BLD-Final | 11/22/2011 | 11/23/2011 | 11/23/2011 | A | PASS |
Jim Sly
|
|
|
call when on way//Robin Phone #: ###-####
|
DOC - Permit Finaled | 11/23/2011 | 11/23/2011 | 11/23/2011 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 10/21/2011 | 10/21/2011 | 10/21/2011 | P | PASS |
Jim Storey
|
|
|
robin - please call 1/2 hr prior Phone #: ###-####
|
BLD-Framing/Rough-in | 10/21/2011 | 10/21/2011 | 10/21/2011 | P | PASS |
Jim Storey
|
|
|
robin - please call 1/2 hr prior Phone #: ###-####
|
BLD-Framing/Rough-in | 10/14/2011 | 10/17/2011 | 10/17/2011 | A | PART |
Jim Storey
|
|
|
robin - please call 1/2 hr prior so she can meet you there Phone #: ###-#### strap each end of gider truss new wall to existing wall const. at top plate/ foam and chalk and foam top plate penatrations / sole plate to sub floor. ok to insulate.
|
BLD-Footing | 9/29/2011 | 9/29/2011 | 9/29/2011 | P | PASS |
Jim Storey
|
|
|
ryan Phone #: ###-####
|
OVERRIDE | | | 5/11/2011 | | |
|
|
|
|
OVERRIDE | | | 5/11/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 5/11/2011 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 5/11/2011 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 5/11/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing Walk-In (BLD) | 5/10/2011 | 5/10/2011 | 5/10/2011 | P | DONE |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 5/10/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/10/2011 | | |
|
|
|
|
1st review completed | | | 5/10/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/10/2011 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 5/4/2011 | 5/4/2011 | 5/4/2011 | P | FAIL |
Perry Paine
|
|
|
need floor plan of level affected.
|
Plan assigned to (PEP) | 4/26/2011 | 4/26/2011 | 4/29/2011 | | FAIL |
Perry Paine
|
|
|
|
Routing Walk-In (PW Hillside) | 4/26/2011 | 4/26/2011 | 4/26/2011 | P | PASS |
Jim Wyllie
|
|
|
Entire lot is level. Therefore no hillside requirements apply.
|
Routing Walk-In (Zoning) | 4/26/2011 | 4/26/2011 | 4/26/2011 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 4/26/2011 | 4/26/2011 | 4/26/2011 | P | FAIL |
Perry Paine
|
|
|
|
1st review completed | | | 4/26/2011 | | FAIL |
|
|
|
|
Application received | | 4/26/2011 | | | |
|
|
|
|