First Notice | | 3/9/2012 | 3/16/2012 | | DONE |
|
|
|
|
BLD-Final | 2/28/2012 | 2/28/2012 | 2/28/2012 | A | PASS |
Tom Arcoraci
|
|
|
|
Permanent Occupancy | | | 2/28/2012 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Conference | 2/15/2012 | 2/17/2012 | 2/17/2012 | P | PASS |
Tom Arcoraci
|
|
|
>> Inspection requested via web by bryan everman
|
BLD-Final | 2/16/2012 | 2/17/2012 | 2/17/2012 | A | PART |
Tom Arcoraci
|
|
|
>> Inspection requested via web by bryan everman
|
BLD-Final | 2/16/2012 | 2/16/2012 | 2/16/2012 | P | PART |
Tom Arcoraci
|
|
|
>> Inspection requested via web by bryan everman spec insp and eng sign off ok when elec final and front doors installed ok for perm occ ok for temp
|
FIRE-Final Inspection | 2/16/2012 | 2/16/2012 | 2/16/2012 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Alarm Testing | 2/15/2012 | 2/16/2012 | 2/16/2012 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 2/15/2012 | 2/16/2012 | 2/16/2012 | A | CANC |
Troy Cobbley
|
|
|
>> Inspection requested via web by bryan everman Inspection cancelled from web by: bryan everman
|
FIRE-Final Inspection | 2/15/2012 | 2/16/2012 | 2/16/2012 | P | CANC |
Troy Cobbley
|
|
|
>> Inspection requested via web by bryan everman Inspection cancelled from web by: bryan everman
|
FIRE-Final Inspection | 2/15/2012 | 2/17/2012 | 2/16/2012 | A | CANC |
Troy Cobbley
|
|
|
>> Inspection requested via web by bryan everman Inspection cancelled from web by: bryan everman
|
FIRE-Final Inspection | 2/15/2012 | 2/15/2012 | 2/16/2012 | P | FAIL |
Troy Cobbley
|
|
|
Need the project related fire alarm and fire sprinkler permits addressed. Need the building address posted and the signage provided for the fire sprinkler and fire alarm control panel rooms posted. Need to verify that Chad mounted the knox box.
|
Temporary Occupancy | 2/16/2012 | 5/16/2012 | 2/16/2012 | | DONE |
Christina Prado
|
|
|
|
FIRE-Alarm Testing | 2/15/2012 | 2/15/2012 | 2/15/2012 | P | DONE |
Troy Cobbley
|
|
|
The fire alarm testing is complete except for a copy of the signal reports.
|
Zoning Approval | 2/14/2012 | 2/14/2012 | 2/14/2012 | | DONE |
Cody Riddle
|
|
|
|
BLD-Other | 1/30/2012 | 1/30/2012 | 1/30/2012 | P | PASS |
Tom Arcoraci
|
|
|
ceiling cover Phone #: ###-#### >> Inspection requested via web by bryan everman
|
BLD-Wall cover | 12/29/2011 | 12/29/2011 | 12/29/2011 | P | PASS |
Jim Storey
|
|
|
Main entry soffit framing Phone #: ###-#### >> Inspection requested via web by bryan everman
|
BLD-Wall cover | 12/15/2011 | 12/15/2011 | 12/15/2011 | P | PASS |
Tom Arcoraci
|
|
|
west side and entry >> Inspection requested via web by bryan everman
|
BLD-Wall cover | 12/1/2011 | 12/2/2011 | 12/2/2011 | P | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### >> Inspection requested via web by bryan everman
|
BLD-Wall cover | 11/30/2011 | 11/30/2011 | 11/30/2011 | P | PASS |
Tom Arcoraci
|
|
|
Shear walls and south east corner of building Phone #: ###-#### >> Inspection requested via web by bryan everman needs anchor bolts tma
|
BLD-Other | 11/23/2011 | 11/28/2011 | 11/28/2011 | P | CANC |
Tom Arcoraci
|
|
|
Shear wall inspection Phone #: ###-#### >> Inspection requested via web by bryan everman Inspection cancelled from web by: bryan everman
|
BLD-Framing/Rough-in | 11/16/2011 | 11/17/2011 | 11/17/2011 | A | PASS |
Tom Arcoraci
|
|
|
ross Phone #: ###-#### north end of north south building ok for cover
|
BLD-Wall Bracing | 11/15/2011 | 11/15/2011 | 11/15/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 11/11/2011 | 11/14/2011 | 11/14/2011 | A | PASS |
Tom Arcoraci
|
|
|
Framing RI and shear nailing and roof nailing Phone #: ###-#### >> Inspection requested via web by bryan everman
|
BLD-Other | 11/11/2011 | 11/14/2011 | 11/14/2011 | P | CANC |
Tom Arcoraci
|
|
|
Exterior wall cover inspection and roof nailing inspection Phone #: ###-#### >> Inspection requested via web by bryan everman Inspection cancelled from web by: bryan everman
|
Plan resubmittals received | | | 11/9/2011 | | DONE |
Tisha Gallop
|
|
|
Received skylight info from architect; taken to Tom A. per his request.
|
BLD-Other | 10/31/2011 | 11/2/2011 | 11/3/2011 | A | PASS |
Tom Arcoraci
|
|
|
ok to wrap
|
BLD-Other | 10/31/2011 | 10/31/2011 | 10/31/2011 | P | PASS |
Tom Arcoraci
|
|
|
Bryan Everman Roof nailing and shear nailing inspection Phone #: ###-#### >> Inspection requested via web by bryan everman
|
BLD-Framing/Rough-in | 10/21/2011 | 10/24/2011 | 10/24/2011 | A | PART |
Tom Arcoraci
|
|
|
bruce Phone #: ###-#### roof ok for cover east side
|
FIRE-Conference | 10/21/2011 | 10/21/2011 | 10/21/2011 | P | DONE |
Troy Cobbley
|
|
|
I stopped at the job site and found that the "dog house" has been provided as well as heat. This temporary set up is acceptable as previously discussed.
|
FIRE-Conference | 10/18/2011 | 10/18/2011 | 10/18/2011 | P | DONE |
Troy Cobbley
|
|
|
I stopped today at Bishop Kelly High School to verify that the "dog house", with heat, had been installed over the sprinkler supply piping. It has not. The piping has been wrapped with concrete blankets which I remember was not an option. The openings along the existing wall are covered with plastic but no heat for the space has been provided.
|
FIRE-Conference | 10/11/2011 | 10/11/2011 | 10/11/2011 | A | DONE |
Troy Cobbley
|
|
|
Romeo Gervais and I met with Chad and Rich Raimondi, with Bishop Kelly, about the need for protection of both the fire sprinkler and fire alarm systems that are exposed to the elements. It was agreed that steps would be taken starting today and completed by the end of the week. Chad said he would follow up with me later in the week at which time I will perform a courtesy inspection.
|
BLD-Framing/Rough-in | 10/10/2011 | 10/10/2011 | 10/10/2011 | P | PART |
Tom Arcoraci
|
|
|
ross Phone #: ###-#### king studs 16 oc screw ok
|
BLD-Footing | 8/26/2011 | 8/29/2011 | 8/29/2011 | A | PART |
Tom Arcoraci
|
|
|
ross - rebar - pouring at 3 Phone #: ###-#### special insp req by plans
|
Meeting | | | 8/11/2011 | | DONE |
|
|
|
Onsite meeting with Fire Marshal, Ron Amandus. See attached meeting summary.
|
Telephone call | | | 8/10/2011 | | DONE |
|
|
|
Spoke with the project architect, Richard Honsinger. I communicated to Richard the Fire Departments concern regarding the current condition and progress toward completion of the required building Fire Protection systems. I informed Richard that the Fire Protection systems serving all occupied portions of the existing building must be installed, inspected, and fully operational before continued occupancy of the building. At this time, no applications for Fire Protection permits, pertaining to the reconnecting of the related alarm components etc, has been submitted to the Planning and Development Services Department. A meeting has been scheduled for 8/11/11 onsite between the Fire Marshal, PDS/Fire manager, PDS/Fire field inspector, General contractor and Architect.
|
Issue PAID IN FULL permit | | | 7/15/2011 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 6/28/2011 | | DONE |
|
|
|
|
Telephone call | | | 6/28/2011 | | DONE |
|
|
|
6-28-11 called Kristin permit ready and fee given Also need ACHD & GC ///dld
|
Routing - Erosion and Sediment | 6/23/2011 | | 6/27/2011 | | PASS |
Clint A Smith
|
|
|
ESC11-00236 plan approved with conditions attached to the permit.
|
Routing - PLAN CHECK | 6/27/2011 | | 6/27/2011 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2011 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 6/27/2011 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 4/22/2011 | | 6/27/2011 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 6/3/2011 | | 6/23/2011 | | PASS |
John Menard
|
|
|
|
Plan Reviewer's activity | | | 6/23/2011 | | PASS |
John Menard
|
|
|
Reviewed and approved structural and nonstructural requested plan revisions. JCM
|
Routing - FIRE | 6/23/2011 | | 6/23/2011 | | PASS |
John Menard
|
|
|
Please, see attached review
|
Plan resubmittals received | | | 6/16/2011 | | DONE |
Christina Prado
|
|
|
Received two copies of response letter; and two sets of plans A0.11, A2.11, A2.51, A5.01, A5.11, A6.11 & E2.01. Plans inserted by Arch Rep and taken back to John Menard for further review.
|
Attached Document | | | 6/15/2011 | | DONE |
Scott Arellano
|
|
|
Request for building Fire Watch while required fire protection systems are impaired during construction. See attached document for details. Request has been approved by the Boise CIty Fire Marshal, Ron Amandus.
|
Route to Impact Fee Review | 5/28/2011 | 6/3/2011 | 6/3/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 5/28/2011 | 5/28/2011 | 6/3/2011 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to architect.
|
1st review completed | | | 6/3/2011 | | FAIL |
|
|
|
Failed Erosion & Soil Control, Structural, Plan Check, Fire
|
Plan resubmittals requested | | | 5/28/2011 | | DONE |
John Menard
|
|
|
E-mailed the arhcitect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 5/4/2011 | | 5/28/2011 | | FAIL |
John Menard
|
|
|
John Menard
|
Plan resubmittals received | | | 5/27/2011 | | DONE |
|
|
|
received 3 copies of response, structural calcs and plans sheets s3.0, s5.0, s5.1
|
Route to Impact Fee Review | 4/22/2011 | 4/27/2011 | 5/25/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Routing Off Site - STRUCTURAL | 5/17/2011 | | 5/24/2011 | | FAIL |
John Menard
|
|
|
Received comment list from consulting engineer requesting additional structural revisions. JCM
|
Plan resubmittals requested | | | 5/24/2011 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the second structural review requesting revisions. JCM
|
Telephone call | | | 5/17/2011 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Plan resubmittals received | | | 5/13/2011 | | DONE |
Tisha Gallop
|
|
|
Received three copies of structural response, calculations, plan sheets a2.11, s1.00, s2.00, s3.00, s4.00, s5.00, s5.01; inserted by architect and taken back to John Menard
|
Plan resubmittals requested | | | 5/4/2011 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural review comments requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 4/22/2011 | | 5/4/2011 | | FAIL |
John Menard
|
|
|
Received comment list from consulting structural engineer requesting revisions. JCM
|
Routing - PLANNING | 5/3/2011 | | 5/4/2011 | | PASS |
Cody Riddle
|
|
|
CUP11-00017 Cody Riddle
|
Routing - PLUMBING | 4/28/2011 | | 5/3/2011 | | PASS |
Bill VanDegrift
|
|
|
additional cross connection may be required at VB-1.
|
Plan resubmittals received | | | 5/3/2011 | | |
Barbara Stitt
|
|
|
Received cover transmital, ESC application, and 2 copies of esc control plan and inserted into plans
|
Routing - Erosion and Sediment | 4/27/2011 | | 4/28/2011 | | FAIL |
Steven Webb
|
|
|
Does not meet PD class or BMC 8-17 requirements. Informed PD that a re-submital is needed. ESC11-00236
|
Routing - PUBLIC WORKS | 4/22/2011 | | 4/27/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 4/25/2011 | | 4/27/2011 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Rating | 4/27/2011 | | 4/27/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 4/22/2011 | 4/22/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/22/2011 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/22/2011 | | DONE |
Tisha Gallop
|
|
|
|
Pending Assignment by JCM | 4/22/2011 | | 4/22/2011 | | DONE |
John Menard
|
|
|
|
Routing - PLANNING Land Div | 4/22/2011 | | 4/22/2011 | | PASS |
Dave Abo
|
|
|
Parcel over 5 acres in size.
|
Telephone call | | | 4/22/2011 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Routing - Addressing | 4/22/2011 | | 4/22/2011 | | PASS |
Terry Records
|
|
|
|