Second Notice | | 12/30/2011 | 1/3/2012 | | DONE |
|
|
|
|
First Notice | | 12/17/2011 | 12/20/2011 | | DONE |
|
|
|
|
BLD-Conference | 12/14/2011 | 12/14/2011 | 12/15/2011 | P | CANC |
Jim Sly
|
|
|
|
BLD-Final | 12/7/2011 | 12/14/2011 | 12/14/2011 | A | PASS |
Jim Sly
|
|
|
Rick phone 1 805 407 4443 See if Electr contr got permit for exit sign and finaled. No Electr wiring done ....All exit signs are nuclear.
|
BLD-Conference | 12/7/2011 | 12/7/2011 | 12/7/2011 | P | DONE |
Jim Sly
|
|
|
Rick Darla -###-#### Phone #: 1-###-#### ok per Jim to sent for this pm//dld Darla found Electr....No permit or inspection. Met with tenant Rick ......he said he would talk to Gen. Contr about having Electr Contr pull permit for 1 exit sign and obtain final. I will follow up 1 week.
|
Print Occupancy Form | | | 12/7/2011 | | DONE |
|
|
|
|
Permanent Occupancy | | | 12/7/2011 | | DONE |
|
|
|
|
BLD-Final | 11/16/2011 | 11/17/2011 | 11/17/2011 | P | PASS |
Jim Sly
|
|
|
Tim Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 11/16/2011 | 11/17/2011 | 11/17/2011 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Conference | 10/27/2011 | 10/28/2011 | 10/28/2011 | A | DONE |
Troy Cobbley
|
|
|
I went over door hardware issues and exit sign placement. Emergency lighting is not required per plan review.
|
BLD-Conference | 10/27/2011 | 10/28/2011 | 10/28/2011 | A | CANC |
Jim Sly
|
|
|
Tim Phone #: ###-####////cancelled by Tim, needed fire conf instead
|
BLD-Framing/Rough-in | 10/11/2011 | 10/11/2011 | 10/11/2011 | P | PASS |
Jim Sly
|
|
|
Tim phone ###-####
|
BLD-Framing/Rough-in | 10/10/2011 | 10/11/2011 | 10/11/2011 | A | CANC |
Jim Sly
|
|
|
tim Phone #: ###-#### Re-sched......
|
BLD-Conference | 9/6/2011 | 9/7/2011 | 9/7/2011 | A | DONE |
Jim Sly
|
|
|
jim - 10:00 am if possible please - 8420 fairview Phone #: ###-####
|
Override - Parcel Holds | | | 7/14/2011 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/14/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (TLW) | 6/16/2011 | | 6/22/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 6/22/2011 | | 6/22/2011 | | PASS |
Tim L. Woodard
|
|
|
Talked issues through with architect. Redlined plans for compliance. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/22/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 6/22/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 6/22/2011 | | DONE |
|
|
|
|
Telephone call | | | 6/22/2011 | | DONE |
Christina Prado
|
|
|
Called and left message for Bart at 3:45. Advised fees due and need GC before permit can be issued
|
Override - Parcel Holds | | | 6/22/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 6/22/2011 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 6/16/2011 | | 6/20/2011 | | FAIL |
Tim L. Woodard
|
|
|
Need to know the overall building area with out considering fire wall. Also need to know the type of anchor bolt being used in steel lintel detail. Tim Woodard
|
Plan Modification Accepted | | | 6/16/2011 | | DONE |
Barbara Stitt
|
|
|
Plan modification accepted to remodel existing entry and add a door to existing wall (north wall of current tenant). Submitted on sheet A1 with a structural calc sheet (8 1/2 x11) and a new cert of value.
|
Permit Ready to Issue | | | 6/10/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 6/10/2011 | | DONE |
Tisha Gallop
|
|
|
called Bart Miller to tell him permit is ready, he wanted to speak with Tim Woodard to make appt., he did not want to know fees and I did not get a chance to tell him need GC/RCE/form.
|
Plan assigned to (TLW) | 6/2/2011 | | 6/9/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 6/2/2011 | | 6/9/2011 | | PASS |
Tim L. Woodard
|
|
|
Tim Woodard
|
1st review completed | | | 6/9/2011 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/9/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 6/9/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 6/9/2011 | | DONE |
|
|
|
|
Application received | | 6/1/2011 | 6/1/2011 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/1/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 6/1/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/1/2011 | | DONE |
Barbara Stitt
|
|
|
|