BLD-Final | 9/19/2011 | 9/19/2011 | 9/19/2011 | P | PASS |
Mike Jordan
|
|
|
rustin Phone #: ###-####
|
DOC - Permit Finaled | 9/19/2011 | 9/19/2011 | 9/19/2011 | P | PASS |
Mike Jordan
|
|
|
Handrail has been repaired. Residential certificate of occupancy was issued.
|
BLD-Final | 9/16/2011 | 9/16/2011 | 9/19/2011 | P | FAIL |
Mike Jordan
|
|
|
russ Phone #: ###-####
|
BLD-Final | 9/15/2011 | 9/16/2011 | 9/16/2011 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Rustin Ray. Needs electrical final first.
|
BLD-Energy code compliance | 8/22/2011 | 8/23/2011 | 8/23/2011 | A | PASS |
Mike Jordan
|
|
|
Rusten Phone #: ###-####
|
BLD-Energy code compliance | 8/21/2011 | 8/22/2011 | 8/22/2011 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Rustin Ray
|
BLD-Energy code compliance | 8/19/2011 | 8/19/2011 | 8/19/2011 | P | NR |
Jim Sly
|
|
|
Rustin Phone #: ###-#### Called Rustin....cannot OK to cover until Bonus room wall corrections are completed properly.
|
BLD-Energy code compliance | 8/18/2011 | 8/18/2011 | 8/18/2011 | P | FAIL |
Mike Jordan
|
|
|
RUSTIN Phone #: ###-####. Provide top and bottom plates on knee walll for bonus room trusses.Provide load path on non bearing wall @ triple LVL for A3 and A4 trusses.
|
BLD-Framing/Rough-in | 8/17/2011 | 8/17/2011 | 8/17/2011 | P | FAIL |
Mike Jordan
|
|
|
rustin Phone #: ###-####. Fireblocking and furouts for kneewalls and vaulted areas completed. ok to insulate. All other items not yet repaired.
|
BLD-Framing/Rough-in | 8/14/2011 | 8/15/2011 | 8/15/2011 | A | FAIL |
Mike Jordan
|
|
|
Approved set of plans should be onsite. They might be in the tube out front. Phone #: ###-#### >> Inspection requested via web by Rustin Ray. Fireblock area at concelled space at tub/shower at ceiling, SeaL AROUND GAS PIPE PENETRATION THROUGH WALL AND BOTTOM PLATE (south wall), Connect bottom chord on C3 truss as per truss engineering. Provide code compliant steps from garage. Justify bearing point change on A3 and A4 truss, provide engineered fix from BMC. Fireblock at plumbing penetration by stairs. Bonus room knee wall trusses need to be furred out to accept R21 insulation and encapsulated. All other vaulted areas need to be encapsulated as well. Provide correct portal frame framing as shown on sheet 1 and 3 on approved plans. Correction notice posted, not ok to insulate.
|
Plan resubmittals received | | | 8/8/2011 | | PASS |
|
|
|
manual j resubmitted
|
Routing - MECHANICAL | 8/8/2011 | | 8/8/2011 | | PASS |
Troy James
|
|
|
approved resubmittal of manual j
|
BLD-Foundation | 6/27/2011 | 6/27/2011 | 6/27/2011 | P | PART |
Mike Jordan
|
|
|
ben Phone #: ###-####
|
BLD-Footing | 6/24/2011 | 6/24/2011 | 6/24/2011 | P | PASS |
Mike Jordan
|
|
|
BEN Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/23/2011 | | DONE |
|
|
|
|
OVERRIDE | | | 6/22/2011 | | |
|
|
|
|
Plan assigned to (CDM) | 6/9/2011 | 6/9/2011 | 6/22/2011 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 6/21/2011 | | 6/22/2011 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 6/22/2011 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/22/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/22/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/22/2011 | | DONE |
|
|
|
|
Telephone call | | | 6/22/2011 | | DONE |
Christina Prado
|
|
|
Called Stan with Stetson Homes. Advised fees and that Rp is needed
|
Permit Ready to Issue | | | 6/22/2011 | | DONE |
Christina Prado
|
|
|
|
Routing - MECHANICAL | 6/21/2011 | | 6/21/2011 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 6/17/2011 | | 6/17/2011 | | FAIL |
Troy James
|
|
|
wrong equipment selection, talked to designer
|
Route to Impact Fee Review | 6/8/2011 | 6/13/2011 | 6/16/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - MECHANICAL | 6/13/2011 | | 6/14/2011 | | FAIL |
Troy James
|
|
|
sent email for corrections
|
Routing - PLANNING | 6/10/2011 | | 6/13/2011 | | PASS |
Colleen T Carroll
|
|
|
R-1C setbacks shall apply as per S.S.
|
Routing - Addressing | 6/9/2011 | | 6/10/2011 | | PASS |
Terry Records
|
|
|
|
Routing - PUBLIC WORKS | 6/10/2011 | | 6/10/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Intake Approval | | | 6/9/2011 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/9/2011 | | DONE |
|
|
|
|
Application received | | 6/8/2011 | | | |
|
|
|
|