Third Notice | | 11/27/2011 | 12/9/2011 | | DONE |
|
|
|
faxed and mailed to Fred Schuerman
|
Third Notice | | 10/14/2011 | 11/7/2011 | | DONE |
|
|
|
faxed
|
Third Notice | | 9/14/2011 | 9/30/2011 | | DONE |
|
|
|
faxed to Fres Schuerman
|
Telephone call | | | 9/14/2011 | | DONE |
|
|
|
sharon with the pasta market called and said that they received the final value notice but it should go to the owner and that she will give it to the owner this afternoon so that they can respond to the notice.
|
Second Notice | | 9/19/2011 | 9/9/2011 | | DONE |
Christina Prado
|
|
|
Mailed 9-9-11
|
First Notice | | 8/13/2011 | 8/25/2011 | | DONE |
|
|
|
|
BLD-Final | 8/2/2011 | 8/3/2011 | 8/3/2011 | A | PASS |
Tom Arcoraci
|
|
|
Dave Phone #: ###-####
|
Permanent Occupancy UNPAID FEE | | | 8/3/2011 | | |
|
|
|
|
FIRE-Final Inspection | 7/29/2011 | 7/29/2011 | 7/29/2011 | P | PASS |
Troy Cobbley
|
|
|
life safety passed.
|
Telephone call | | | 6/20/2011 | | DONE |
Sam Zahorka
|
|
|
Contacted Jim Sly the Structural inspector about a possible plan modification permit due to the approved plans changing. Waiting for response from inspectors.
|
Telephone call | | | 6/15/2011 | | DONE |
Scott Arellano
|
|
|
Spoke with the registered design professional, William Matter, regarding the installation of one new fire hydrant, exit signs, and emergency lighting shown on the building plan set. Please see the attached letter referencing the above mentioned items for changes to the approved plan. *SJA*
|
Issue PAID IN FULL permit | | | 6/9/2011 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 6/2/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 6/1/2011 | | DONE |
Tisha Gallop
|
|
|
additional plans received three copies of plan sheet C3.1; put with plans that are RDY status per Sam Zahorka.
|
1st review completed | | | 5/31/2011 | | FAIL |
|
|
|
Failed Public Works, Plan Check
|
Routing - PLAN CHECK | 5/31/2011 | | 5/31/2011 | | PASS |
Sam Zahorka
|
|
|
|
Routing PW Sewer Design | 5/31/2011 | | 5/31/2011 | | PASS |
Jon R. Gunnerson
|
|
|
Passed based upon plans submitted (two services).
|
Routing - PUBLIC WORKS | 5/31/2011 | | 5/31/2011 | | PASS |
Connie Baumgartner
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/31/2011 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 5/31/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 5/31/2011 | | DONE |
Christina Prado
|
|
|
Called and left message for Bill Matter, gave balance due and advised permit is ready for pick up
|
Permit Ready to Issue | | | 5/31/2011 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (SRZ) | 5/6/2011 | | 5/31/2011 | | PASS |
Sam Zahorka
|
|
|
Pending Public Works approval.
|
Routing - FIRE | 5/25/2011 | | 5/31/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Case Summary (BLD) | | | 5/27/2011 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 5/27/2011 | | 5/27/2011 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 5/16/2011 | | 5/25/2011 | | FAIL |
Sam Zahorka
|
|
|
Requested building area analysis from the architect. Appears allowable area has been exceeded. Spoke with Corey at Matter architecture. Waiting for response.
|
Case Summary (BLD) | | | 5/25/2011 | | DONE |
Sam Zahorka
|
|
|
|
Telephone call | | | 5/25/2011 | | DONE |
Sam Zahorka
|
|
|
Called the architect and left a message to call me back to discuss needed information.
|
Routing - Design Review | 5/16/2011 | | 5/16/2011 | | PASS |
Sarah Schafer
|
|
|
Sarah Schafer - New exterior make-up air unit on concrete slab (north side of building)
|
Routing - PLUMBING | 5/12/2011 | | 5/16/2011 | | PASS |
Daryl Spivey
|
|
|
1. Building sewer to be 4" into building.
2. Water service backflow can be a DCVA or a RPBP. RPBP can only be installed in the horizontal.
3. Per plans and 2003 UPC.
|
Routing - PUBLIC WORKS | 5/6/2011 | | 5/12/2011 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Jon Gunerson- sewer design
|
Routing PW Sewer Rating | 5/10/2011 | | 5/11/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Design | 5/11/2011 | | 5/11/2011 | | FAIL |
Jon R. Gunnerson
|
|
|
New plans to be submitted showing new manhole location and service line route.
|
Routing PW Environmental | 5/10/2011 | | 5/10/2011 | | PASS |
Walt Baumgartner
|
|
|
Triple sink and prep sink to new passive grease trap, OK
|
Routing - Addressing | 5/9/2011 | | 5/9/2011 | | PASS |
Terry Records
|
|
|
|
Pending Assignment by JCB | 5/5/2011 | | 5/6/2011 | | DONE |
Jason Blais
|
|
|
|
Application received | | 5/5/2011 | 5/5/2011 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 5/5/2011 | | PASS |
|
|
|
OK to submitt for permit.
|
Plans ACCEPTED BY PLAN TECH | | | 5/5/2011 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/5/2011 | | DONE |
Tisha Gallop
|
|
|
|