Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD11-00959
StatusExpired
Name ALLEN DALTON
Site Address 736 N HIGHPOINT LN
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the removal and replacement of an existing retaining wall of about 37l.f. R-1B ok per Josh Johnson. separate ESC permit is required. A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at 384-3946. All per the approved plans and engineering attached. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired10/1/201310/1/201310/1/2013PPASS
DetailsDave Hannah
BLD-Aging Inspection9/26/201310/1/201310/1/2013APASS
DetailsDave Hannah
BLD-Wall cover7/19/20117/20/20117/20/2011APASS
DetailsDave Hannah
Late morning---Butch Phone #: ###-####
BLD-Footing7/15/20117/18/20117/18/2011PPASS
DetailsDave Hannah
Ist inspection if possible---Butch Phone #: ###-####
PubWorks Subgrade Approval7/15/20117/15/20117/15/2011 DONE
DetailsTerry Records
Footing subgrade approved by the geotechnical engineer
Routing Walk-In (Zoning)5/6/20115/6/20115/6/2011APASS
DetailsJoshua Johnson
Routing Walk-In (BLD)5/6/20115/6/20115/6/2011ADONE
DetailsPerry Paine
Routing Walk-In (Erosion)5/6/20115/6/20115/6/2011APASS
DetailsSteven Webb
ESC plan is approved according to the ESC Permit and Plan Conditions. ESC11-00267
Plan assigned to (PEP)5/6/20115/6/20115/6/2011 PASS
DetailsPerry Paine
Inspection Record Card- Bld  5/6/2011  
Case Summary (BLD)  5/6/2011  
1st review completed  5/6/2011 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/6/2011 DONE
Inspection Record Card- Bld  5/6/2011 DONE
Permit Ready to Issue  5/6/2011 DONE
DetailsTisha Gallop
Issue PAID IN FULL permit  5/6/2011 DONE
DetailsChristina Prado
Routing - PLAN CHECK5/6/2011 5/6/2011 PASS
DetailsPerry Paine
Perry
Routing PW Grading-Hillside5/6/2011 5/6/2011 PASS
DetailsColleen T Carroll
Footing subgrade must be approved by the applicants geotechnical engineer prior to scheduling footing inspection.
Application received 5/6/2011