Print Statement | | | 1/6/2012 | | DONE |
|
|
|
|
Second Notice | | 12/30/2011 | 1/3/2012 | | DONE |
|
|
|
|
First Notice | | 12/11/2011 | 12/20/2011 | | DONE |
|
|
|
|
FIRE-Final Inspection | 12/1/2011 | 12/1/2011 | 12/1/2011 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 12/1/2011 | 12/1/2011 | 12/1/2011 | P | PASS |
Tom Arcoraci
|
|
|
Call for a time I can meet Dave Phone #: ###-#### >> Inspection requested via web by David Mortensen
|
Print Occupancy Form | | | 12/1/2011 | | DONE |
Tisha Gallop
|
|
|
|
Permanent Occupancy | | | 12/1/2011 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 10/7/2011 | 10/7/2011 | 10/7/2011 | A | FAIL |
Troy Cobbley
|
|
|
I went over door hardware with the door hardware supplier. He is going to install lever hardware on the west door and leave automatic flush bolts on the inactive leaf. He will provide keyed on the nonrequired door on the northeast corner of the building.
|
BLD-Conference | 8/4/2011 | 8/4/2011 | 8/4/2011 | P | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### >> Inspection requested via web by David Mortensen
|
BLD-Final | 8/4/2011 | 8/4/2011 | 8/4/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
Routing - PLAN CHECK | 6/30/2011 | | 6/30/2011 | | PASS |
Tim L. Woodard
|
|
|
Approved with Redlines. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/30/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 6/30/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 6/30/2011 | | DONE |
|
|
|
|
Telephone call | | | 6/30/2011 | | DONE |
Christina Prado
|
|
|
Called and left message for David gving fees due
|
Permit Ready to Issue | | | 6/30/2011 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 6/30/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (TLW) | 6/7/2011 | | 6/30/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 6/29/2011 | | DONE |
|
|
|
received 2 copies of sheet P1 taken to Tim W.
|
Routing - PLUMBING | 6/29/2011 | | 6/29/2011 | | PASS |
Daryl Spivey
|
|
|
1. Move RPBP's from where shown on plan to location above mop sink.
2. All floor sinks must be readily accessible and visible. Not to be installed under cabinets or equipment out of view.
3. All water, waste and venting to be installed per 2003 UPC.
|
Plan resubmittals received | | | 6/29/2011 | | DONE |
Christina Prado
|
|
|
Received two sets of plans A-1, P1 & L1. Plans taken to plumbing and inserted with plans in review
|
Routing - PLUMBING | 6/24/2011 | | 6/28/2011 | | FAIL |
Daryl Spivey
|
|
|
1. supply a plumbing print with ALL fixtures piping drawn on plan to meet 2003 requirements.
|
Routing - PLAN CHECK | 6/24/2011 | | 6/24/2011 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 6/24/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 6/23/2011 | | DONE |
|
|
|
received 2 copies of sheet P1 taken to Timn W
|
Routing - PLUMBING | 6/20/2011 | | 6/22/2011 | | FAIL |
Daryl Spivey
|
|
|
1. Supply a plumbing drawing with all piping drawn in and sized. Design plumbing to meet 2003 UPC requirements.
|
Routing - PLAN CHECK | 6/8/2011 | | 6/20/2011 | | PEND |
Tim L. Woodard
|
|
|
Needs reviewed by plumbing. TLW
|
Routing - Addressing | 6/8/2011 | | 6/8/2011 | | PASS |
Terry Records
|
|
|
|
Routing PW Sewer Rating | 6/8/2011 | | 6/8/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 6/7/2011 | | 6/8/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/7/2011 | | DONE |
|
|
|
ok per Tim W to take in as a level 2
|
Recd Pcfee & Taken To Pln CK | | | 6/7/2011 | | DONE |
|
|
|
|
CHANGE STATUS TO (REV) | | | 6/7/2011 | | |
Sam Zahorka
|
|
|
|
Intake Approval | | | 6/7/2011 | | PASS |
Tim L. Woodard
|
|
|
6-7-
|
Intake Approval | | | 5/24/2011 | | FAIL |
Tim L. Woodard
|
|
|
|
Application received | | 5/24/2011 | | | |
|
|
|
|