Case Summary (BLD) | | | 10/25/2011 | | DONE |
Christina Prado
|
|
|
|
(F) Reprint permit | | | 10/25/2011 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 10/25/2011 | | DONE |
Christina Prado
|
|
|
Called and gave Rick fees due after value increase. E-mailed copy of fees to accountanct for payment
|
Second Notice | | 10/16/2011 | 10/19/2011 | | DONE |
|
|
|
faxed 10-19-2011 Received 10/25/11
|
First Notice | | 10/2/2011 | 10/6/2011 | | DONE |
|
|
|
|
BLD-Final | 9/20/2011 | 9/21/2011 | 9/22/2011 | A | PASS |
Dave Hannah
|
|
|
Please call 30min prior--Shawn Phone #: ###-####
|
DOC - Permit Finaled | 9/22/2011 | 9/22/2011 | 9/22/2011 | P | PASS |
Dave Hannah
|
|
|
|
Print Occupancy Form | | | 9/22/2011 | | DONE |
Christina Prado
|
|
|
|
Permanent Occupancy | | | 9/22/2011 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 9/19/2011 | 9/20/2011 | 9/20/2011 | A | PASS |
Forrest France
|
|
|
|
BLD-Framing/Rough-in | 9/7/2011 | 9/8/2011 | 9/8/2011 | A | PASS |
Dave Hannah
|
|
|
Please call 30min in advance--Shawn Phone #: ###-####
|
BLD-Footing | 8/30/2011 | 8/31/2011 | 8/31/2011 | A | PASS |
Dave Hannah
|
|
|
Please call 30min prior---Shawn Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/15/2011 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (TLW) | 5/9/2011 | | 5/19/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 5/9/2011 | | 5/19/2011 | | FAIL |
Tim L. Woodard
|
|
|
Need Info on existing Foundation. Left message with Craig Brasher @ AHJ. TLW
|
1st review completed | | | 5/19/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 5/19/2011 | | 5/19/2011 | | PASS |
Tim L. Woodard
|
|
|
Talked with engineer. Engineer is confident the existing foundation wall is far exceeding what is needed. He indicated a 12 inch width that extended over 6 ft. into ground to create a root sellar area. TLW
|
1st review completed | | | 5/19/2011 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/19/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 5/19/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - Erosion and Sediment | 5/19/2011 | | 5/19/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 5/19/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/19/2011 | | DONE |
|
|
|
|
Telephone call | | | 5/19/2011 | | DONE |
|
|
|
5-19-11 called left message for Keith permit ready and fee given Also need GC & RP ///DLD
|
Application received | | 5/9/2011 | 5/9/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/9/2011 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/9/2011 | | DONE |
Christina Prado
|
|
|
|