Second Notice | | 6/16/2012 | 7/3/2012 | | DONE |
|
|
|
Mailed 7-2-12
|
First Notice | | 5/26/2012 | 6/6/2012 | | DONE |
|
|
|
|
BLD-Final | 5/15/2012 | 5/16/2012 | 5/16/2012 | P | PASS |
Tom Arcoraci
|
|
|
Jeff -- need 20 min notice Phone #: ###-#### pending ok by fire
|
FIRE-Final Inspection | 5/16/2012 | 5/16/2012 | 5/16/2012 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 5/15/2012 | 5/16/2012 | 5/16/2012 | A | FAIL |
Troy Cobbley
|
|
|
Repair the one non functional emergency light, provide certification for two fire extinguishers and provide verification that the wall between the Green Room and the Stage, with doors #4 and #8 are not now required to be fire rated. I left a message with Dan in plan review requesting clarification. A re-inspection has been scheduled for this afternoon.
|
Permanent Occupancy | | | 5/16/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
BLD-Framing/Rough-in | 3/23/2012 | 3/26/2012 | 3/26/2012 | A | PASS |
Tom Arcoraci
|
|
|
jeff - please call 1/2 hr prior Phone #: ###-#### or ###-#### pending plumb and elec
|
BLD-Conference | 3/12/2012 | 3/13/2012 | 3/13/2012 | A | PASS |
Tom Arcoraci
|
|
|
work in progress slow talked jef thomson
|
BLD-Conference | 3/9/2012 | 3/12/2012 | 3/12/2012 | A | DEFR |
Mike Jordan
|
|
|
Check status of project.
|
Routing - Design Review | 12/5/2011 | | 12/5/2011 | | PASS |
Sarah Schafer
|
|
|
Parking plan provided to staff. No zoning certificate submitted for verification but staff will accept the plan.
|
Telephone call | | | 12/5/2011 | | DONE |
|
|
|
Talked with Steve Simmons.Thought he had resolved the Planning question with Sarah Schafer on the phone. As if I would ask her again and mention the phone conversation to see if shee recalls.
|
Plan Reviewer's activity | | | 12/5/2011 | | DONE |
|
|
|
Took plans to Sarah Schafer cubicle to review any remaining items for Planning before she could sign off plans. She remembered a discussion concerning the parking and signed off on the plans. routing plans to permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/5/2011 | | PASS |
|
|
|
Approved as noted on plans and all attached plan review agencies comments or conditions.
|
Print Occupancy Form | | | 12/5/2011 | | DONE |
|
|
|
|
Telephone call | | | 12/5/2011 | | DONE |
Christina Prado
|
|
|
Called and left message with Steven and gave fees due and advised GC/RCE needed
|
Permit Ready to Issue | | | 12/5/2011 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 12/5/2011 | | DONE |
|
|
|
|
Routing - FIRE | 11/30/2011 | | 12/2/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans.
|
Plan assigned to (DRS) | 8/30/2011 | | 12/2/2011 | | PASS |
Dan Stuart
|
|
|
|
Routing - PLAN CHECK | 12/2/2011 | | 12/2/2011 | | PASS |
Dan Stuart
|
|
|
Approved based on red-line notes on plans and attached plan review comments & conditions. To permit desk to issue.
|
Telephone call | | | 12/2/2011 | | DONE |
|
|
|
Called and left message for Steve Simmons concerning zoning certificate submittal. To call me Monday.
|
Telephone call | | | 12/2/2011 | | DONE |
|
|
|
Called Jeff Thompson, Stage Coach Theatre, to ask about CZC certificate. He new nothing about this but will come in Monday to review with planning.
|
Plan resubmittals received | | | 12/1/2011 | | |
|
|
|
Received a cover letter from Steven Simmons dated 11-30-11 to Dan Stuart, 2 copy of sheet E 2.0 and taken to Dan Stuart
|
Routing - PLAN CHECK | 12/1/2011 | | 12/1/2011 | | PEND |
Dan Stuart
|
|
|
Received requested 2nd copy of resubmittal Sheet E2.0. I took the resubmittal sheet over to fire code analyst station and inserted into office copy of plans and returned plans to fire code review box.
|
Telephone call | | | 11/30/2011 | | DONE |
Dan Stuart
|
|
|
Called Steve Simmons, LCA, to request a 2nd copy of resubmittal plan sheet E2.0. I told Steve I have routed the plans back to fire code analyst but need the 2nd copy before permit could be issued. Said he would get me the 2nd copy.
|
Routing - PLAN CHECK | 11/30/2011 | | 11/30/2011 | | PEND |
Dan Stuart
|
|
|
One copy of resubmital sheet E2.0 was provide with a cover letter in response to my phone call to Jeff Thompson on 11/28/11 after fire failed the resubmittals of 11/28/11 which had not addressed fire code plan review items. I inserted the one copy into the issue set of plans with the cover letter and routed plans to fire code analyst. I called Steve Simmons, architect, to let him know I needed a 2nd copy of plan sheet E2.0.
|
Routing - PLAN CHECK | 11/28/2011 | | 11/30/2011 | | PEND |
Dan Stuart
|
|
|
One copy of resubmittal sheet E2.0 provided in response to my phone message to Jeff Thompson on 11/28/11. Inserted copy recieved into issue set of plans and routed back to fire code analyst and informed him a 2nd copy of sheet E2.0 for office copy of plans would be provided per my conversation with Steve Simmons architect.
|
Routing - FIRE | 11/22/2011 | | 11/28/2011 | | FAIL |
Scott Arellano
|
|
|
Resumbittal items not addressed. Faxed and emailed resubmittal items to architect.
|
Telephone call | | | 11/28/2011 | | DONE |
|
|
|
Called Jeff Thompson, contact with Stage Coach Theatre to let him know the plan review items from the fire code analys had not been part of the recent plan resubmittals and that the plans had failed. Jeff was in a meeting so I left him the message on his answering machine.
|
Routing - PLAN CHECK | 9/21/2011 | | 11/22/2011 | | PASS |
Dan Stuart
|
|
|
Plan resubmittals inserted into original plans. Additional red-lines added to plans and the plan review comments / conditions have been modified to specify items to be verfified by appropriate field inspectors and reference to red-lined items. Routing to fire code analyst for re-review.
|
Plan resubmittals received | | | 11/17/2011 | | |
|
|
|
11-17-11 received 1 cd disk 3 copies of sheets E2.0 & 4 copies of sheets A2.0,A2.1 sent to Dan S.1066
|
Routing - FIRE | 9/17/2011 | | 9/21/2011 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to architect.
|
1st review completed | | | 9/21/2011 | | FAIL |
|
|
|
Failed Design Review, Plan Check, Fire
|
Plan resubmittals requested | | | 9/17/2011 | | DONE |
|
|
|
Copy of plan review comments needing to be addressed by architect e-mailed to Steve Simmons, LCA Architects.
|
Routing - PLAN CHECK | 9/2/2011 | | 9/17/2011 | | FAIL |
Dan Stuart
|
|
|
Resubmittals required. Plan review comments e-mailed to Steve Simmons. Routing to fire code analyst for review.
|
Routing - Design Review | 9/2/2011 | | 9/2/2011 | | FAIL |
Josh Wilson
|
|
|
Needs Zoning Certificate (CZC) per Sarah Schafer.
|
Routing PW Sewer Rating | 9/2/2011 | | 9/2/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 8/31/2011 | | 9/2/2011 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Design Review | 9/2/2011 | | 9/2/2011 | | FAIL |
Sarah Schafer
|
|
|
Sarah Schafer - minor exterior work (accessible parking & access aisle) shown.
A zoning certificate is going to be needed to show how the lot is going to be striped for 25 parking spaces. I left a message with Steven Simmons at LCA.
|
Routing - Addressing | 8/31/2011 | | 8/31/2011 | | PASS |
Terry Records
|
|
|
|
Plan Reviewer's activity | | | 8/30/2011 | | DONE |
Jason Blais
|
|
|
ACHD impact fees due is $0 and an ACHD inspection is not required per document from ACHD provided.
|
Pending Assignment by JCB | 8/29/2011 | | 8/30/2011 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 8/29/2011 | | PASS |
Dan Stuart
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/29/2011 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/29/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 8/16/2011 | | FAIL |
Dan Stuart
|
|
|
Plan Intake for review of plans for change of occupancy T.I. incomplete - failed. Copy of Intake Checklist attached.
|
Application received | | 5/19/2011 | 5/19/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 5/19/2011 | | FAIL |
Carl D Madsen
|
|
|
|