First Notice | | 8/21/2011 | 8/11/2011 | | DONE |
|
|
|
|
Second Notice | | 8/21/2011 | 8/11/2011 | | DONE |
|
|
|
|
Third Notice | | 8/16/2011 | 8/11/2011 | | DONE |
|
|
|
|
Permanent Occupancy | | | 8/11/2011 | | DONE |
|
|
|
|
BLD-Final | 8/1/2011 | 8/2/2011 | 8/2/2011 | P | PASS |
Tony Young
|
|
|
I am ready for the final inspection. Electrical and fire/life safety have both been done. Let me know if you want me to meet you there. Thanks. Scott Phone #: ###-#### >> Inspection requested via web by Scott Asin
|
FIRE-Final Inspection | 7/29/2011 | 8/1/2011 | 8/1/2011 | A | PASS |
Troy Cobbley
|
|
|
life safetty passed
|
FIRE-Final Inspection | 5/19/2011 | 5/20/2011 | 5/20/2011 | A | FAIL |
Troy Cobbley
|
|
|
Atleast one sprinkler head is overspaced at the east side of the door at the separation wall. This work will require a separate permit. Remove the deadbolt from the exit door at the top of the east stairwell. Repair all of the existing exit signs and emergency lights. Replace all of the missing ceiling tiles.
|
Issue PAID IN FULL permit | | | 5/12/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (TLW) | 5/4/2011 | | 5/11/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 5/4/2011 | | 5/11/2011 | | PASS |
Tim L. Woodard
|
|
|
approved with redlines and report. TLW
|
1st review completed | | | 5/11/2011 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/11/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 5/11/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 5/11/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/11/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 5/11/2011 | | DONE |
Tisha Gallop
|
|
|
called and left vm for Scott Asin that permit is ready and fees
|
Plans ACCEPTED BY PLAN TECH | | | 5/4/2011 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/4/2011 | | DONE |
Christina Prado
|
|
|
|
Application received | | 5/4/2011 | | | |
|
|
|
|