BLD-Final | 9/8/2011 | 9/8/2011 | 9/8/2011 | P | PASS |
Tony Young
|
|
|
Zach please call 30 min before going out so he can meet you there. Phone #: ###-####
|
DOC - Permit Finaled | 9/8/2011 | 9/8/2011 | 9/8/2011 | P | PASS |
Tony Young
|
|
|
|
Plan assigned to (PEP) | 6/1/2011 | 6/1/2011 | 6/23/2011 | | DONE |
Perry Paine
|
|
|
|
BLD-Foundation | 6/17/2011 | 6/20/2011 | 6/20/2011 | A | PASS |
Dave Hannah
|
|
|
mike Phone #: ###-####
|
BLD-Footing | 6/15/2011 | 6/16/2011 | 6/16/2011 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 6/15/2011 | 6/15/2011 | 6/16/2011 | P | CANC |
Dave Hannah
|
|
|
Mike Phone #: ###-####
|
OVERRIDE | | | 6/1/2011 | | |
|
|
|
|
Routing Walk-In (Zoning) | 6/1/2011 | 6/1/2011 | 6/1/2011 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 6/1/2011 | 6/1/2011 | 6/1/2011 | A | DONE |
Tisha Gallop
|
|
|
|
Routing Walk-In (PW Hillside) | 5/31/2011 | 5/31/2011 | 6/1/2011 | P | DONE |
Jim Wyllie
|
|
|
Jim approved plans with conditions addressed in memo. Contractor also needs to get plans stamped by engineer to continue routing process
|
Case Summary (BLD) | | | 6/1/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/1/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 6/1/2011 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 6/1/2011 | | DONE |
Tisha Gallop
|
|
|
|
Meeting | | | 5/31/2011 | | DONE |
Christina Prado
|
|
|
Contractor met with Jim for hillside requirements. Approved with conditions on memo. Plans not stamped by engineer, verify done when contractor returns and route to planning with copy of memo
|
Application received | | 5/31/2011 | | | |
|
|
|
|