Third Notice | | 10/14/2011 | 10/18/2011 | | DONE |
|
|
|
|
Third Notice | | 9/14/2011 | 9/30/2011 | | DONE |
|
|
|
e-mailed and mailed to GC
|
Second Notice | | 8/26/2011 | 9/9/2011 | | DONE |
Christina Prado
|
|
|
Mailed 9/9/11
|
First Notice | | 8/8/2011 | 8/16/2011 | | DONE |
|
|
|
|
FIRE-Final Inspection | 7/28/2011 | 7/29/2011 | 7/29/2011 | P | PASS |
Forrest France
|
|
|
Fire life safety okay for final pending keyed locking hardware is removed at the second exit- structural inspector to verify prior to final.
|
BLD-Final | 7/28/2011 | 7/29/2011 | 7/29/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 7/29/2011 | | DONE |
Barbara Stitt
|
|
|
|
FIRE-Final Inspection | 7/28/2011 | 7/28/2011 | 7/28/2011 | P | FAIL |
Forrest France
|
|
|
Missing doors and hardware at several locations, new office walls are not yet finished, need to post fire extinguisher per plan, remove manual thumbturn at the main entry/exit, provide approved hardware at the second exit.
|
FIRE-Sprinkler Rough-in | 7/28/2011 | 7/28/2011 | 7/28/2011 | P | PART |
Forrest France
|
|
|
Okay to cover fire sprinkler modifications at the drop ceilings.
|
BLD-Final | 7/28/2011 | 7/29/2011 | 7/28/2011 | P | NR |
Tom Arcoraci
|
|
|
russ Phone #: ###-####
|
BLD-Conference | 7/27/2011 | 7/27/2011 | 7/27/2011 | P | PASS |
Tom Arcoraci
|
|
|
Russ ###-####
|
BLD-Framing/Rough-in | 6/23/2011 | 6/24/2011 | 6/24/2011 | A | PART |
Tom Arcoraci
|
|
|
russ - please call 1/2 hr prior Phone #: ###-#### needs elec rough in ok
|
Issue PAID IN FULL permit | | | 6/8/2011 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 6/7/2011 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 6/7/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 6/7/2011 | | DONE |
Tisha Gallop
|
|
|
called Pat McKeegand and told him permit is ready and fees.
|
Routing - PLAN CHECK | 6/6/2011 | | 6/6/2011 | | PASS |
Tim L. Woodard
|
|
|
After sending a plumbing, building, and electrical inspector to the site it was determined that permit number BLD98-00957 was the permit for this space and all appropriate work was done. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/6/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 6/6/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 5/12/2011 | | 6/6/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 5/16/2011 | | 5/26/2011 | | FAIL |
Tim L. Woodard
|
|
|
Previous permit BLD98-00979 expired. This permit identifies portions of the work were complete. This TI needs to be resubmitted as a Major TI and full compliance with the current code shown. Tim Woodard
|
1st review completed | | | 5/26/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Routing PW Sewer Rating | 5/13/2011 | | 5/16/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 5/12/2011 | | 5/16/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 5/13/2011 | | 5/13/2011 | | PASS |
April Wing
|
|
|
|
Application received | | 5/11/2011 | 5/11/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/11/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 5/11/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/11/2011 | | DONE |
Darla L Downs
|
|
|
|