Third Notice | | 11/27/2011 | 11/15/2011 | | DONE |
|
|
|
|
Third Notice | | 10/16/2011 | 11/7/2011 | | DONE |
|
|
|
mailed to Ben Roper (owner rep)
|
Second Notice | | 10/2/2011 | 10/11/2011 | | DONE |
Christina Prado
|
|
|
Faxed 10/11/11
|
First Notice | | 9/2/2011 | 9/22/2011 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/7/2011 | | DONE |
|
|
|
|
Permanent Occupancy | | | 8/23/2011 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 8/4/2011 | 8/8/2011 | 8/8/2011 | A | PASS |
Dave Hannah
|
|
|
ben Phone #: ###-#### ok for perm occ per Jim storey after fire finalss
|
FIRE-Final Inspection | 7/7/2011 | 8/5/2011 | 8/5/2011 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 8/3/2011 | 8/4/2011 | 8/4/2011 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 7/5/2011 | 7/7/2011 | 7/7/2011 | P | NR |
Jim Storey
|
|
|
ken Phone #: ###-####
|
FIRE-Final Inspection | 7/5/2011 | 7/7/2011 | 7/7/2011 | A | PART |
Troy Cobbley
|
|
|
A 30 day temporary occupancy for life safety was given with Gordan's permission until the fire alarm is addressed.
|
FIRE-Conference | 7/6/2011 | 7/6/2011 | 7/6/2011 | A | DONE |
Troy Cobbley
|
|
|
Amy did not arrive but another lady did and I let her know that Gordan with the Boise Fire Dept was ok with a 30 day temporary occupancy as long as the door hardware and the fire sprinklers were addressed. This would leave the fire alarm modifications needing to be completed.
|
FIRE-Final Inspection | 7/5/2011 | 7/5/2011 | 7/6/2011 | P | FAIL |
Troy Cobbley
|
|
|
No items on the correction notice have been addressed.
|
BLD-Final | 7/5/2011 | 7/5/2011 | 7/5/2011 | P | NR |
Tom Arcoraci
|
|
|
Ben Phone #: ###-####
|
FIRE-Final Inspection | 7/1/2011 | 7/1/2011 | 7/1/2011 | P | FAIL |
Troy Cobbley
|
|
|
Provide single action hardware on the restroom and breakroom doors. Replace all painted sprinkler heads as discussed and per NFPA 13 6.2.6.2. Provide for fire alarm notification in the restroom, washroom and breakroom. This work will require permit. Situation was discussed with Ben.
|
BLD-Final | 6/30/2011 | 6/30/2011 | 6/30/2011 | P | NR |
Dave Hannah
|
|
|
Ben-Please call prior to inspection Phone #: ###-#### needs other trades finaled first
|
Issue PAID IN FULL permit | | | 6/23/2011 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 5/24/2011 | 5/24/2011 | 6/22/2011 | | PASS |
Sam Zahorka
|
|
|
|
CHANGE STATUS TO (REV) | | | 6/22/2011 | | |
Sam Zahorka
|
|
|
|
Routing - PUBLIC WORKS | 6/22/2011 | | 6/22/2011 | | PASS |
Connie Baumgartner
|
|
|
additional drinking fountain.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/22/2011 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 6/22/2011 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 6/22/2011 | | DONE |
|
|
|
left vm for larry - permit ready and fees given - also need GC, RCE# and ACHD receipt
|
Permit Ready to Issue | | | 6/22/2011 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/22/2011 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 6/17/2011 | | 6/22/2011 | | PASS |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 6/20/2011 | | |
Barbara Stitt
|
|
|
Received 1 cover transmital, 2 copies of sheet two, inserted into plans and taken back to Sam Z's desk
|
1st review completed | | | 6/17/2011 | | DONE |
|
|
|
Failed - Plan Check
|
Routing - FIRE | 6/16/2011 | | 6/17/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached review
|
Routing - PLAN CHECK | 5/31/2011 | | 6/16/2011 | | FAIL |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 6/16/2011 | | DONE |
Sam Zahorka
|
|
|
|
Routing - Design Review | 5/27/2011 | | 5/31/2011 | | PASS |
Sarah Schafer
|
|
|
Sarah Schafer - exterior landing change
Approved.
|
Routing - PLUMBING | 5/25/2011 | | 5/27/2011 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing - PUBLIC WORKS | 5/24/2011 | | 5/25/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 5/25/2011 | | 5/25/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Pending Assignment by JCB | 5/23/2011 | | 5/24/2011 | | DONE |
Jason Blais
|
|
|
|
Plan Reviewer's activity | | | 5/24/2011 | | DONE |
Jason Blais
|
|
|
Contacted architect to have him contact ACHD to determine if any additional impact fees are due. Written verification from ACHD will need to be provided to our Permit Counter prior to permit issuance.
|
Routing - Addressing | 5/24/2011 | | 5/24/2011 | | PASS |
Terry Records
|
|
|
|
Application received | | 5/23/2011 | 5/23/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/23/2011 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/23/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 5/23/2011 | | PASS |
Sam Zahorka
|
|
|
|