Permit Information
Permit NumberBLD11-00908
StatusFinaled
Name RANDEL CONCRETE
Site Address 10375 W OVERLAND RD
Project NameSummit Church
Customer Number 
ePlanReviewNo
Description
Summit Church - New Covered Entry and Outdoor Plaza - To construct a new 450 square foot, one story, wood framed entry roof cover at the east side of the existing lobby. To install two new 60x610 glass entry doors at the east exterior wall of the lobby. To construct a new 475 square foot, elevated outdoor plaza and stairs. To install a new 60x610 exterior egress door from the south exit stair enclosure and to install approximately 48 lineal feet of new 5 foot wide concrete sidewalk from the new egress door to the existing sidewalk. The new covered entry is an addition to the sprinklered portion of this church building and will be fire sprinkled. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 5/15/20146/3/2014 DONE
old project
First Notice4/17/20144/17/20145/5/2014 DONE
DetailsJim Sly
DOC - Permit Finaled4/17/20144/17/20144/17/2014PPASS
DetailsJim Sly
BLD-Framing/Rough-in7/20/20117/20/20117/20/2011PPASS
DetailsMike Jordan
Randell Phone #: ###-####
BLD-Framing/Rough-in7/15/20117/15/20117/15/2011PNR
DetailsMike Jordan
Randy Hodgekinson ###-####. Neesd to provide rated can light fixtures, and truss enginnering.
BLD-Footing6/29/20116/29/20116/29/2011PPASS
DetailsMike Jordan
jake - rebar Phone #: ###-####. Reinforcement for concrete columns for new patio area.
BLD-Footing6/23/20116/23/20116/23/2011PPASS
DetailsMike Jordan
Randy Phone #: ###-####
Issue PAID IN FULL permit  6/21/2011 DONE
Inspection Record Card- Bld  6/16/2011 DONE
Permit Ready to Issue  6/16/2011 DONE
Telephone call  6/16/2011 DONE
6-16-11 called Don left message permit ready and fee given ///dld
Plan assigned to (JCM)5/2/20115/2/20116/15/2011 PASS
DetailsJohn Menard
Routing - PLAN CHECK5/20/2011 6/15/2011 PASS
DetailsJohn Menard
Routing - FIRE6/15/2011 6/15/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans. The Fire Marshal has agreed to approve the 450 square foot addition on the condition that the building owner provides a signed letter acknowledging no further Building permits will be issued by the City of Boise until this entire existing building is fully fire sprinklered in accordance with NFPA 13; or the available fire flow is made to comply with the minimum requriements of the 2009 IFC.
Routing - PLAN CHECK6/15/2011 6/15/2011 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  6/15/2011 DONE
DetailsJohn Menard
Telephone call  6/14/2011 DONE
Conference call with Boise Fire Marshal (Ron Amandus), Summit Church representative (Jerry Henbuck), and Fire Code plan reviewer Scott Arellano. The Fire Marshal has agreed to allow the issuance of the current building permit under the understanding that the building owner(s) agree that no further building permits will be issued until the building is fully fire sprinklered; or the required minimum fire flow for this building meets the minimum amount required by the 2009 IFC.
Meeting  6/14/2011 DONE
DetailsScott Arellano
Meeting with the Fire Marshal, Ron Amandus, to discuss the buildings Fire Flow deficiency and determine appropriate solution for the Fire Department and Building owner to move forward with current building permit application. The Fire Marshal has agreed to approve the 450 square foot addition on the condition that the building owner provides a signed letter acknowledging no further Building permits will be issued by the City of Boise until this entire existing building is fully fire sprinklered in accordance with NFPA 13.
Plan Reviewer's activity  6/14/2011 PASS
DetailsJohn Menard
Reviewed and approved final requested revisions. JCM
Plan resubmittals received  6/3/2011  
received 2 copies of sheets A-1,A-2,A-2.1,A-3,A-4,A-5,A-6,A-7,E-1,E-2 inserted by Don Steinke,sent to John m.
Routing - FIRE5/17/20115/17/20115/20/2011 FAIL
DetailsScott Arellano
Emailed resubmittal items to architect No fax number provided on application..
1st review completed  5/20/2011 FAIL
Failed Plan Check, Fire
Route to Impact Fee Review5/17/20115/20/20115/19/2011 PASS
DetailsCindy M. Gould
No impact fees, the new structure is site improvement, accessory to the principal use of the building.
Plan resubmittals requested  5/17/2011 DONE
DetailsJohn Menard
E-mailed the architect and applicant a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK5/10/2011 5/17/2011 FAIL
DetailsJohn Menard
Routing - PLANNING5/9/2011 5/10/2011 PASS
DetailsDavid Moser
czc11-00026
Routing - PLUMBING5/6/2011 5/9/2011 PASS
DetailsBill VanDegrift
no plumbing
Routing - PUBLIC WORKS5/5/2011 5/6/2011 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment5/6/2011 5/6/2011 PASS
DetailsSteven Webb
ESC plan waiver request is approved according to the ESC Permit Conditions. ESC11-00256
Routing PW Sewer Rating5/5/2011 5/5/2011 PASS
DetailsConnie Baumgartner
Routing PW Drainage5/5/2011 5/5/2011 PASS
DetailsBrian Murphy
448sf is less than 1000 sf
Routing - PLANNING Land Div5/3/2011 5/4/2011 PASS
DetailsTodd Tucker
Routing - Addressing5/4/2011 5/4/2011 PASS
DetailsTerry Records
Plan routing begun/NEW & ADDTN  5/2/2011  
Recd Pcfee & Taken To Pln CK  5/2/2011 DONE
Application received 5/2/2011