Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD11-01268
StatusFinaled
Name INLAND IDAHO LLC
Site Address 13626 W BALDCYPRESS ST
Project NameAFFINITY - SECTION B
Customer Number 
ePlanReviewNo
Description
AFFINITY AT BOISE-Section B- Section 'B' (Center Core) PLAN MOD - 3/12/11 - ADDITION OF RESIDENTIAL RANGE, RESIDENTIAL SPRINKLERED HOOD AND EXHAUST SYSTEM, WITH ACCESSIBLE FRONT APPROACH COUNTER SPACE, WITHIN THE ORIGINAL LOBBY 180 COFFEE BAR AREA.. OPERATION AND CONNECTION OF THE EXHAUST HOOD SUPRESSION SYSTEM SHALL BE AS REGULATED BY THE FIRE DEPARTMENT. THIS UNIT IS NOT APPROVED AS TYPE I HOOD / EXHAUST SYSTEM. DRS To construct a four story 1-hour fire rated, wood frame, 66-unit, commercial apartment building of 64,558 sq. ft.(16,519 s.f. - 1st fl / 16,013 s.f. - 2 thru 4th fl.). There are 13 units @ 742 s.f.; 4 @ 553 s.f. and 28 @ 568 s.f.; 3 @ 762 s.f.; 6 @ 540 and 12 @ 457 s.f. The first floor Center Core has accessory support areas.Two (2) 2-hour combination fire walls & Horizontal exits are being constructed between the West Wing / Center Core and East Wing / Center Core portions for allowable area compliance of Center Core. There is also a 2-hour exit stair enclosure toward the west end of the Center core. This building is fully sprinkler W/ 13R system for allowable area increase, addition of 1-story and for occupancy use compliance; alarm with notification system; 1-hour exit corridors connecting the 2-hour stair enclosure and both horizontal exits; and mechanical shaft assemblies are indicated as 2-hour rated. Each floor has one exit into a rated stair enclosure and 2 exits through a horizontal exit. All work to be in accordance with the reviewed plans, red-lined notes on plans and attached plan review comments & conditions of all provided plan reviews. CUP10-00052 DRH10-00222 12/14/11 - Resubs of New Sheets A2.5.1, A2.5.2, A2.5.3, A4.3, A4.5, A8.0, A8.1, A10.0 & A10.1 SUBMITTED 11/18/11 INSERTED INTO OFFICE COPY OF PLANS AND COPY OF SHEETS TO JOB SITE FOR INSTALL IN FIELD COPY.
Sheets S2.3.3, S2.5.2, S2.5.3 & S5.1 SUBMITTED 11/18/11 INSERTED INTO OFFICE COPY OF PLANS AND COPY TO FIELD FOR JOB SET.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 9/3/201210/25/2012 DONE
BLD-Final8/24/20128/24/20128/24/2012PPASS
DetailsJim Sly
Ed Phone #: ###-####
OK for Perm Occ.
Permanent Occupancy  8/24/2012 DONE
DetailsTisha Gallop
MISC ACTIONS  8/24/2012 DONE
DetailsTisha Gallop
Name of project has changed from "Traditions at Boise" to "Affinity at Boise". See e-mail from Alan Springer attached in documents. The owner is still Traditions at Boise LLC.
PubWorks Occupancy Approval8/22/20128/22/20128/22/2012 DONE
Details
FIRE-Final Inspection8/21/20128/21/20128/21/2012PPASS
DetailsTroy Cobbley
Life safety passed.
Zoning Approval7/13/20127/13/20127/13/2012 PASS
DetailsJosh Wilson
BLD-Final7/3/20127/5/20127/5/2012PPART
DetailsJim Sly
rob this is for the 3rd & 4th floors Phone #: ###-####
OK for Temp Occ. 3rd and 4th floors tower 1 and 2 (A&B).
FIRE-Final Inspection7/2/20127/2/20127/2/2012PCANC
DetailsTroy Cobbley
Area "B" 3rd and 4th floors life safety will be a pass when the project related fire alarm system for this area is tested. Smoke alarms tested.
BLD-Other6/25/20126/25/20126/25/2012PPASS
DetailsJim Sly
Temporary Certificate of Occupancy Phone #: ###-#### >> Inspection requested via web by Rob Fraser
OK for Temp Occ. See prev. fire Notes.
Temporary Occupancy6/25/20129/23/20126/25/2012 DONE
DetailsChristina Prado
Zoning Approval Temp6/25/20126/25/20126/25/2012 PASS
DetailsJosh Wilson
Bond in place for landscaping
FIRE-Conference6/14/20126/15/20126/15/2012ADONE
DetailsTroy Cobbley
The additional emergency lighting in the second floor common rooms and the first floor movie room is not going to be required per Dan Stuart in plan review.
BLD-Final6/13/20126/14/20126/14/2012PNR
DetailsJim Sly
Rob Phone #: ###-####
FIRE-Final Inspection6/13/20126/14/20126/14/2012APART
DetailsTroy Cobbley
Life safety passed in area "A" and "B", first and second floors. A temporary occupancy is given with Romeo and Scott's permission. Will need possible additional emergency lighting in the second floor common rooms and the first floor movie room. I will verify with Dan Stuart.
FIRE-Conference5/21/20125/21/20125/21/2012PDONE
DetailsTroy Cobbley
Rod and I went over life safety requirements. I went over the three options for fire dept access designation. The fire hydrant in the northwest corner of the property needs the 5" outlet turned to where it is accessible to the fire dept. A knox box needs to be provided. It appears that exit sign/emergency lights, if placed per plans, will be adequate. The "area of refuge" is noted in the fire dept review as being placed in the stairwells with the requirements for communication. Per Rod the "area of refuge" is in the main corridor. I deferred that any changes will need to be requested through Scott Arellano in plan review. I suggested that the architect become involved.
FIRE-Conference4/27/20124/27/20124/27/2012PDONE
DetailsTroy Cobbley
The standpipe hose valves located on all of the floors at the fire wall per the sprinkler plans were to be mounted recessed in the corridor walls. They have been installed surface mounted on the walls and are possibly encroaching into the egress path. After speaking to Dan Stuart, I spoke to the job site superintendant about having the architect submit to the plan reviewer for approval of this installation.
BLD-Framing/Rough-in4/3/20124/3/20124/3/2012PPART
DetailsJim Sly
2 hr wall in the attic//Rob Fraser ###-####
Need to look at soffit on South side of tower 2.
CHANGE STATUS TO (ISS)  4/3/2012 DONE
DetailsTisha Gallop
picked up and paid for approved plan mod
Plan assigned to (DRS)3/12/20123/12/20123/20/2012 PASS
DetailsDan Stuart
Routing - PLAN CHECK3/20/2012 3/20/2012 PASS
DetailsDan Stuart
Routing - MECHANICAL3/20/2012 3/20/2012 PASS
DetailsTroy James
New Sheets M3.3 & 4.1
PLANS/APPL TAKEN TO FRONT DESK  3/20/2012 PASS
Print Occupancy Form  3/20/2012 DONE
Telephone call  3/20/2012 DONE
DetailsChristina Prado
left message with Mark Sanders giving fees due and advising plan mod is ready
Override - Parcel Holds  3/20/2012  
Permit Ready to Issue  3/20/2012 DONE
DetailsChristina Prado
Routing - PLAN CHECK3/14/2012 3/19/2012 PEND
DetailsDan Stuart
Inserted Plan Sheets M3.3 & M4.1 into plans. Routing back to mechanical code plan review.
Plan resubmittals received  3/19/2012  
Received 2 copies of sheets M3.3 & M4.1 and taken to Troy James
Routing - FIRE3/13/2012 3/14/2012 PASS
DetailsScott Arellano
Attached updated IFC comments to plans. A separate cooking hood fire suppression system permit will be required.
Routing - MECHANICAL3/13/2012 3/13/2012 FAIL
DetailsTroy James
Talked to architect about return air location for furnace at kitchen. He was going to call Engineer.
Plan resubmittals received  3/12/2012 DONE
DetailsChristina Prado
Received two copies of plans E3.1.3. Gave to Dan Stuart
Plan Modification Accepted  3/12/2012 DONE
DetailsChristina Prado
PLAN MOD -- For installation of range hood in the coffee bar area of lobby 108. Sheets affected are A2.1.3, A3.4, A6.2, A7.1, M3.3 & M4.1. Plans routed to Dan Stuart for additional review
BLD-Framing/Rough-in3/6/20123/7/20123/7/2012PPASS
DetailsJim Sly
Cover inspection for rooms: 118, 119, 120, 221, 222, 223, 224, 325, 326, 327, 426, 427, Electrical Room #1 (159), Mechanical Room #1 (162), Elevator Equipment Room #1. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Framing/Rough-in3/1/20123/2/20123/2/2012PPASS
DetailsJim Sly
Inspection for pre-rock ceilings for Commons Area on 1st floor. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Energy code compliance2/27/20122/28/20122/28/2012PPASS
DetailsJim Sly
Energy code inspection (insulation) for units: 421, 422, 423, 424, 425, 321, 322, 323, 324, 325. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Framing/Rough-in2/26/20122/27/20122/27/2012PPASS
DetailsJim Sly
Rough-in and fire-caulking inspection for units: 421, 422, 423, 424, 425, 321, 322, 323, 324, 325 Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Energy code compliance2/16/20122/17/20122/17/2012PPASS
DetailsJim Sly
Energy code compliance inspection for units 113, 114, 115, 116, 117, 217, 218, 219, 220. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Framing/Rough-in2/16/20122/17/20122/17/2012APASS
DetailsJim Sly
Rough-in and fire-caulk cover inspection for the following units: 113, 114, 115, 116, 117, 217, 218, 219, 220, Elevator Shaft #2, Common Area Rooms - 459, 359, 259. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Conference2/16/20122/16/20122/16/2012PPASS
DetailsJim Sly
Energy and fire-caulking inspection for units 217-220. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Energy code compliance2/16/20122/16/20122/16/2012PPASS
DetailsJim Sly
rob - units 213-216 Phone #: ###-####
BLD-Conference2/10/20122/13/20122/13/2012PNR
DetailsJim Sly
Energy and fire-caulk inspection for units 417-420 & 317-320. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Energy code compliance2/9/20122/9/20122/9/2012PPASS
DetailsJim Sly
Units 413 thru 416 and 313 thru 316 for energy compliance and fire-caulking. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Energy code compliance2/7/20122/8/20122/8/2012PPART
DetailsJim Sly
Energy and fire-caulk inspection for units 413 through 420, Tower 2. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
Fire caulk not ready.....Shaft wall at top of elevator 1.....OK.
BLD-Framing/Rough-in1/19/20121/20/20121/20/2012PNR
DetailsJim Sly
Rough-in framing inspection for 4th floor south. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
Complete firestopping
BLD-Framing/Rough-in1/13/20121/17/20121/17/2012ANR
DetailsJim Sly
Inspect elevator shaft #1 for cover. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Other1/10/20121/10/20121/10/2012PPART
DetailsJim Sly
ROB Phone #: ###-####
Exterior shear nailing....Tower 2 West 1/2 of South wall and North wall west 1/2. OK
BLD-Other12/21/201112/22/201112/22/2011APASS
DetailsJim Sly
Shear nailing for walls and rated ceilings. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
shear walls 3rd flr 28/29
MISC ACTIONS  12/19/2011 DONE
Fire alarm review comments attached to BLD11-01267
Additional plans submitted  12/14/2011 PASS
New Sheets A2.5.1, A2.5.2, A2.5.3, A4.3, A4.5, A8.0, A8.1, A10.0 & A10.1 SUBMITTED 11/18/11 INSERTEDINTO OFFICE COPY OF PLANS AND COPY OF SHEETS TO JOB SITE FOR INSTALL IN FIELD COPY.
Sheets S2.3.3, S2.5.2, S2.5.3 & S5.1 SUBMITTED 11/18/11 INSERTED INTO OFFICE COPY OF PLANS AND COPY TO FIELD FOR JOB SET.
Telephone call  12/14/2011 DONE
Called Jim Sly, structural building inspector to pick up resubmittals plans and take to job site.
Additional plans submitted  12/14/2011 PASS
New Sheets A2.5.1, A2.5.2, A2.5.3, A4.3, A4.5, A8.0, A8.1, A10.0 & A10.1 SUBMITTED 11/18/11 INSERTEDINTO OFFICE COPY OF PLANS AND COPY OF SHEETS TO JOB SITE FOR INSTALL IN FIELD COPY.
Sheets S2.3.3, S2.5.2, S2.5.3 & S5.1 SUBMITTED 11/18/11 INSERTED INTO OFFICE COPY OF PLANS AND COPY TO FIELD FOR JOB SET.
Telephone call  12/14/2011 DONE
Called Jim Sly, structural building inspector to pick up resubmittals plans and take to job site.
BLD-Framing/Rough-in12/6/201112/7/201112/7/2011APART
DetailsJim Sly
Partial---Ed Phone #: ###-####
Insp of 2 shear walls 3rd floor center West. OK
BLD-Other11/17/201111/21/201111/21/2011APASS
DetailsJim Sly
shear nail insp//Rob ###-####
3rd story West wing shear walls (north).
Plan resubmittals received  11/18/2011 DONE
DetailsTisha Gallop
received Architects response, Engineer response, two copies of plan sheets A2.5.1, A2.5.2, A2.5.3, A4.3, A4.5, A8.0, A8.1, A10.0, A10.1 and three copies of plan sheets S2.3.3, S2.5.2, S2.5.3, S5.1; taken to Dan Stuart
CHANGE STATUS TO (ISS)  11/9/2011 DONE
DetailsTisha Gallop
Status accidentally changed to REV when Dan Stuart put routing activity on 10/13/11. This was not plan mod, just minor change to plans noted, per Dan this permit should be in issued status.
Routing - PLAN CHECK10/12/2011 10/13/2011 PASS
DetailsDan Stuart
New plan sheet A8.0 removing the lines shown in the stair enclosures and the reference note for an area of refuge in the stair enclosures as the building is fully sprinklered per Sec. 1007.3, exception 3, and the architect has declared that the required two-way communication system per Section 1007.8, is being installed at the elevator landings. See Sheets E3.2.2, E3.2.3, E3.3.2, E3.3.3, E3.4.2 & E3.4.3. New sheet inserted into plans and approved copy sent to job site for their plan set, with Jim Sly, Structural Inspector.
BLD-Foundation9/29/20119/30/20119/30/2011APART
DetailsJim Sly
Rob Phone #: ###-####
Center wing....Wall. MTI on site.
BLD-Footing9/28/20119/28/20119/28/2011PPART
DetailsJim Sly
rob Phone #: ###-####
Center wing....footing and wall sections. OK pending MTI insp, tests and approvals.
BLD-Footing9/27/20119/27/20119/28/2011PPART
DetailsJim Sly
Rob Phone #: ###-####
Center wing...MTI on site.
BLD-Foundation9/23/20119/23/20119/26/2011PPART
DetailsJim Sly
Rob Phone #: ###-####
Select walls Middle wing OK pending MTI tests, inspections and approvals.
Issue PAID IN FULL permit  9/9/2011 DONE
(F) Reprint permit  9/9/2011 DONE
Permit Ready to Issue  8/24/2011 DONE
DetailsTisha Gallop
Print Occupancy Form  8/23/2011 DONE
Route to Impact Fee Review8/1/20118/4/20118/22/2011 PASS
DetailsCindy M. Gould
Plan assigned to (DRS)6/10/2011 8/22/2011 PASS
DetailsDan Stuart
PLANS/APPL TAKEN TO FRONT DESK  8/22/2011 DONE
Routing - PLAN CHECK8/11/2011 8/20/2011 PASS
DetailsDan Stuart
Reviewed plans include required compliance with all attached plan reviews of all reviewing agencies and all red-line notes added to plans by reviewers.
Plan resubmittals received  8/16/2011 DONE
DetailsTisha Gallop
received three copies of response, structural calcs, and plan sheets S1.1, S2.1.3, S2.2.2, S2.2.3, S3.2; one set routed to outside engineering and two copies taken to Dan Stuart.
Telephone call  8/16/2011 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Routing Off Site - STRUCTURAL8/16/2011 8/16/2011 PASS
DetailsDan Stuart
See BLD11-01267 for final approval letter
Routing - PLANNING Land Div8/12/2011 8/15/2011 PASS
DetailsTodd Tucker
Routing - Design Review8/8/2011 8/11/2011 PASS
DetailsJosh Wilson
Ok per DRH10-00222 and DRH11-00173
Plan resubmittals received  8/10/2011 DONE
DetailsTisha Gallop
received response and three copies of plan sheets A0.0, A1.0, A2.1.1, A2.1.2, A2.1.3, A2.2.2, A2.2.3, A2.3.1, A2.3.3, A2.4.1, A2.4.3, A2.5.1, A7.2, A8.1, A9.0, A9.1, A9.3, A10.0, A10.1, M2.5.2, M2.5.3, P0.0, E2.1.2, E2.1.3, E2.2.2, E2.3.2, E2.3.3, E2.4.2, E2.4.3, E3.1.2, E3.1.3, E5.0; taken to Dan Stuart.
Routing - PLUMBING8/5/2011 8/8/2011 PASS
DetailsDaryl Spivey
Per plans and 2003 UPC.
Routing - FIRE8/1/20118/1/20118/5/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  8/5/2011 FAIL
Failed Public Works,Structural, Planning, Plan Check
Routing - PLAN CHECK8/5/2011 8/5/2011 PEND
DetailsDan Stuart
Plans routed back to plumbing for review of resubmittals.
Plan resubmittals requested  8/1/2011 DONE
Copy of plan review e-mailed to architect.
Routing - PLAN CHECK7/25/2011 8/1/2011 FAIL
DetailsDan Stuart
Resubmittals required. copy of plan review e-mailed to architect. Routing plans to fire code analyst for review.
Print Pending Permit.LaserJet4  8/1/2011  
Plan resubmittals received  7/25/2011 DONE
DetailsTisha Gallop
received response to plumbing plan review and two copies of plan sheets C1,C2, C3, C4, C5, C6, C7, C8 C9, P0.1, P1.0, P2.6, P2.7, P2.8, P2.0.1, P2.0.2, P2.0.3, P2.1.3; taken to Dan Stuart
Routing - MECHANICAL7/18/2011 7/19/2011 PASS
DetailsTroy James
Mechanical review not required on 4 story building per Bill Van DeGrift- 7-19-11//BAS
Plan resubmittals received  7/18/2011  
Received 2 copies of sheets M3.0, M3.1, M3.2, M3.3, M4.0, M5.0, M5.1 and inserted into plans
Routing - PUBLIC WORKS7/18/2011 7/18/2011 PASS
DetailsBeverly Mountain
Routing PW Drainage7/15/2011 7/15/2011 PASS
DetailsBrian Murphy
Routing - PLAN CHECK6/22/2011 7/13/2011 PEND
DetailsDan Stuart
Route to PW Brian Murphy re-review.
Plan resubmittals requested  7/1/2011 DONE
Copy of structural plan review to architect for response.
Routing Off Site - STRUCTURAL6/13/2011 6/30/2011 FAIL
DetailsBarbara Stitt
Called Action Courier for pick up
6-30-11 - Report from Structural Review. Project failed. Copy of report to Mark Sanders.
Routing - PLANNING6/20/2011 6/22/2011 FAIL
DetailsJosh Wilson
Plans are not consistent with DRH10-00222
Plan resubmittals received  6/21/2011  
DetailsBarbara Stitt
Received 1 cover transmital and 5 copies of civil plans inserted into plans//BAS
Routing - PLUMBING6/15/2011 6/20/2011 FAIL
DetailsBill VanDegrift
refer to bld11-01267
Routing - PLANNING  6/20/2011 PASS
DetailsCody Riddle
CUP10-00052-Cody Riddle
Routing - PLANNING Land Div6/14/2011 6/15/2011 FAIL
DetailsTodd Tucker
Do not issue Building Permit until the Property Line Adjustment Record of Survey (ROS11-00018) has been recorded and the existing irrigation and utility easement has been vacated.
Routing - Erosion and Sediment6/15/2011 6/15/2011 PASS
DetailsSteven Webb
ESC11-00348 plan approved with conditions attached to the permit.
Routing PW Sewer Design6/15/2011 6/15/2011 PASS
DetailsJavier Guzman
Sewer Tap Permit Required
Routing - PUBLIC WORKS6/10/2011 6/14/2011 FAIL
DetailsBeverly Mountain
Failed by Brian Murphy contact at ###-####
Failed by Peter McCullough contact at ###-####
Routing PW Sewer Rating6/14/2011 6/14/2011 PASS
DetailsConnie Baumgartner
Routing PW Solid Waste6/14/2011 6/14/2011 PASS
DetailsPeter J. McCullough
Routing PW Street Lights6/14/2011 6/14/2011 PASS
DetailsMike D Hedge
Routing - Addressing6/10/2011 6/13/2011 PASS
DetailsTerry Records
See Documents for Apts #
Routing PW Drainage6/13/2011 6/13/2011 FAIL
DetailsBrian Murphy
NEEDS REVISION
Pending Assignment by JCM6/10/2011 6/10/2011 DONE
DetailsJohn Menard
Plans ACCEPTED BY PLAN TECH  6/10/2011 DONE
DetailsBarbara Stitt
Intake Approval  6/10/2011 PASS
DetailsDan Stuart
Application received 6/8/20116/8/2011 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  6/8/2011 DONE
DetailsBarbara Stitt
Intake Approval  6/8/2011 FAIL
DetailsDan Stuart