Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD11-01027
StatusFinaled
Name ROBERT P JONES CO
Site Address 4287 N LA FONTANA WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the repair of a failing foundatio for an existing single family dwelling. The method for the repair and leveling of the structure will be CHANCE brand helical piers. R-1B ok per Colleen Carroll. ESC Plan Approved. A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at 384-3946. All per the approved plans as marked along with the Engineer of record's requirements as the project progresses. pep 11-26-12 Please see attached for Geotechnical report ///dld
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/30/201211/30/201211/30/2012PDONE
DetailsTony Young
Robert cell # ###-#### Phone #: ###-#### PLEASE call before going out///
final ok per engineers letters of ok
DOC - Permit Finaled11/30/201211/30/201211/30/2012PPASS
DetailsTony Young
final ok per engineers letters of ok,,, see documents
BLD-Final11/29/201211/29/201211/30/2012PPASS
DetailsTony Young
Robert cell # ###-#### Phone #: ###-#### PLEASE call before going out
BLD-Foundation11/26/201211/28/201211/30/2012ADONE
DetailsTony Young
Robert cell # ###-#### Phone #: ###-#### PLEASE call before going out,,, done per engineers letters
Routing Walk-In (Zoning)5/13/20115/13/20115/13/2011APASS
DetailsColleen T Carroll
Routing Walk-In (BLD)5/13/20115/13/20115/13/2011ADONE
DetailsPerry Paine
Routing Walk-In (PW Hillside)5/13/20115/13/20115/13/2011APASS
Details
subgrade must be approved by the applicants geotechnical engineer
Plan assigned to (PEP)5/13/20115/13/20115/13/2011 PASS
DetailsPerry Paine
Case Summary (BLD)  5/13/2011  
Inspection Record Card- Bld  5/13/2011  
1st review completed  5/13/2011 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/13/2011 DONE
Permit Ready to Issue  5/13/2011 DONE
DetailsTisha Gallop
Issue PAID IN FULL permit  5/13/2011 DONE
DetailsTisha Gallop
Application received 5/13/2011