|
|
|
Received two full sets of composite drawings.
|
Plan resubmittals received | | | 12/13/2011 | | DONE |
Tisha Gallop
|
|
|
Received two full composite sets of plans; sheets Cover, A1000, A1050, A1060, A1500, A2000, A2010, A2020, A2030, A2040, A2050, A2060, A3000, A3030, A3040, A3050, A3060, A4000, A4010, A4030, A5001, A5503, -6001, A6002, A6003, A3004, A6501, A6502, A6503, A6504, A6701, A6702, A6703, A6704, A6705, A6706, A6707, A7001, A7101, A7102, A7103, A7104, A7501, A7502, A7701, A7801, AC1000, AC1030, AC2000, AC2010, AC2030, AC2050, AC2060, AS1500, C0.0, C0.1, C1.0, C1.1, C1.2, C2.1, C3.0, C3.1, C3.2, C4.0, C4.1, C5.0, C5.1, EF2000, EF2010, EF2030, EF2040, EG2000, EL1030, EL1040, EL1050, EL1060, EL1510, EL2010, EL2020, EL2030, EL2040, EL2050, EL2060, EL3000, EL3030, EL3040, EL3050, EL3060, EO8001, EO8002, EO8003, EO8004, EO8005, EO8006, EO8007, EO8008, EO8011, EP1010, EP1030, EP1040, EP1050, EP1060, EP1510, EP2010, EP2020, EP2030, EP2040, EP2050, EP2060, EP3030, EP3040, EP3050, EP3060, EP4040, EP4050, EP4060, EQ1040, EQ1050, EQ1060, EQ2030, EQ2050, EQ2060, EQ3060, ER2050, G0001, GL0001, GL2000, GL3000, M3001, M6002, M9004, M9005, M9006, MH1030, MH2010, MH2030, MH2050, MH2060, MH3030, MH3040, MH3050, MH3060, MP1030, MP2030, MP3030, MP3050, MP3060, PD9001A, PD9001B, PD9060A, PD9060B, PD9060C, PD9061A, PD9061B, PD9061C, PD9062, PD9064A, PD9064B, PD9064C, PD9066A, PD9068, PD9071, PD9072, PD9073, PE1000, PE1041, PE2000, PE2041, PE2042, PE3000, PE3041, PE4000, PE4041, PL1001, PL2007, PL3000, PL4001, S0001, S0004, S1200, S1230, S1240, S1250, S1260, S1500, S1510A, S1520A, S1530, S1550A, S2510A, S3400, S3430, S3440, S3450, S3460, S3500, S3510A, S3530, S3550, S3560, S3600, S3630, S3640, S3650, S3660, S4000, S4030, S4050, S4060, S7001, S7002, S8023, S8025, S8504, S8505, S8509, S8510, S8525; taken to Dan Stuartl
|
Plan resubmittals received | | | 11/2/2011 | | |
|
|
|
Received 1 cover transmittal, 1 copy of letter to Romeo Gervais & Jason Blais dated 11-1-11 from John Velikoff, 2 copies of sheet A-7501 and taken to Jason Blais
|
Plan assigned to (JCM) | | 4/21/2011 | 10/31/2011 | | DEFR |
John Menard
|
|
|
Plan reassigned to Dan Stuart.
|
Plan resubmittals received | | | 10/26/2011 | | |
|
|
|
10-25-11 received 1 letter of transmittal, 2 mechanical com check,2 exterior lighting com check,and 2 copies of sheets A-2510,A-3000,A-3030,GL-0001,& GL3000 sent to Jason B.
|
Plan Reviewer's activity | | | 10/26/2011 | | FAIL |
|
|
|
Only remaining item to be addressed is protection of steel columns and beams supporting the 1-hour stair enclosure. Paul Marcolina working on providing means of protection for code compliance
|
Plan Reviewer's activity | | | 10/25/2011 | | FAIL |
|
|
|
Some items of original plan review by John Menards are still being resolved. Resubmittals required. Paul marcolina alerted to remaining items in question.
|
Plan resubmittals received | | | 10/24/2011 | | DONE |
Christina Prado
|
|
|
Received one transmittal letter; two copies of response to fire wall construction, including drawings; and two copies of the following plans marked A-1510, A-2010, A-2040, A-2510, A-6004, A-7001, A-7102, A-7103, A-7502 & AC-2010. Given to Dan Stuart for review
|
Plan Reviewer's activity | | | 10/14/2011 | | FAIL |
|
|
|
Resubmittals of 10/4/11were incomplete. Resubmittals required. Arranged to meet with Paul Marcolina & Ron Hill to discuss.
|
Plan Reviewer's activity | | | 10/13/2011 | | DONE |
|
|
|
Went to job site with Jim Storey to become familiar with project. Reviewed outstanding items of 3 hour fire wall location, mechanical mezzanine, accessibility to mechanical basement under main floor fab and the fire rating of support structure for stair enclosure.
|
Plan resubmittals received | | | 10/7/2011 | | DONE |
Tisha Gallop
|
|
|
received envelope complaince certificate, Plan Review response #2, Alternate propsal for Fire wall, Alternat proposal for house vaccuum details, plan review response regarding accessible routes, two copies of Test Reports book and plan sheets A-5503, A-6701, A-6702, A-6703, A-6704, A-6707, A-7101, A-7501; taken by Ron Hill.
|
Plan resubmittals received | | | 9/23/2011 | | DONE |
Tisha Gallop
|
|
|
received Alternate Proposal; taken to Jason Blais.
|
Plan resubmittals requested | | | 8/20/2011 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the second plan review comment list requesting additional revisions. JCM
|
Plan resubmittals requested | | | 8/16/2011 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural review for the foundation of the proposed chemical building addition. JCM
|
Routing Off Site - STRUCTURAL | 8/5/2011 | | 8/15/2011 | | PASS |
John Menard
|
|
|
additional plans - Received comment list from consulting structural engineer for the chemical building addition foundation review requesting revisions. JCM
|
Telephone call | | | 8/5/2011 | | |
|
|
|
called Action Couriers for pick up.
|
Plan resubmittals received | | | 8/5/2011 | | DONE |
Tisha Gallop
|
|
|
received three copies of response with attachments and three copies of plan sheets A2010, A2020, A2050, A2510, A2530, A5503, A6701, A6702, A6703, A6704, A6705, A6706, A6707, A7001, A7501, GL2000, PL1001, PL2001, PL3001
|
Additional plans submitted | | | 8/5/2011 | | DONE |
Tisha Gallop
|
|
|
Additional plans submitted, three copies of Structural Calculations and plan sheets Cover, G-0001, GL-2000, C0.0, C0.1, C1.0, C1.1, C1.2, C2.0, C2.1, C3.0, C3.1, C3.2, C4.0, C4.1, C5.0, C5.0, C6.0, S-0001, S-0004, S-1500, S-1530, S-3500, S-3530, S-7001, S-7002, S-8011, S-8012, S-8516, S-8517, AS-1500, A-1500, A-1530, A-2000, A-2030, A-3000, A-3030, A-4000, A-4030, A-5001, A-6003, A-6004, A-6701, A-7501, A-7701, EG-2000; taken to John Menard.
|
Routing - FIRE | | | 7/1/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Plan resubmittals received | | | 6/30/2011 | | DONE |
Scott Arellano
|
|
|
Recieved additional plan information from Paul Marcolina via email.
|
Routing - FIRE | 6/15/2011 | 6/15/2011 | 6/17/2011 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to architect.
|
Routing Off Site - STRUCTURAL | 6/10/2011 | | 6/17/2011 | | PASS |
John Menard
|
|
|
Called Action Courier for pick up - Received e-mail from consulting structural engineer approving final requested revisions. JCM
|
1st review completed | | | 6/17/2011 | | FAIL |
|
|
|
Failed, Structural, Plan Check, Fire
|
Route to Impact Fee Review | 6/15/2011 | 6/20/2011 | 6/16/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 5/4/2011 | | 6/15/2011 | | FAIL |
John Menard
|
|
|
|
Plan resubmittals received | | | 6/9/2011 | | |
|
|
|
Received 3 copies of sheet S-1500, S-1540, S-3500, S-3540, S-8502, S-8503, S-8506, GL-2000, 3 copies of structural calculation packets, 3 copies of letter to Jason Blais & Ron Amandus from Ron Menard, 3 copies of response comments from David Brown dated 6-3-11- all this was given to Ron Hill.
|
Routing Off Site - STRUCTURAL | 5/13/2011 | | 5/27/2011 | | FAIL |
John Menard
|
|
|
Received comment list from consulting structural engineer requesting revisions. JCM
|
Plan resubmittals requested | | | 5/27/2011 | | DONE |
John Menard
|
|
|
E-mailed Paul Marcolina a copy of the structural review requesting additional revisions. JCM
|
Telephone call | | | 5/13/2011 | | DONE |
Christina Prado
|
|
|
Called Action Couriers for pick-up
|
Plan resubmittals received | | | 5/12/2011 | | DONE |
Christina Prado
|
|
|
Received threee copies of structural calcs and plans S-3500, S-3530 and S-3540. Sheets inserted by arch rep adn taken to John Menard for review
|
Routing - PLUMBING | 4/27/2011 | | 5/6/2011 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Plan resubmittals requested | | | 5/5/2011 | | DONE |
John Menard
|
|
|
E-mailed Paul Marcolina a copy of the structural review comments requesting revisions. JCM
|
Plan resubmittals received | | | 5/4/2011 | | DONE |
Christina Prado
|
|
|
Receive two set of plans PP-1000, PP-1032, PP-1034, PP-1041, PP-1042, PP-1043PP-1044, PP-1500, PP-1512, PP-1514, PP-1532, PP-2500, PP-2512, PP-1214, &PP-2532. After speaking to Ron Hill, plans being held at front counter for plumbing review with Bill before being inserted
|
Routing Off Site - STRUCTURAL | 4/21/2011 | | 5/4/2011 | | FAIL |
John Menard
|
|
|
Received comment list from consulting structural engineer requesting revisions. JCM
|
Routing - PLANNING | 5/3/2011 | | 5/3/2011 | | PASS |
Sarah Schafer
|
|
|
|
Telephone call | | | 5/3/2011 | | PASS |
Bill VanDegrift
|
|
|
talked to Paul Marcolina with Micron, He is sending some additional plans for review with potable water system information.
|
Plan resubmittals received | | | 5/2/2011 | | DONE |
Tisha Gallop
|
|
|
received memo and table for Hazard Classification and Chemical Quantity Summary for Bldg 50; taken to John Menard.
|
Routing PW Environmental | 4/22/2011 | | 4/29/2011 | | PASS |
Walt Baumgartner
|
|
|
Mike Hunter reviewed.
|
Routing PW Sewer Rating | 4/27/2011 | | 4/27/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 4/21/2011 | | 4/27/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 4/27/2011 | | 4/27/2011 | | CANC |
Steven Webb
|
|
|
Current CMC 8-17 Exempts Micron from securing an ESC permit because they are holders of a MSGP permit.
|
Routing PW Drainage | 4/22/2011 | | 4/25/2011 | | PASS |
Brian Murphy
|
|
|
|
Routing - Addressing | 4/22/2011 | | 4/22/2011 | | PASS |
April Wing
|
|
|
|
Telephone call | | | 4/21/2011 | | DONE |
Christina Prado
|
|
|
Called Action Couriers for pick up 9:30 a.m.
|
Plans ACCEPTED BY PLAN TECH | | | 4/20/2011 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/20/2011 | | DONE |
Christina Prado
|
|
|
|
Application received | | 4/20/2011 | | | |
|
|
|
|