Letter of compliance/Occupancy | | | 8/12/2011 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 8/9/2011 | 8/10/2011 | 8/10/2011 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Final | 8/10/2011 | 8/10/2011 | 8/10/2011 | P | PASS |
Dave Hannah
|
|
|
tim - please call to confirm approval Phone #: ###-####
|
DOC - Permit Finaled | 8/10/2011 | 8/10/2011 | 8/10/2011 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 8/9/2011 | 8/9/2011 | 8/9/2011 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection completed satisfactory.
|
BLD-Other | 7/26/2011 | 7/27/2011 | 7/27/2011 | A | PASS |
Dave Hannah
|
|
|
ceiling cover insp//Tim Phone #: ###-####
|
BLD-Other | 7/20/2011 | 7/21/2011 | 7/21/2011 | P | CANC |
Dave Hannah
|
|
|
Ceiling cover---Tim Phone #: ###-####
|
FIRE-Conference | 7/12/2011 | 7/12/2011 | 7/12/2011 | P | DONE |
Forrest France
|
|
|
On site conference regarding existing building fire alarm and sprinkler systems and related modifications due to remodel work.
|
BLD-Energy code compliance | 7/11/2011 | 7/12/2011 | 7/12/2011 | P | PASS |
Dave Hannah
|
|
|
tim Phone #: ###-####
|
Plan Reviewer's activity | | | 7/12/2011 | | DONE |
Tim L. Woodard
|
|
|
Added a Com Check to the Documents to validate new insulation methods used in the field. Com Check complies. TLW
|
BLD-Framing/Rough-in | 7/7/2011 | 7/7/2011 | 7/7/2011 | P | PASS |
Tom Arcoraci
|
|
|
Tim-PLease call at least 30 mins prior to inspection Phone #: ###-#### ok to insulate
|
BLD-Foundation | 6/27/2011 | 6/28/2011 | 6/28/2011 | A | PASS |
Dave Hannah
|
|
|
tim Phone #: ###-####
|
BLD-Footing | 6/27/2011 | 6/27/2011 | 6/27/2011 | P | PASS |
Dave Hannah
|
|
|
Tim Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/10/2011 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 6/2/2011 | | |
|
|
|
|
Telephone call | | | 6/2/2011 | | DONE |
Tisha Gallop
|
|
|
called Larry Knopp and told him permit is ready and fees.
|
Plan assigned to (TLW) | 5/9/2011 | | 6/2/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 5/27/2011 | | 6/2/2011 | | PASS |
Tim L. Woodard
|
|
|
Resubmittals approved. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/2/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 6/2/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 6/2/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 6/2/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 6/1/2011 | | |
Barbara Stitt
|
|
|
Received 2 copies of sheets A0.0, A2.1, A4.0 inserted into plans and given back to Tim Woodard
|
Routing - FIRE | 5/25/2011 | | 5/27/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 5/27/2011 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - Erosion and Sediment | 5/25/2011 | | 5/25/2011 | | PASS |
Tim L. Woodard
|
|
|
Plan Waiver approved. Must Comply with attached conditions. TLW
|
Routing - PLAN CHECK | 5/10/2011 | | 5/24/2011 | | FAIL |
Tim L. Woodard
|
|
|
Need more energy info. TLW
|
Routing PW Sewer Rating | 5/10/2011 | | 5/10/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 5/10/2011 | | 5/10/2011 | | PASS |
Brian Murphy
|
|
|
|
Routing - PUBLIC WORKS | 5/9/2011 | | 5/10/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 5/9/2011 | | 5/9/2011 | | PASS |
Terry Records
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/9/2011 | | DONE |
|
|
|
5-6-11 ok per Tim Woodard to take in as a level 2
|
Recd Pcfee & Taken To Pln CK | | | 5/9/2011 | | DONE |
|
|
|
|
Application received | | 5/6/2011 | | | |
|
|
|
|