Permit Information
Permit NumberBLD11-01151
StatusFinaled
Name VERTICAL CORP
Site Address 720 E PARK BLVD Unit: 105
Project NameMK CENTRAL PLAZA
Customer Number 
ePlanReviewNo
Description
(NORTHWEST NAZARENE UNIVERSITY - MK CENTRAL PLAZA - EASE SIDE) Fire sprinklers used for unlimited building area. To remodel a 4,410 square foot area located on the 1st story (Ease side) of MK Central Plaza to be used as classrooms for adult students. Work is to include interior nonbearing walls, new doors, and interior finishes. The existing smoke control system, including passive smoke barriers, is required to be maintained as originally approved. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. Required accessible upgrades to restrooms will be done under a separate future permit. The owner has agreed to apply for an upgrade permit by September 26, 2011. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. The fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  1/23/2013 DONE
Third Notice 5/31/20125/30/2012 DONE
Third Notice 5/2/20125/17/2012 DONE
faxed to GC
Third Notice 4/3/20124/18/2012 DONE
faxed to GC
Second Notice 3/25/20123/29/2012 DONE
First Notice 3/4/20123/15/2012 DONE
Permanent Occupancy  2/23/2012 DONE
DetailsTisha Gallop
FIRE-Final Inspection2/14/20122/14/20122/14/2012APASS
DetailsForrest France
BLD-Final1/4/20121/4/20121/4/2012PPASS
DetailsDave Hannah
Entry doors are now installed. Thanks! Phone #: ###-#### >> Inspection requested via web by Todd Weltner ok for perm occ
BLD-Final9/7/20119/7/20119/7/2011PPART
DetailsDave Hannah
Todd Phone #: ###-#### ok for temp occ need to check front door after its installed
FIRE-Final Inspection9/7/20119/7/20119/7/2011PPASS
DetailsForrest France
Fire life safety finaled.
BLD-Framing/Rough-in7/27/20117/27/20118/3/2011PPASS
DetailsDave Hannah
todd - late afternoon please Phone #: ###-####
Issue PAID IN FULL permit  7/15/2011 DONE
DetailsChristina Prado
Plan assigned to (CJW)5/27/2011 7/7/2011 PASS
DetailsCarl Westfall
Routing - PLAN CHECK7/6/2011 7/7/2011 DONE
DetailsCarl Westfall
Prepared drawings for issuance.
PLANS/APPL TAKEN TO FRONT DESK  7/7/2011 DONE
Print Occupancy Form  7/7/2011 DONE
Permit Ready to Issue  7/7/2011 DONE
DetailsTisha Gallop
Telephone call  7/7/2011 DONE
DetailsTisha Gallop
called Tom Houston (applicant) and left vm that permit is ready, fees, need GC/RCE/form, and ACHD. Called Katie Butler (arch.rep.) and told her permit is ready, fees and need GC/RCE/form and ACHD since occupant load increased.
Routing - FIRE7/2/2011 7/6/2011 PASS
DetailsTim Frost
Please, see attached review.
Routing - PLAN CHECK6/17/2011 7/2/2011 PASS
DetailsCarl Westfall
Drawings approved after 1st complete review. "Red line" notes added to the drawings.
Plan resubmittals received  6/29/2011 DONE
received 1 response and 2 copies of sheets G0.1,A2.1,A2.2,A6.1,A8.1,A10.1,MO.1,M2.1,E0.1,E1.1
Routing - FIRE6/15/20116/15/20116/17/2011 FAIL
DetailsScott Arellano
Full review will be completed when IBC issues have been resolved.
1st review completed  6/17/2011 DONE
Route to Impact Fee Review6/15/20116/20/20116/16/2011 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - PLAN CHECK6/2/2011 6/15/2011 FAIL
DetailsCarl Westfall
Could not continue the IBC plan review because there were too many issues. Sent an E-mail to the Architect and his representative explaining what the issues were and asking for a resolution.
Routing - PUBLIC WORKS5/27/2011 6/2/2011 PASS
DetailsBeverly Mountain
Routing - PLANNING6/2/2011 6/2/2011 PASS
DetailsScott Spjute
Scott Spjute
Routing PW Sewer Rating6/2/2011 6/2/2011 PASS
DetailsConnie Baumgartner
Routing - Addressing6/1/2011 6/1/2011 PASS
DetailsApril Wing
Application received 5/27/20115/27/2011 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  5/27/2011 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  5/27/2011 DONE
DetailsTisha Gallop
Intake Approval  5/27/2011 PASS
DetailsTim L. Woodard
Pending Assignment by JCB5/27/2011 5/27/2011 DONE
DetailsJason Blais