Permit Information
Permit NumberBLD11-00849
StatusFinaled
Name SILVER LEAF CONSTRUCTION
Site Address 2609 N ASH PARK LN
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the addition of 705s.f. to an existing 2890s.f. 1-story single family dwelling. R-1C ok per Joan Johnson. Separate electrical, plumbing, mechanical and ESC permits are required. All per the approved plans as marked Energy component method and the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/12/20119/12/20119/12/2011PPASS
DetailsJim Sly
jim Phone #: ###-####
C/C issued
DOC - Permit Finaled9/12/20119/12/20119/12/2011PPASS
DetailsJim Sly
BLD-Energy code compliance6/17/20116/20/20116/20/2011APART
DetailsJim Sly
Insulation is complete. Ready for cover Phone #: ###-#### >> Inspection requested via web by Jim Silsby
East 1/2f of building only.
BLD-Framing/Rough-in6/9/20116/9/20116/9/2011PPASS
DetailsJim Sly
Jim Phone #: ###-####
BLD-Foundation5/2/20115/3/20115/3/2011PPASS
DetailsJim Sly
Forms for stem walls will be ready for inspection at 1PM. Phone #: ###-#### >> Inspection requested via web by Jim Silsby
BLD-Footing5/1/20115/2/20115/2/2011APASS
DetailsJim Sly
Request footing inspection after 10 AM and before noon. Footing pour is scheduled for 2 pm. Inspection card, if needed, is inside residence. Thanks, Jim S. Phone #: ###-#### >> Inspection requested via web by Jim Silsby
OVERRIDE  4/26/2011  
Issue PAID IN FULL permit  4/26/2011 DONE
DetailsChristina Prado
Permit Ready to Issue  4/26/2011 DONE
DetailsChristina Prado
Routing Walk-In (Zoning)4/25/20114/25/20114/25/2011PPASS
DetailsJoan Johnson
Routing Walk-In (BLD)4/25/20114/25/20114/25/2011PDONE
DetailsPerry Paine
Plan assigned to (PEP)4/25/20114/25/20114/25/2011 PASS
DetailsPerry Paine
Case Summary (BLD)  4/25/2011  
Inspection Record Card- Bld  4/25/2011  
1st review completed  4/25/2011 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/25/2011 DONE
Application received 4/25/2011