BLD-Conference | 1/9/2012 | 1/9/2012 | 1/9/2012 | P | DONE |
Tom Arcoraci
|
|
|
|
DOC - Permit Expired | 1/9/2012 | 1/9/2012 | 1/9/2012 | P | PASS |
Tom Arcoraci
|
|
|
vacant
|
BLD-Conference | 12/12/2011 | 1/4/2012 | 1/9/2012 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 12/2/2011 | 12/12/2011 | 12/12/2011 | A | PASS |
Tom Arcoraci
|
|
|
temp occupancy ok at this time will be moving out of building soon
|
BLD-Conference | 11/23/2011 | 12/7/2011 | 12/2/2011 | A | CANC |
Tom Arcoraci
|
|
|
|
BLD-Conference | 11/22/2011 | 11/23/2011 | 11/23/2011 | P | PASS |
Tom Arcoraci
|
|
|
Temporary occupancy has expired need to obtain final CO within 10 working days or further legal action will be pending. 10 day notice issued
|
Issue PAID IN FULL permit | | | 10/25/2011 | | DONE |
|
|
|
|
Telephone call | | | 10/17/2011 | | DONE |
|
|
|
t/c w gabe - reminded him that this permit is going to expire on the 26th - he said he would make sure something (either pick up plans or submit a request for extension) before the 26th
|
Telephone call | | | 10/17/2011 | | DONE |
|
|
|
t/c w james - reminded him that this permit will expire on the 26th and let him know that I also called gabe to remind him also
|
Expiration Notice | 10/11/2011 | 11/1/2011 | 10/11/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 9/19/2011 | | DONE |
|
|
|
t/c w gabe - permit in ready status - he said he is waiting for one more bid (owner wanted 3 bids) so he can submit a new Certificate of Value
|
BLD-Conference | 8/25/2011 | 9/14/2011 | 9/13/2011 | A | PASS |
Tom Arcoraci
|
|
|
permit is ok for issue
|
Routing - FIRE | 8/30/2011 | | 8/31/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There ARE annotations on the plans.
|
Routing - PLAN CHECK | 8/31/2011 | | 8/31/2011 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PUBLIC WORKS | 8/31/2011 | | 8/31/2011 | | PASS |
Beverly Mountain
|
|
|
Added drinking fountain.
|
Plan assigned to (SRZ) | 5/9/2011 | | 8/31/2011 | | PASS |
Sam Zahorka
|
|
|
1st review completed. Pending Corrections.
|
CHANGE STATUS TO (REV) | | | 8/31/2011 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/31/2011 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 8/31/2011 | | DONE |
|
|
|
|
Telephone call | | | 8/31/2011 | | DONE |
Christina Prado
|
|
|
Spoke to gary about Cert of Value requirements and advised permit is ready to be issued pending new values given
|
Permit Ready to Issue | | | 8/31/2011 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 6/7/2011 | | 8/30/2011 | | PASS |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 8/30/2011 | | DONE |
Sam Zahorka
|
|
|
|
BLD-Conference | 8/9/2011 | 8/25/2011 | 8/25/2011 | A | PASS |
Tom Arcoraci
|
|
|
they have talked to plan review
|
Plan resubmittals received | | | 8/25/2011 | | |
|
|
|
Recieved 1 copy of response letter from James Gipson dated 8-23-11, 1 copy of ElKay specs for 2 station wall mount water cooler, 1 copy of United Water water flow sheet, 2 copies of sheets 1 and taken to Sam Zahorka//BAS
|
Meeting | | | 8/17/2011 | | DONE |
Sam Zahorka
|
|
|
Meeting with James Gipson the architect. Went over corrections and discussed possible solutions. waiting for resubmittals.
|
BLD-Conference | 8/2/2011 | 8/10/2011 | 8/10/2011 | P | PART |
Tom Arcoraci
|
|
|
|
BLD-Conference | 8/2/2011 | 8/2/2011 | 8/2/2011 | P | PASS |
Tom Arcoraci
|
|
|
Need to obtain final inspection before expiration.stopped at site told them to call architect to see what the hold up is on the permit
|
BLD-Conference | 7/8/2011 | 7/8/2011 | 7/8/2011 | A | DONE |
Tom Arcoraci
|
|
|
field reveiw
|
1st review completed | | | 6/7/2011 | | DONE |
|
|
|
Failed - Plan Check, Fire
|
Plan Reviewer's activity | | | 6/7/2011 | | DONE |
|
|
|
Emailed review to RP
|
Routing - FIRE | 6/3/2011 | | 6/7/2011 | | FAIL |
Scott Arellano
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
Routing - PLAN CHECK | 5/10/2011 | | 6/3/2011 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - PUBLIC WORKS | 5/9/2011 | | 5/10/2011 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Addressing | 5/10/2011 | | 5/10/2011 | | PASS |
Terry Records
|
|
|
|
Routing PW Drainage | 5/10/2011 | | 5/10/2011 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Rating | 5/10/2011 | | 5/10/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Design Review | 5/10/2011 | | 5/10/2011 | | PASS |
Sarah Schafer
|
|
|
Sarah Schafer
Approved per DRH04-00296
|
Pending Assignment by JCB | 5/5/2011 | | 5/9/2011 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 5/5/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 5/5/2011 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/5/2011 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/5/2011 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/5/2011 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 5/2/2011 | 5/3/2011 | 5/3/2011 | A | PEND |
Tom Arcoraci
|
|
|
###-####-gabe busby Please call at least 30 mins prior to inspection ok for temp until permit is issued 408
|
Plan Reviewer's activity | | | 5/2/2011 | | DONE |
Sam Zahorka
|
|
|
Spoke with Bob Archibald, Tom Arcoraci, and Jenifer Gilliland about Temporary Certificate of Occupancy request. A site inspection is required. The applicant was told to call the front desk and schedule with Tom under this BLD. Once inspection is complete a Temporary Certificate of Occupancy will be worked up and issued. Tenant improvment permit is currently being submitted. SRZ
|
Telephone call | | | 5/2/2011 | | DONE |
Sam Zahorka
|
|
|
Spoke with Gabe the tenant. Requested him to contact the front desk and schedule an inspection with Tom Arcoraci.
|
Plan Reviewer's activity | | | 4/29/2011 | | DONE |
Sam Zahorka
|
|
|
Intake Failed. Attached submittal checklist under documents.
|
Intake Approval | | | 4/29/2011 | | FAIL |
Sam Zahorka
|
|
|
Refer to circled items on checklist attached to this case. SRZ
|
Application received | | 4/29/2011 | | | |
|
|
|
|