Print Statement | | | 7/31/2012 | | DONE |
Rita DeYoung
|
|
|
|
First Notice | | 5/20/2012 | 7/2/2012 | | DONE |
|
|
|
|
Permanent Occupancy | | | 5/10/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
BLD-Final | 5/7/2012 | 5/9/2012 | 5/9/2012 | P | PASS |
Jim Sly
|
|
|
Late afternoon -- Bob Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 5/7/2012 | 5/9/2012 | 5/9/2012 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Temporary Occupancy | 5/9/2012 | 8/7/2012 | 5/9/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Telephone call | | | 5/9/2012 | | DONE |
|
|
|
Spoke with the fire inspector regarding duct detector indicators with strobes on them. I let the inspector know that as long as there were not more than two in any field of view, and as long as there are not fire alarm notification devices in the building, then they would be allowed. However, these indicator strobes (non-fire) are not allowed in any building that has notification devices. They are not allowed if there are more than two in any field of view unless a flash rate is submitted to the fire alarm plans examiner to verify the flash rate complies with ADA and NFPA 72 requirements.
|
BLD-Final | 5/4/2012 | 5/7/2012 | 5/8/2012 | P | NR |
Jim Sly
|
|
|
bob Phone #: ###-####
|
FIRE-Final Inspection | 5/4/2012 | 5/7/2012 | 5/7/2012 | A | FAIL |
Troy Cobbley
|
|
|
Provide remote annunciation per IMC 606.4.1. And then provide functional testing for sutdown verification.
|
Zoning Approval | 5/7/2012 | 5/7/2012 | 5/7/2012 | | DONE |
Andrea Tuning
|
|
|
|
PubWorks Occupancy Approval | 5/7/2012 | 5/7/2012 | 5/7/2012 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Conference | 5/4/2012 | 5/4/2012 | 5/4/2012 | P | DONE |
Forrest France
|
|
|
On site discussion with contractor regarding items needed for final fire life safety approvals including fire code review note details such as premise identification, signage at the main entry/exit, PFE locations, max occupant load signs, smoke detection for HVAC units over 2000 cfm, project schedule, etc.
|
BLD-Other | 4/16/2012 | 4/16/2012 | 4/16/2012 | P | PASS |
Jim Sly
|
|
|
above grid ceilig insp//Bob Goodwin Phone #: ###-####
|
BLD-Other | 3/20/2012 | 3/20/2012 | 3/20/2012 | P | PASS |
Jim Sly
|
|
|
BOB Phone #: ###-#### Int shear walls OK
|
BLD-Energy code compliance | 3/19/2012 | 3/19/2012 | 3/19/2012 | P | PASS |
Jim Sly
|
|
|
Bob Goodwin Phone #: ###-####
|
BLD-Framing/Rough-in | 3/14/2012 | 3/15/2012 | 3/15/2012 | A | PASS |
Jim Sly
|
|
|
BOB Phone #: ###-####
|
BLD-Framing/Rough-in | 3/13/2012 | 3/13/2012 | 3/13/2012 | P | NR |
Jim Sly
|
|
|
Sheer wall also -- Bob Phone #: ###-####
|
Override - Parcel Holds | 3/13/2012 | 1/1/1900 | 3/13/2012 | | |
|
|
|
framing & sheer wall
|
CHANGE STATUS TO (ISS) | | | 3/9/2012 | | DONE |
|
|
|
|
(F) Reprint permit | | | 3/9/2012 | | DONE |
|
|
|
|
Telephone call | | | 3/8/2012 | | |
|
|
|
3-8-12 ( 8:15 ) called left message for Pete to call me ///dld
|
Telephone call | | | 3/8/2012 | | |
|
|
|
3-8-12 1:29 pm called left voice message for Pete to call me ///dld
|
Plan assigned to (JCM) | 2/16/2012 | 2/16/2012 | 2/17/2012 | | PASS |
John Menard
|
|
|
|
Routing - PLUMBING | 2/16/2012 | | 2/17/2012 | | PASS |
Bill VanDegrift
|
|
|
ok just a resubmittal
|
Routing - PLAN CHECK | 2/17/2012 | | 2/17/2012 | | PASS |
John Menard
|
|
|
Plan Mod. - Plumbing only. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/17/2012 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 2/17/2012 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 2/17/2012 | | |
|
|
|
|
Permit Ready to Issue | | | 2/17/2012 | | |
|
|
|
|
Telephone call | | | 2/17/2012 | | |
|
|
|
2-16-12 called Kristi left message permit ready and fee given ///dld
|
Plan Modification Accepted | | | 2/16/2012 | | DONE |
Tisha Gallop
|
|
|
Plan modification accepted for Bld11-01032 (Taco Bell) for clarification of plumbing equipement locations and notes. No additional fixtures. Submitted on plan sheets T1.0, P4.0; routed to plumbing then John Menard.
|
BLD-Concrete | 2/9/2012 | 2/9/2012 | 2/9/2012 | P | PASS |
Jim Sly
|
|
|
concrete stem walls//Bob Goodwin Phone #: ###-####
|
BLD-Footing | 2/8/2012 | 2/9/2012 | 2/9/2012 | A | PASS |
Jim Sly
|
|
|
|
BLD-Footing | 2/7/2012 | 2/8/2012 | 2/8/2012 | P | PASS |
Jim Sly
|
|
|
Concrete at 3 -- Bob Phone #: ###-####
|
Issue PAID IN FULL permit | | | 1/24/2012 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 11/1/2011 | | |
|
|
|
|
Extend Review Timeline | | | 11/1/2011 | | DONE |
|
|
|
|
Expiration Notice | 10/20/2011 | 11/10/2011 | 10/20/2011 | | DONE |
Patricia Smith
|
|
|
|
Plan assigned to (JCM) | 10/5/2011 | 10/5/2011 | 10/6/2011 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 10/5/2011 | | 10/6/2011 | | PASS |
John Menard
|
|
|
|
Plan Reviewer's activity | | | 10/6/2011 | | PASS |
John Menard
|
|
|
Reviewed and approved foundation change from monolithic to standard concrete slab and spread footing foundation. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/6/2011 | | DONE |
John Menard
|
|
|
|
Telephone call | | | 10/6/2011 | | DONE |
Christina Prado
|
|
|
called and spoke with Will and gave fees due, also adviced on ACHD, GC & RP requirements
|
Permit Ready to Issue | | | 10/6/2011 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 10/5/2011 | | DONE |
Christina Prado
|
|
|
Received three sets of plan sheets T1.0, S1.0, S4.0, A5.3 & A6.2. as well as one transmittal sheet. Plans inserted by Christina and given to John Menard for further review.
|
Routing - PUBLIC WORKS | 6/9/2011 | | 6/10/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 6/9/2011 | | 6/10/2011 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 6/10/2011 | | 6/10/2011 | | PASS |
John Menard
|
|
|
|
Plan Reviewer's activity | | | 6/10/2011 | | PASS |
John Menard
|
|
|
Reviewed and approved final structural revision. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/10/2011 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 6/10/2011 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 6/10/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 6/10/2011 | | DONE |
Christina Prado
|
|
|
Number fir Kristi no good, called Will with Es-O-En corp and left message advising of fees due as well as ACHD requirement, GC info and Rp requirement.
|
Permit Ready to Issue | | | 6/10/2011 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (JCM) | 5/16/2011 | | 6/10/2011 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 6/3/2011 | | 6/9/2011 | | |
John Menard
|
|
|
|
Plan resubmittals received | | | 6/9/2011 | | DONE |
Tisha Gallop
|
|
|
received by mail, structural plan review response and two copies of plan sheet S4.1; taken to John Menard.
|
Route to Impact Fee Review | 5/31/2011 | 6/3/2011 | 6/3/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 5/31/2011 | 5/31/2011 | 6/3/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 6/3/2011 | | FAIL |
|
|
|
Failed Structural, Public Works
|
Plan resubmittals requested | | | 6/2/2011 | | DONE |
John Menard
|
|
|
E-mailed the applicant a copy of the structural review requesting revisions. JCM
|
Plan resubmittals received | | | 6/1/2011 | | DONE |
Tisha Gallop
|
|
|
received via courier one copy of O & M, five copies of plan sheets C1.0, C2.0, C3.0; inserted into plans by plan tech. and taken back to Fire Review.
|
Plan Reviewer's activity | | | 5/31/2011 | | PASS |
John Menard
|
|
|
Reviewed and approved with attached comments and redlined notes. JCM
|
Routing Off Site - STRUCTURAL | 5/16/2011 | | 5/31/2011 | | FAIL |
John Menard
|
|
|
Called Action Courier for pick up @ 10:10am - Received comments from consulting engineer requesting one revisions. JCM
|
Routing - PLAN CHECK | 5/25/2011 | | 5/31/2011 | | PASS |
John Menard
|
|
|
Route to John Menard - Approved with attached comments and redlined notes. JCM
|
Routing - PLANNING | | | 5/25/2011 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning DRH10-00290
|
Routing - PLANNING | 5/25/2011 | | 5/25/2011 | | PASS |
David Moser
|
|
|
David Moser CUP10-00075
|
Routing - PLUMBING | 5/24/2011 | | 5/24/2011 | | PASS |
Bill VanDegrift
|
|
|
1. Provide RPBP installed before water filters.
2. Per plans and 2003 UPC.
|
Routing - PUBLIC WORKS | 5/17/2011 | | 5/24/2011 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Brian Murphy ###-####
|
Routing - Erosion and Sediment | 5/24/2011 | | 5/24/2011 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC Plan and ESC Permit conditions. ESC11-00290
|
Routing PW Solid Waste | 5/23/2011 | | 5/23/2011 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Sewer Rating | 5/23/2011 | | 5/23/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 5/23/2011 | | 5/23/2011 | | PASS |
Walt Baumgartner
|
|
|
1500 gallon grease interceptor
|
Routing PW Street Lights | 5/23/2011 | | 5/23/2011 | | PASS |
Mike D Hedge
|
|
|
|
Routing PW Drainage | 5/19/2011 | | 5/23/2011 | | FAIL |
Brian Murphy
|
|
|
needs revisions to drainage plan
|
Routing PW Sewer Design | 5/19/2011 | | 5/19/2011 | | PASS |
Jon R. Gunnerson
|
|
|
Connect onto existing sanitary sewer service line provided.
|
Routing - Addressing | 5/17/2011 | | 5/17/2011 | | PASS |
Terry Records
|
|
|
|
Routing - PLANNING Land Div | 5/16/2011 | | 5/17/2011 | | PASS |
Todd Tucker
|
|
|
|
Pending Assignment by JCM | 5/16/2011 | | 5/16/2011 | | DONE |
John Menard
|
|
|
|
Application received | | 5/13/2011 | 5/13/2011 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 5/13/2011 | | PASS |
|
|
|
OK to submit for permit. This is a new building. The plan intake meeting was done at 11:00 AM to accommodate the applicant. There was no PRE permit prepared because others thought this was a tenant improvement. The plan intake meeting was scheduled only with the Plans Examiner.
|
Plans ACCEPTED BY PLAN TECH | | | 5/13/2011 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/13/2011 | | DONE |
Barbara Stitt
|
|
|
|