Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD11-00824
StatusFinaled
Name BERMENSOLO CONSTRUCTION
Site Address 1511 N 9TH ST
Project NameLongfellow Elementary School
Customer Number 
ePlanReviewNo
Description
LONGFELLOW ELEMENTARY - RELOCATE PORTABLE CLASSROOM BUILDING- Portable Classroom #107 - Relocate a 912 sq. ft. portable school classroom, that was last permitted for original South Junior High, 805 Shoshone, under certificate of occupancy #04327and State of Idaho Tag #90557 A & B as a Type V-N Construction, "E1" occupancy use group, to new location at 1511 N 9th, Longfellow Elementary. Scope of work includes set up and anchoring per engineering & plans; to construct a new aluminum ramp, platform, stairs, handrails and edge protection systems providing shared accessibility access compliance for two relocatable classrooms. See BLD11-00825 for 2nd relocatable. There are no plumbing facilities in this unit. An existing accessible route from this relocated unit to the existing Multi-Purpose Building will provide access to existing restrooms facilities for students and staff. There are no changes to the existing building envelope beyond maintenance of siding & finish. Existing interior lighting fixtures to remain with changing of lamps and ballasts as allowed in 2009 IECC, Sec 101.4.3, Exc. #8. New battery pack exit sign and emergency lighting for interior room and at exterior landings being installed. Separate application, plans & permits for alarm system required as regulated by fire department. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 9/2/20128/28/2012 DONE
Print Statement  8/28/2012 DONE
DetailsTisha Gallop
First Notice 7/7/20128/23/2012 DONE
DetailsChristina Prado
faxed
BLD-Final6/27/20126/27/20126/27/2012PPASS
DetailsTony Young
TOM Phone #: ###-####
Print Occupancy Form  6/27/2012 DONE
DetailsChristina Prado
Print Occupancy Form  6/27/2012 DONE
DetailsChristina Prado
Permanent Occupancy  6/27/2012 DONE
DetailsChristina Prado
FIRE-Final Inspection6/22/20126/22/20126/22/2012PPASS
DetailsForrest France
Fire life safety inspection completed acceptable.
FIRE-Final Inspection5/25/20125/25/20125/25/2012PPART
DetailsForrest France
Project related fire alarm work to be finaled prior to fire life safety approvals.
BLD-Framing/Rough-in4/23/20124/23/20124/23/2012PPART
DetailsTony Young
tom Phone #: ###-####,, hold down and skirting ok pending electrical ok
Plan Reviewer's activity  3/13/2012 DONE
DetailsJason Blais
Extension request letter provided early. Letter indicates the work should be completed by June 30, 2012.
Override - Parcel Holds  3/13/2012  
Extend Review Timeline  3/13/2012 DONE
Issue PAID IN FULL permit  5/25/2011 DONE
DetailsBarbara Stitt
1st review completed  5/5/2011 PASS
Routing - PLAN CHECK5/5/2011 5/5/2011 PASS
DetailsDan Stuart
Plans routed back from fire review. Plans to permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  5/5/2011 PASS
Print Occupancy Form  5/5/2011 DONE
Permit Ready to Issue  5/5/2011 DONE
DetailsTisha Gallop
Telephone call  5/5/2011 DONE
DetailsTisha Gallop
called and left vm for Richard Honsinger that permit is ready, fees, need GC/form & RP
Routing - FIRE5/4/2011 5/5/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
Plan assigned to (DRS)4/26/2011 5/5/2011 PASS
DetailsDan Stuart
Routing - PLANNING5/3/2011 5/4/2011 PASS
DetailsDavid Moser
CUP11-00022-David Moser
Routing - PLAN CHECK5/4/2011 5/4/2011 PASS
DetailsDan Stuart
No resubmittals required. Plan review comments attached to plans. Plans routed to fire code analyst for review.
Routing - Erosion and Sediment5/2/2011 5/3/2011 PASS
DetailsSteven Webb
ESC plan waiver request is approved according to the ESC permit conditions. ESC11-00233
Routing - PLUMBING5/3/2011 5/3/2011 PASS
DetailsBill VanDegrift
no plumbing
Routing - PUBLIC WORKS4/25/2011 5/2/2011 PASS
DetailsConnie Baumgartner
Routing PW Drainage4/26/2011 5/2/2011 PASS
DetailsBrian Murphy
Routing PW Sewer Rating5/2/2011 5/2/2011 PASS
DetailsConnie Baumgartner
Plan resubmittals received  5/2/2011  
DetailsBarbara Stitt
Received 1 cover transmittal and 1 copy of sheet a1.11 and taken to Brian Murphy's desk
Telephone call  4/26/2011 DONE
Message sent to Jason Blais to see if the school district could move the modular unit to the proposed site. Jason indicated the Conditional Use Permit has been approved. I called and talked with Richard Hosinger. Units would be moved into proposed location, set on blocks and fenced to keep children away while plans continue to circulate to assigned plan review agencies. Applicant is proceeding at there own risk without any guarantee that a permit will be issued. Had John menard assign plans to me (Dan Stuart).
Plan assigned to (JCM)4/22/2011 4/26/2011 DONE
DetailsJohn Menard
Reassigned to Dan Stuart
Routing - PLANNING Land Div4/22/2011 4/25/2011 PASS
DetailsTodd Tucker
Routing - Addressing4/25/2011 4/25/2011 PASS
DetailsTerry Records
Pending Assignment by JCM4/22/2011 4/22/2011 DONE
DetailsJohn Menard
Recd Pcfee & Taken To Pln CK  4/22/2011 DONE
DetailsChristina Prado
Application received 4/21/20114/21/2011 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  4/21/2011 DONE
DetailsBarbara Stitt
Intake Approval  4/21/2011 PASS
DetailsBarbara Stitt