Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD11-00937
StatusFinaled
Name JORDAN WILCOMB CONSTRUCTION
Site Address 9175 W BARNES DR
Project NameGSA-DEPT OF AGRICULTURE
Customer Number 
ePlanReviewNo
Description
(GSA-DEPT OF AGRICULTURE – South East & North East corners of the Blue Heron Building) Permit is to remodel an existing 44,664 square foot office building. This building is fully fire sprinklered for area increase. Approval contingent upon adhering to the approved plans on file and plan review report. Work to include: [installation / demolition of interior partition walls to create a warehouse (S-1) area and multiple office/open office (B) areas], installation of a new floor sink, installation / relocation of new lighting, installation of new doors / accessible hardware, and finishes in compliance with chapter 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department.**TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 2/3/20132/13/2013 DONE
Print Statement  2/13/2013 DONE
DetailsTisha Gallop
mailed to Jordan Wilcomb Const
Third Notice 1/8/20131/29/2013 DONE
e-mailed to rrush@jwci.com
Third Notice 12/9/20121/3/2013 DONE
emailed to rrush@jwci.com
Second Notice 11/24/201212/4/2012 DONE
First Notice 11/10/201211/14/2012 DONE
DetailsChristina Prado
mailed 11-15
BLD-Final10/31/201210/31/201210/31/2012PPASS
DetailsMike Jordan
need final pass for perm occ, part was pending zoning which passed on 10/18/12. Ok for perm. occ.
Permanent Occupancy  10/31/2012 DONE
DetailsTisha Gallop
Zoning Approval10/18/201210/18/201210/18/2012 DONE
DetailsAndrea Tuning
BLD-Final10/17/201210/17/201210/17/2012PPART
DetailsMike Jordan
kevin - call 30 mins prior to meet Phone #: ###-####. pending zoning.
FIRE-Final Inspection10/17/201210/17/201210/17/2012PPASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection6/27/20126/27/20126/27/2012PFAIL
DetailsTroy Cobbley
Life safety will be ok to sign off when the exit sign is replaced as discussed and the project related fire alarm permit.
FIRE-Final Inspection3/19/20123/20/20123/20/2012PFAIL
DetailsTroy Cobbley
Need the project related fire alarm permits finaled, one of which was just resubmitted for plan modifications. I performed the life safety inspection to address any trouble spots and found most of the exit signs non-operable. The fire extinguisher placement is ok.
BLD-Other2/21/20122/22/20122/22/2012APASS
DetailsJim Sly
kevin Phone #: ###-####
Last of the New construction Grid......OK.
BLD-Framing/Rough-in2/7/20122/7/20122/7/2012PPASS
DetailsMike Jordan
kevin Phone #: ###-####
BLD-Wall cover1/24/20121/24/20121/24/2012PPASS
DetailsMike Jordan
Ceiling cover--- Kevin Phone #: ###-####. Ceiling grid Phase 2 ok.
BLD-Conference1/20/20121/23/20121/23/2012ADONE
DetailsMike Jordan
Kevin Phone #: ###-####. Discussed ceiling grid issues with contractor.
BLD-Framing/Rough-in1/5/20121/5/20121/5/2012PPASS
DetailsMike Jordan
Kevin Phone #: ###-####. Interior steel stud framed walls in IT room phase 2.
BLD-Other12/7/201112/7/201112/7/2011PPART
DetailsMike Jordan
ceiling insp//kevin Phone #: ###-####. Phase 2 ok pending fire sprinkler.
BLD-Framing/Rough-in11/22/201111/23/201111/23/2011APASS
DetailsMike Jordan
kevin - building will be locked down at 1:30 Phone #: ###-####. Interior steel stud walls at breakroom, phase 2, no grid.
BLD-Framing/Rough-in11/18/201111/18/201111/18/2011PPASS
DetailsMike Jordan
kevin Phone #: ###-####. Interior steel stud framed wall only, no grid, phase 2, north half at gridline F.
BLD-Final8/29/20118/30/20118/30/2011APART
DetailsMike Jordan
kevin - final for south half only Phone #: ###-####. This is a phased project, did a walk thru at south east portion only, area has been marked on approved plans.
FIRE-Final Inspection8/29/20118/29/20118/29/2011PPART
DetailsTroy Cobbley
See the city approved plans for the phase 1 area, southeast corner of the building, where life safety has been passed. It has been marked in red ink with todays date.
FIRE-Final Inspection8/25/20118/26/20118/26/2011ACANC
DetailsTroy Cobbley
Kevin Smith Phone #: ###-#### Not ready for a final inspection due to the project related fire alarm permit.
BLD-Other8/23/20118/24/20118/24/2011APART
DetailsMike Jordan
kevin - ceiling grid - please call 1/2 hr prior Phone #: ###-####. Ceiling grid ok pending fire sprinklers.
BLD-Framing/Rough-in7/29/20117/29/20117/29/2011PNR
DetailsTony Young
kevin Phone #: ###-####,, need trades 1st for grid inspection,, no inspection made,, crews were gone for day
BLD-Framing/Rough-in7/8/20117/11/20117/11/2011APART
DetailsMike Jordan
kevin Phone #: ###-####. Interior steel stud framed walls only. ok to rock top portion of new warehouse walls only, remainder pending electrical rough in inspection. No grid.
Issue PAID IN FULL permit  6/27/2011 DONE
DetailsTisha Gallop
Print Occupancy Form  5/19/2011 DONE
Permit Ready to Issue  5/19/2011 DONE
Telephone call  5/19/2011 DONE
5-19-11 called Cornel permit ready and fee given ///dld
1st review completed  5/18/2011 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  5/18/2011 DONE
DetailsTim L. Woodard
Case Summary (BLD)  5/18/2011 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)5/4/2011 5/18/2011 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK5/12/2011 5/18/2011 PASS
DetailsTim L. Woodard
Tim Woodard, approved with report and redlines. TLW
Routing - PUBLIC WORKS5/4/2011 5/12/2011 PASS
DetailsBeverly Mountain
Routing PW Sewer Rating5/11/2011 5/11/2011 PASS
DetailsConnie Baumgartner
Routing - Addressing5/10/2011 5/10/2011 PASS
DetailsApril Wing
Plan resubmittals received  5/9/2011 DONE
DetailsChristina Prado
Received two sets of plans MG-2, EG-2 & E-3. Sheets inserted by arch. rep. Placed back in addressing for review
Application received 5/4/20115/4/2011 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  5/4/2011 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  5/4/2011 DONE
DetailsBarbara Stitt
Intake Approval  5/4/2011 PASS
DetailsTim L. Woodard