Third Notice | | 12/21/2011 | 12/13/2011 | | DONE |
|
|
|
|
Third Notice | | 12/5/2011 | 12/7/2011 | | DONE |
|
|
|
mailed
|
Third Notice | | 11/12/2011 | 11/21/2011 | | DONE |
|
|
|
faxed
|
Second Notice | | 10/29/2011 | 11/7/2011 | | DONE |
Christina Prado
|
|
|
faxed 11-7-11
|
First Notice | | 10/10/2011 | 10/19/2011 | | DONE |
|
|
|
|
Permanent Occupancy | | | 9/30/2011 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 9/27/2011 | 9/29/2011 | 9/29/2011 | P | PASS |
Dave Hannah
|
|
|
John Phone #: ###-#### ok for perm occ
|
FIRE-Final Inspection | 9/27/2011 | 9/29/2011 | 9/29/2011 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. The maintenance chief and I spoke about the importance of getting the annual testing performed on the building fire alarm system.
|
Change Expiration Date Only | | | 9/29/2011 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Framing/Rough-in | 8/23/2011 | 8/23/2011 | 8/23/2011 | A | PASS |
Dave Hannah
|
|
|
john - please coordinate with dixie Phone #: ###-#### ok to install fire dampers
|
BLD-Framing/Rough-in | 8/22/2011 | 8/22/2011 | 8/23/2011 | P | PART |
Dave Hannah
|
|
|
john - please coordinate with dixie Phone #: ###-#### still working on framing for fire dampers
|
BLD-Final | 7/13/2011 | 7/14/2011 | 7/15/2011 | P | PART |
Dave Hannah
|
|
|
requesting temp final as per meeting of last week. Phone #: ###-#### >> Inspection requested via web by John Lodman ok for temp occ pending completion of corridor rating work as per upgrade agreement.
|
Temporary Occupancy | 7/15/2011 | 10/13/2011 | 7/15/2011 | | DONE |
Barbara Stitt
|
|
|
|
Office Staff conference/action | | | 7/15/2011 | | DONE |
Barbara Stitt
|
|
|
Per Dave Hannah no Mecanical or Plumbing permits required//7-15-11//BAS
|
FIRE-Final Inspection | 7/13/2011 | 7/14/2011 | 7/14/2011 | P | PASS |
Forrest France
|
|
|
Fire life safety passed.
|
BLD-Other | 7/11/2011 | 7/11/2011 | 7/11/2011 | P | PART |
Dave Hannah
|
|
|
request approval to cover tenant side of rated wall. fire/smoke dampers required by plan mod will be implemented after TCO as per 7/8 conference with Storey and Forrest France. perimeter clips will be installed with ceiling tile. please call. thank you. Phone #: ###-#### >> Inspection requested via web by John Lodman Ok to cover
|
(F) Reprint permit | | | 7/11/2011 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/11/2011 | | |
|
|
|
|
Telephone call | | | 7/6/2011 | | DONE |
|
|
|
t/c w tegan - permit (plan mod) ready and fees given
|
Override - Parcel Holds | | | 7/6/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 7/6/2011 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/5/2011 | | 7/5/2011 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/5/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 7/5/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 7/5/2011 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 6/24/2011 | | 7/5/2011 | | PASS |
Tim L. Woodard
|
|
|
|
BLD-Other | 6/28/2011 | 6/28/2011 | 6/28/2011 | P | PART |
Dave Hannah
|
|
|
john - ###-#### - ceiling cover ok to cover
|
Override - Parcel Holds | | | 6/28/2011 | | |
|
|
|
|
BLD-Framing/Rough-in | 6/24/2011 | 6/27/2011 | 6/27/2011 | A | PART |
Dave Hannah
|
|
|
field conditions for rated wall along exit corridor please. Phone #: ###-#### >> Inspection requested via web by John Lodman ok to cover new section of corrador wall above ceilings
|
BLD-Framing/Rough-in | 6/23/2011 | 6/24/2011 | 6/24/2011 | A | DEFR |
Dave Hannah
|
|
|
field conditions for rated wall along exit corridor please. Phone #: ###-#### >> Inspection requested via web by John Lodman
|
Plan Modification Accepted | | | 6/24/2011 | | DONE |
Tisha Gallop
|
|
|
Plan modification accepted for Bld11-00894 (Metageek - suite 300) to address the original corridor walls that were not built to deck with 1 hr construction identified in a field visit. Revision 3 on sheet a2.11 notes the necessary changes to the existing walls to maintain an appropriate 1 hr division from the Metageek suite to the public corridor. Submitted on revised cert of value and plan sheet a2.11; routed to Tim Woodard.
|
BLD-Conference | 6/17/2011 | 6/20/2011 | 6/23/2011 | A | PASS |
Dave Hannah
|
|
|
call john ###-#### plan reveiw and arch are working on project
|
BLD-Conference | 6/16/2011 | 6/17/2011 | 6/17/2011 | A | PART |
Tom Arcoraci
|
|
|
need to discuss corridor wall between new rated section and stairwell tower as per your voice mail of 6/16. thank you Phone #: ###-#### >> Inspection requested via web by John Lodman will talk to dave on monday
|
BLD-Wall cover | 6/15/2011 | 6/16/2011 | 6/16/2011 | A | PART |
Dave Hannah
|
|
|
wall cover only- wall bracing w/ ceiling inspection please. electrical inspection pending, no plumbing. thank you. Phone #: ###-#### >> Inspection requested via web by John Lodman ok to cover int walls
|
FIRE-Conference | 6/13/2011 | 6/14/2011 | 6/14/2011 | P | DONE |
Forrest France
|
|
|
On site meeting with contractor regarding fire life safety issues, review notes, red-line annotations, project related fire sprinkler permit work, existing fire alarm system, fire extinguisher locations, exit signage/EM lighting, accessibility upgrades.
|
Print Occupancy Form | | | 5/31/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/31/2011 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 5/31/2011 | | DONE |
Barbara Stitt
|
|
|
Left message for Tegan that permit is ready, fees due, and need values for electrical and fire alarm part of project on 5-31-11 @ 10:00am//BAS
|
Issue PAID IN FULL permit | | | 5/31/2011 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/27/2011 | | 5/27/2011 | | PASS |
Tim L. Woodard
|
|
|
Approved with redlines and plan review report. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/27/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 5/27/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 5/2/2011 | | 5/27/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 5/26/2011 | | DONE |
Tisha Gallop
|
|
|
received response letter and two copies of plan sheet a2.11; takent to Tim Woodard
|
Routing - PLAN CHECK | 5/25/2011 | | 5/25/2011 | | FAIL |
Tim L. Woodard
|
|
|
Need to provide all requirements of a second exit. Door needs to swing in direction of travel, exit signs are required, and emergency lighting required. Sent email and left a voice mail for Teagan at Erstad.
|
Plan resubmittals received | | | 5/19/2011 | | DONE |
Christina Prado
|
|
|
Received two sets of plans A2.01 & A2.11; Also received one copy of response letter and email printout. Routed plans to Tim for review
|
Routing - PLAN CHECK | 5/2/2011 | | 5/12/2011 | | FAIL |
Tim L. Woodard
|
|
|
Fail. Refer to plan review report. TLW
|
1st review completed | | | 5/12/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/2/2011 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/2/2011 | | DONE |
Christina Prado
|
|
|
|
Application received | | 4/29/2011 | | | |
|
|
|
|