BLD-Final | 5/31/2011 | 6/1/2011 | 6/1/2011 | A | CANC |
Dave Hannah
|
|
|
george Phone #: ###-####
|
BLD-Final | 6/1/2011 | 6/1/2011 | 6/1/2011 | P | PASS |
Dave Hannah
|
|
|
george Phone #: ###-#### ok for perm occ
|
FIRE-Final Inspection | 6/1/2011 | 6/1/2011 | 6/1/2011 | P | PASS |
Forrest France
|
|
|
Locking hardware at the west tenant door to the restroom access hall removed. Fire life safety finaled.
|
FIRE-Final Inspection | 5/31/2011 | 5/31/2011 | 6/1/2011 | P | PART |
Forrest France
|
|
|
C/N items completed with the exception of hardware issues at the restroom access corridor. Inspection done 5/31.
|
Permanent Occupancy | | | 6/1/2011 | | DONE |
|
|
|
|
FIRE-Final Inspection | 5/27/2011 | 5/27/2011 | 5/27/2011 | P | FAIL |
Forrest France
|
|
|
Noted items include overdue certifications on the fire extinguishers, exit signs and EM lights at some locations need repair, door hardware at the east side exit is incomplete, locking hardware at the egress side from the shared restrooms to the tenant spaces is not compliant, project is not in condition for fire life safety final at this time.
|
1st review completed | | | 5/27/2011 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/27/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 5/27/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 5/27/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/27/2011 | | DONE |
|
|
|
|
Telephone call | | | 5/27/2011 | | DONE |
|
|
|
5-27-11 called Lesley permit ready///DLD
|
Issue PAID IN FULL permit | | | 5/27/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 5/23/2011 | | 5/27/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | | | 5/23/2011 | | PASS |
April Wing
|
|
|
|
Routing - Addressing | 5/20/2011 | | 5/20/2011 | | PASS |
Terry Records
|
|
|
|
Routing PW Sewer Rating | 5/20/2011 | | 5/20/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 5/20/2011 | | 5/20/2011 | | PASS |
Walt Baumgartner
|
|
|
Deli George moving into former Skippers Seafood site. Existing Grease interceptor on site
|
Plans ACCEPTED BY PLAN TECH | | | 5/19/2011 | | DONE |
|
|
|
5-19-11 ok per Tim W to take in ///dld
|
Plan assigned to (TLW) | 5/19/2011 | | 5/19/2011 | | DONE |
Darla L Downs
|
|
|
|
First Notice | | 6/11/2011 | | | |
|
|
|
|
Application received | | 5/19/2011 | | | |
|
|
|
|