Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD11-00933
StatusFinaled
Name ASIN GENERAL CONTRACTORS
Site Address 3050 N LAKE HARBOR LN Unit: 254
Project NameACCELERATED MENTORING
Customer Number 
ePlanReviewNo
Description
(ACCELERATED MENTORING – Water Front Building – Ste # 254) Permit is to remodel an existing 10,424 square foot office tenant space. This building is fully fire sprinklered for area increase. Approval contingent upon adhering to the approved plans on file and plan review report. Work to include: installation / demolition of interior partition walls including: adding a screen wall across open office space, removing three offices, and dividing one large office are into three smaller offices], installation of new exit signage / emergency lighting, installation of new doors / accessible hardware, and finishes in compliance with chapter 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department.**TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 8/21/20118/11/2011 DONE
Second Notice 8/21/20118/11/2011 DONE
Third Notice 8/16/20118/11/2011 DONE
Permanent Occupancy  8/11/2011 DONE
BLD-Final8/1/20118/2/20118/2/2011PPASS
DetailsTony Young
I am ready for the final inspection. Electrical and fire/life safety have both been done. Let me know if you want me to meet you there. Thanks. Scott Phone #: ###-#### >> Inspection requested via web by Scott Asin
FIRE-Final Inspection7/29/20118/1/20118/1/2011APASS
DetailsTroy Cobbley
life safetty passed
FIRE-Final Inspection5/19/20115/20/20115/20/2011AFAIL
DetailsTroy Cobbley
Atleast one sprinkler head is overspaced at the east side of the door at the separation wall. This work will require a separate permit. Remove the deadbolt from the exit door at the top of the east stairwell. Repair all of the existing exit signs and emergency lights. Replace all of the missing ceiling tiles.
Issue PAID IN FULL permit  5/12/2011 DONE
DetailsTisha Gallop
Plan assigned to (TLW)5/4/2011 5/11/2011 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK5/4/2011 5/11/2011 PASS
DetailsTim L. Woodard
approved with redlines and report. TLW
1st review completed  5/11/2011 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  5/11/2011 DONE
DetailsTim L. Woodard
Case Summary (BLD)  5/11/2011 DONE
DetailsTim L. Woodard
Print Occupancy Form  5/11/2011 DONE
Permit Ready to Issue  5/11/2011 DONE
DetailsTisha Gallop
Telephone call  5/11/2011 DONE
DetailsTisha Gallop
called and left vm for Scott Asin that permit is ready and fees
Plans ACCEPTED BY PLAN TECH  5/4/2011 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  5/4/2011 DONE
DetailsChristina Prado
Application received 5/4/2011