Case Summary (BLD) | | | 3/7/2014 | | |
|
|
|
|
First Notice | | 7/8/2012 | 6/28/2012 | | DONE |
|
|
|
|
Second Notice | | 7/8/2012 | 6/28/2012 | | DONE |
|
|
|
|
Third Notice | | 7/3/2012 | 6/28/2012 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 5/14/2012 | | DONE |
Christina Prado
|
|
|
|
DOC - Permit Finaled | | | 5/14/2012 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 5/10/2012 | 5/10/2012 | 5/11/2012 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection passed.
|
BLD-Final | 3/7/2012 | 3/8/2012 | 3/8/2012 | A | DONE |
Tom Arcoraci
|
|
|
|
BLD-Conference | 3/7/2012 | 3/7/2012 | 3/7/2012 | P | PASS |
Tom Arcoraci
|
|
|
Dave Phone #: ###-#### ok for final pending fire
|
BLD-Framing/Rough-in | 2/7/2012 | 2/7/2012 | 2/7/2012 | P | PASS |
Tom Arcoraci
|
|
|
dave Phone #: ###-####
|
BLD-Framing/Rough-in | 1/3/2012 | 1/3/2012 | 1/3/2012 | P | PART |
Jim Sly
|
|
|
Please call prior to arrival---Dave Phone #: ###-#### Select restroom framing.....OK
|
BLD-Framing/Rough-in | 11/22/2011 | 11/22/2011 | 11/22/2011 | P | PASS |
Tom Arcoraci
|
|
|
dave - ok to cover Phone #: ###-####
|
BLD-Framing/Rough-in | 9/29/2011 | 9/30/2011 | 9/30/2011 | A | PART |
Tom Arcoraci
|
|
|
dave - please call 1/2 hr prior Phone #: ###-####
|
BLD-Framing/Rough-in | 9/15/2011 | 9/16/2011 | 9/16/2011 | P | PASS |
Tom Arcoraci
|
|
|
dave - ok to cover - please call 1/2 hr prior so he can meet you there Phone #: ###-#### old gym bathrooms
|
BLD-Framing/Rough-in | 8/19/2011 | 8/19/2011 | 8/19/2011 | P | PART |
Jim Storey
|
|
|
dave Phone #: ###-#### main hall walls ok
|
Issue PAID IN FULL permit | | | 8/8/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (DRS) | 6/21/2011 | 6/21/2011 | 8/3/2011 | | PASS |
Dan Stuart
|
|
|
|
Routing - FIRE | 8/1/2011 | | 8/3/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLAN CHECK | 8/3/2011 | | 8/3/2011 | | PASS |
Dan Stuart
|
|
|
To permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/3/2011 | | PASS |
Dan Stuart
|
|
|
|
Inspection Record Card- Bld | | | 8/3/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/3/2011 | | DONE |
|
|
|
|
Telephone call | | | 8/3/2011 | | DONE |
|
|
|
8-3-11 called told Brent permit rteady and fee given Also need GC & RP ///dld
|
Routing - PLAN CHECK | 7/29/2011 | | 8/1/2011 | | PEND |
Dan Stuart
|
|
|
Routing to fire for rev-review of added scope of work.
|
Routing - MECHANICAL | 7/28/2011 | | 7/29/2011 | | PASS |
Troy James
|
|
|
New plan sheetys 23.20, 23.30, 23.31, 23.40 & 23.41 provided in response to mechanical plan review.
|
Telephone call | | | 7/28/2011 | | DONE |
|
|
|
Called Brent Van Hees to request new certificate of value for added scope of work.Will provide.
|
Plan resubmittals received | | | 7/28/2011 | | |
|
|
|
Received 1 cover transmital, 2 copies of sheets 23.20, 23.30, 23.31, 23.40, 23.41 and taken to Dan Stuart
|
Routing - PLAN CHECK | 6/30/2011 | | 7/28/2011 | | PEND |
Dan Stuart
|
|
|
Resubmittal plan sheets from mechanical engineer provided and inserted into plans. Plans routing back to mechanical plan reviewer.
|
Telephone call | | | 7/27/2011 | | DONE |
|
|
|
Called Bill Hamlin to see the staus on the required resubmittals for mechanical plan review for Borah High Plan Mod. Resubmittals have not been provide since last check with arch on 7/6/11. Bill said he would follow up as he thought the plans were complete and get them resubmitted or call me back if otherwise.
|
Telephone call | | | 7/6/2011 | | DONE |
|
|
|
Called and talked with Brent Van Clief, concerning mechanical plan review failure and status on resubmittals. I sent a copy of the mechanical plan review to the architect as the original had been sent to the mechanical engineer by the reviewer. They will work on resubmittals with mechanicl engineer.
|
Routing - MECHANICAL | 6/28/2011 | | 6/30/2011 | | FAIL |
Troy James
|
|
|
Plan Mod - Added restroom remodel in Industrial/Math building and Old Gym Building to original remodel
emailed corrections to architect
|
Routing - PLUMBING | 6/28/2011 | | 6/28/2011 | | PASS |
Bill VanDegrift
|
|
|
Plan Mod - Added restroom remodel in Industrial/Math building and Old Gym Building to original remodel
1. Per plans and 2003 UPC.
|
Routing PW Sewer Rating | 6/27/2011 | | 6/28/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLAN CHECK | 6/21/2011 | | 6/27/2011 | | PEND |
Dan Stuart
|
|
|
Dan Stuart - Reviewed scope of plan modification, reviewed additional plans and changes to original plans; modified attached plan review report and red-lines on plans. routing to Public work for re-evaluation of fee's.
|
Override - Parcel Holds | | | 6/27/2011 | | |
|
|
|
|
Routing - Addressing | 6/27/2011 | | 6/27/2011 | | PASS |
April Wing
|
|
|
|
Plan Modification Accepted | | | 6/21/2011 | | |
|
|
|
Plan modification accepted with the additive bid alternates of the renovation of one Boy/Girl set of restrooms in the Old Gymnasium Building and the renovation renovation of one set of Boy/Girl restrooms in the Math/Industrial Arts building. 2 complete new sets of plans were submitted, with no change in value.
|
Routing - PLAN CHECK | 5/17/2011 | | 5/23/2011 | | PASS |
Dan Stuart
|
|
|
Resubmittals inserted into plans. Plans to permit desk to issue.
|
Plan assigned to (DRS) | 5/4/2011 | | 5/23/2011 | | PASS |
Dan Stuart
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/23/2011 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 5/23/2011 | | DONE |
|
|
|
|
Telephone call | | | 5/23/2011 | | DONE |
Christina Prado
|
|
|
Called Bill with Design West Architects advised GC & RP required before issuance as well as fees due
|
Permit Ready to Issue | | | 5/23/2011 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 5/20/2011 | | |
Barbara Stitt
|
|
|
Received a cover tranmittal, response letter dated 5-19-11 to Dan Stuart from Bill Hamlin, 2 project manuals, 2 copies of sheets Cover sheet, 3.31, 3.32, 3.33, 3.34, 3.35, 22.00, 22.01, 22.10, 22.20, 22.30, 23.10, 23.20, 23.30, 23.40, 26.00, 26.10, 26.20, 26.21, 26.30, 26.31, 26.40 and taken to Dan Stuart
|
1st review completed | | | 5/17/2011 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - FIRE | 5/16/2011 | | 5/17/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLAN CHECK | 5/9/2011 | | 5/16/2011 | | FAIL |
Dan Stuart
|
|
|
Resubmittals required. Copy of plan review e-mailed to architect. Routing plans to fire code analyst for review.
|
Routing - MECHANICAL | 5/6/2011 | | 5/9/2011 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 5/5/2011 | | 5/6/2011 | | PASS |
Bill VanDegrift
|
|
|
DWV Detail page 22.30-- max 3 toilets on a 3" horizontal waste line. upc 609.10 & .10.2-- accessable water hammer arresters required on the restroom headers.
|
Routing - PUBLIC WORKS | 5/4/2011 | | 5/5/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 5/5/2011 | | 5/5/2011 | | PASS |
Steven Webb
|
|
|
ESC plan waier is approved according to the ESC permit conditions. ESC11-00262
|
Routing PW Sewer Rating | 5/5/2011 | | 5/5/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 5/4/2011 | | 5/4/2011 | | PASS |
Terry Records
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/4/2011 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/4/2011 | | |
|
|
|
ok per Tim Woodard to takenin as a level 3
|
Pending Assignment by JCB | 5/4/2011 | | 5/4/2011 | | DONE |
Jason Blais
|
|
|
|
Agreement of Future work | 5/19/2011 | 5/19/2022 | | | |
Jason Blais
|
|
|
(BORAH HIGH SCHOOL) 05/22/20 Wings of building have been replaced under FIR18-00804. Main Building is required to be fully fire sprinklered. **JHB** 11/15/19 Waiting for Main Building to be fully sprinklered. Currently on the (3) three wings are sprinklered. **JHB** Informal Upgrade Agreement has been agreed upon between the Boise School District and City of Boise. This document is attached to this case.
|
Application received | | 5/4/2011 | | | |
|
|
|
|