Third Notice | | 8/16/2011 | 8/16/2011 | | DONE |
|
|
|
|
Second Notice | | 8/4/2011 | 8/11/2011 | | DONE |
|
|
|
|
First Notice | | 7/24/2011 | 7/25/2011 | | DONE |
Christina Prado
|
|
|
Mailed to Parcel Owner
|
BLD-Final | 7/14/2011 | 7/14/2011 | 7/15/2011 | P | PASS |
Jim Storey
|
|
|
Doug Phone #: ###-#### around 3:00
|
FIRE-Final Inspection | 7/14/2011 | 7/14/2011 | 7/14/2011 | P | PASS |
Forrest France
|
|
|
Reinspection passed, corrections finished. Life safety finaled.
|
BLD-Final | 7/13/2011 | 7/14/2011 | 7/14/2011 | A | DEFR |
Jim Storey
|
|
|
call when go out//Doug Phone #: ###-####
|
FIRE-Final Inspection | 7/13/2011 | 7/14/2011 | 7/14/2011 | A | FAIL |
Forrest France
|
|
|
Correction items include; repair one exit sign and one emergency light at the main entry area, provide directional arrows per plan at two exit signs in the east and west central core area, certification tag at the PFE near the second exit is 6 yrs. overdue. Noted wall infill at the mechanical room per plan review annotation is not completed.
|
Permanent Occupancy | | | 7/14/2011 | | DONE |
Barbara Stitt
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/13/2011 | | DONE |
Tisha Gallop
|
|
|
plan mod picked up and paid for.
|
Plan assigned to (TLW) | 7/5/2011 | | 7/11/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 7/11/2011 | | 7/11/2011 | | FAIL |
Tim L. Woodard
|
|
|
No correction was made. I will call to discuss correction further as to clear up any confusion. TLW
|
Routing - PLAN CHECK | 7/11/2011 | | 7/11/2011 | | PASS |
Tim L. Woodard
|
|
|
After discussion with the architect an agreement was made to fill in storage room door opening and have access from another tenant space. This will reduce the diagonal enough to allow door separation as submitted. I was asked to redline this change to facilitate a time sensitive schedual. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/11/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 7/11/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 7/11/2011 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 7/11/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 7/11/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 7/11/2011 | | DONE |
Tisha Gallop
|
|
|
called Marla and told her permit is ready and fees.
|
Telephone call | | | 7/11/2011 | | DONE |
Tisha Gallop
|
|
|
called Marla and told her plan mod is ready and fees.
|
Plan resubmittals received | | | 7/8/2011 | | |
|
|
|
Received 2 copies of sheet A1.0 and taken to Tim Woodard
|
Routing - PLAN CHECK | 7/5/2011 | | 7/7/2011 | | FAIL |
Tim L. Woodard
|
|
|
Exit separation not compliant. TLW
|
Plan Modification Accepted | | | 7/5/2011 | | DONE |
Tisha Gallop
|
|
|
Plan modification accepted for Bld11-01196 (Idaho Real Estate Commission) to add wall and door to separate common area from future open office. See revision 2. Submitted on plan sheet A1.0; routed to Tim Woodard.
|
BLD-Framing/Rough-in | 6/24/2011 | 6/27/2011 | 6/27/2011 | A | PASS |
Jim Storey
|
|
|
Doug-Please call at least 30 mins prior to inspection Phone #: ###-####
|
Permit Ready to Issue | | | 6/24/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 6/24/2011 | | DONE |
Tisha Gallop
|
|
|
called Marla and told her permit is ready and fees.
|
Issue PAID IN FULL permit | | | 6/24/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 6/23/2011 | | 6/23/2011 | | PASS |
Tim L. Woodard
|
|
|
Approved with resubmittals aborting the southwest expansion area. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/23/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 6/23/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 6/23/2011 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 6/2/2011 | | 6/23/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 6/22/2011 | | DONE |
Christina Prado
|
|
|
Received two copies of sheets A0.0 & A1.0 along with one response letter. Routed to Tim Woodard for additional review
|
1st review completed | | | 6/17/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 6/8/2011 | | 6/17/2011 | | FAIL |
Tim L. Woodard
|
|
|
Left message with architect. Exits too close together and need one hour corridor. Tim Woodard
|
Routing - PUBLIC WORKS | 6/2/2011 | | 6/8/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 6/8/2011 | | 6/8/2011 | | PASS |
April Wing
|
|
|
|
Routing PW Sewer Rating | 6/8/2011 | | 6/8/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 6/2/2011 | 6/2/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/2/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 6/2/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/2/2011 | | DONE |
Barbara Stitt
|
|
|
|