Third Notice | | 4/3/2012 | 4/12/2012 | | DONE |
|
|
|
|
Print Statement | | | 4/12/2012 | | DONE |
|
|
|
|
Second Notice | | 3/29/2012 | 3/29/2012 | | DONE |
|
|
|
|
First Notice | | 3/9/2012 | 3/19/2012 | | DONE |
|
|
|
|
BLD-Final | 2/27/2012 | 2/28/2012 | 2/28/2012 | A | PASS |
Mike Jordan
|
|
|
Rob Phone #: ###-####. ok for perm occ.
|
Permanent Occupancy | | | 2/28/2012 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 2/24/2012 | 2/27/2012 | 2/27/2012 | A | NR |
Mike Jordan
|
|
|
Rob Phone #: ###-####. Everything ok, needs zoning to sign off first.
|
Zoning Approval | 2/27/2012 | 2/27/2012 | 2/27/2012 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 2/23/2012 | 2/23/2012 | 2/23/2012 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 2/22/2012 | 2/23/2012 | 2/23/2012 | A | FAIL |
Troy Cobbley
|
|
|
Provide the missing door hardware and the missing exit sign. Rescheduled for this afternoon.
|
BLD-Energy code compliance | 1/12/2012 | 1/12/2012 | 1/12/2012 | P | PASS |
Mike Jordan
|
|
|
rob Phone #: ###-####
|
OVERRIDE | | | 1/5/2012 | | |
|
|
|
|
Plan assigned to (SRZ) | 1/5/2012 | 1/5/2012 | 1/5/2012 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/5/2012 | | DONE |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 1/5/2012 | | DONE |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 1/5/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/5/2012 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 1/5/2012 | | DONE |
Barbara Stitt
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/5/2012 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 1/5/2012 | | DONE |
Barbara Stitt
|
|
|
|
CHANGE STATUS TO (REV) | | | 1/5/2012 | | |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 1/5/2012 | | 1/5/2012 | | PASS |
Sam Zahorka
|
|
|
Plan modification approved per red-lined plans.
|
BLD-Other | 1/3/2012 | 1/4/2012 | 1/4/2012 | A | PASS |
Mike Jordan
|
|
|
Rob Phone #: ###-####. Interior shear walls and holdowns, added hold downs on exterior walls at phase 2.
|
FIRE-Final Inspection | 12/8/2011 | 12/9/2011 | 12/9/2011 | A | PART |
Troy Cobbley
|
|
|
The east side remodeled area life safety is passed.
|
FIRE-Final Inspection | 12/7/2011 | 12/8/2011 | 12/8/2011 | P | FAIL |
Troy Cobbley
|
|
|
This inspection was for the east side remodeled area only. The two exit discharge lights need to be repaired. Also a fire alarm sytem is shown to be installed but has not been. It appears to be only there to monitor the duct smoke detectors. I told the contractor that the remote annunciators as installed are ok if the fire alarm panel is installed. If it is not installed then the correct remote annunciators need to be installed. The duct smoke detectors will need to be tested when a decision has been made.
|
BLD-Other | 10/11/2011 | 10/12/2011 | 10/12/2011 | P | PASS |
Mike Jordan
|
|
|
Soffit shear---Request early---Rob Phone #: ###-####
|
BLD-Framing/Rough-in | 10/4/2011 | 10/5/2011 | 10/5/2011 | A | PASS |
Mike Jordan
|
|
|
rob Phone #: ###-####Sofitt and barrel cieling ok.
|
BLD-Framing/Rough-in | 9/26/2011 | 9/27/2011 | 9/27/2011 | A | PART |
Mike Jordan
|
|
|
steel stud framing//Rob Phone #: ###-####. Interior steel stud walls only ok to cover. Need framing details for barrell ceiling. Aslo need to verifiy additional holdowns at extrior shear wall locations.
|
BLD-Other | 9/20/2011 | 9/21/2011 | 9/21/2011 | P | PASS |
Mike Jordan
|
|
|
insulation and shear wall//Rob Phone #: ###-####. Wall and roof insulation on clere story ok. Nailing and hold downs on both interior shear walls ok.
|
BLD-Conference | 9/13/2011 | 9/14/2011 | 9/14/2011 | A | DONE |
Mike Jordan
|
|
|
Rob Phone #: ###-####
|
BLD-Wall cover | 9/9/2011 | 9/9/2011 | 9/9/2011 | P | PASS |
Mike Jordan
|
|
|
SHEAR ROOF---Rob Phone #: ###-####. Nails were used as per approved plan. roof ok, clere story ok.
|
BLD-Framing/Rough-in | 9/1/2011 | 9/2/2011 | 9/2/2011 | A | FAIL |
Mike Jordan
|
|
|
Rob Phone #: ###-####. Needs to provide staple equivelabcy chart from engineer for shear walls on clere story and for osb attachment on clere story.
|
BLD-Foundation | 8/8/2011 | 8/9/2011 | 8/9/2011 | A | PASS |
Mike Jordan
|
|
|
Rob Phone #: ###-####. Stemwall for new vault wall. Also discussed required special inspections for project.
|
BLD-Footing | 8/3/2011 | 8/5/2011 | 8/5/2011 | P | PASS |
Tom Arcoraci
|
|
|
Rob Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/1/2011 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 7/28/2011 | | 7/29/2011 | | PASS |
Sam Zahorka
|
|
|
Recieved an routed transmittal,structural calcs and plan sheets A5.02, S1.01, S2.01, S2.02, S2.03, S3.01, to Outsource Structural Review.
|
Routing - PLAN CHECK | 7/19/2011 | | 7/29/2011 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/29/2011 | | DONE |
Sam Zahorka
|
|
|
|
Inspection Record Card- Bld | | | 7/29/2011 | | DONE |
|
|
|
|
Telephone call | | | 7/29/2011 | | DONE |
Christina Prado
|
|
|
Called and told Chad fees due
|
Override - Parcel Holds | | | 7/29/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 7/29/2011 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (SRZ) | 6/21/2011 | | 7/29/2011 | | PASS |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 7/28/2011 | | DONE |
Tisha Gallop
|
|
|
received transmittal, three copies of structural calcs and three copies of plan sheets A5.02, S1.01, S2.01, S2.02, S2.03, S3.01; taken to Sam Zahorka.
|
Telephone call | | | 7/28/2011 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Routing Off Site - STRUCTURAL | 7/12/2011 | | 7/20/2011 | | FAIL |
Barbara Stitt
|
|
|
Had to send the office set of plans. I contacted the applicant and requested a third set. Called Action Couriers @ 1:40pm for pick up
Failed 1st review. Corrections needed. sent to the Architect
|
Routing - FIRE | 7/16/2011 | | 7/19/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 7/19/2011 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 7/18/2011 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/16/2011 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 6/29/2011 | | 7/16/2011 | | PEND |
Sam Zahorka
|
|
|
Pending other reviewing agencies to pass.
|
Routing - Design Review | 6/29/2011 | | 6/29/2011 | | PASS |
Josh Wilson
|
|
|
Josh Wilson - DRH11-00056
|
Routing - PLANNING | 6/29/2011 | | 6/29/2011 | | PASS |
Joshua Johnson
|
|
|
Josh Johnson - CUP11-00021
|
Routing - Erosion and Sediment | 6/28/2011 | | 6/29/2011 | | PASS |
Steven Webb
|
|
|
ESC plan waiver request is approved according to the ESC Permit Conditions. ESC11-00398
|
Routing - PUBLIC WORKS | 6/22/2011 | | 6/28/2011 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Drainage | 6/23/2011 | | 6/27/2011 | | PASS |
Brian Murphy
|
|
|
|
Routing - Addressing | 6/23/2011 | | 6/23/2011 | | PASS |
Terry Records
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/21/2011 | | DONE |
Barbara Stitt
|
|
|
|
Pending Assignment by JCB | 6/21/2011 | | 6/21/2011 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 6/21/2011 | | PASS |
|
|
|
Received ESC App, Waiver Request, Note on plans for Deffered submittals, SAT ceiling install notes, Project Start Up for Special Inspections Form #310 and signed #304 form.
|
Application received | | 6/8/2011 | 6/8/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 6/8/2011 | | FAIL |
|
|
|
Copy of checklist attached indicating needed items.
|
Recd Pcfee & Taken To Pln CK | | | 6/8/2011 | | DONE |
Barbara Stitt
|
|
|
|